..',=arcg
.A A
(ngl' [ !
- (
E UNITED STATES NUCLEAR REGULATORY COMMISSION
~4f s,- j/
WASHINGTON, D.C. 2055MKC1 August 3, 199 Docket No. 50-285 Mr. Terry. L. Patterson Division Manager - Nuclear Operations Omaha Public Power District fort Calhoun Station FC-2-4 Adm.
Post Office Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399
Dear Mr. Patterson:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) TO ASSIST CLOSURE OF NRR STAFF REVIEW 0F FORT CALHOUN GENERIC LETTER 89-10 PROGRAM (TAC NO.
M75664)
In response to your letter dated June 16, 1994, which stated that you had completed actions necessary to meet your commitments to Generic Letter (GL) 89-10, " Safety-Related Motor-0perated Valve Testing and Surveillance," a conference call was conducted among Mr. G. Cook and others of your staff, Mr. T. Westerman and others of the NRC Region IV staff, ar.d Mr. T. Scarbrough and others of the Office of Nuclear Reactor Regulation staff on July 13, 1994.
During this conference call, we stated our intent to close your GL 89-10 program by performing an in-house document review in lieu of an on-site inspection.
For this purpose, we request that you submit the following information for our review:
(a)
Summary of information detailed in Enclosure 2 of NRC memorandum dated July 12,1994 (items 04.04 through 04.11 and Part 1 issues).
(b)
Update of actions taken on inspection followup items and ongoing issues that were to be completed by June 28, 1994, as documented in NRC Inspection Report 50-285/94-05.
(c) Summary of M0V enhancements that are planned for future implementation.
(d) Statement of long-range intent related to rectifying the capability problems with the feedwater isolation valves as discussed in NRC Inspection Report 50-285/94-05.
(e) Current status of resolving PORV issues related to TMI Action Item II.D.1 (NRC Safety Evaluation dated June 3,1993).
It is not our intent for your staff to expend an excessive amount of resources in this effort.
Each item should be addressed concisely.
The need for amplifying information can be handled on a case-by-case basis.
r-hh f 9400000118 9408
}60_}'O PDR ADOCM 05000295 P
PDR (L
i Mr. Terry L. Patterson August 3,1994 Inspection followup items from NRC Inspection Report 50-285/94-05 need only be statused at the time of program closure. The formal closure of these items will be addressed during a future inspection.
This requirement affects fewer than ten respondents and, therefore, is not subject to Office of Management and Budget review under Public Law 96-511.
Thank you for your assistance in helping us to conclude our assessment of your GL 89-10 MOV program.
If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely, ORIGINAL SIGNED BY:
Steven Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV/V i
Office of Nuclear Reactor Regulation cc:
See next page i
i DISTRIBUTION:
' < Docket.F_ile 3 NRC & Local PDRs PD4-2 Reading S. Bloom E. Adensam T. Quay E. Peyton ACRS (10) (P-315)
OGC (15B18)
A. B. Beach, RIV J. Roe T. Scarbrough Arn "
0FC LA:PD4-2 PM:PS4-2 BC:EME D:PD4-20
/
v.Y /-w w
SBJo_&~ k NAME E/eyton>
ao om:p
/7suss-M TQuaysp-DATE 1/R/94
~7/19/94
~7 / 2094 4 / 3 /94 0FFICIAL RECORD COPY Document Name:
FC75664.RAI
4 Mr. Terry L. Patterson August 3,1994 Inspection followup items from NRC Inspection Report 50-285/94-05 need only be statused at the time of program closure.
The formal closure of these items will be addressed during a future inspection.
This requirement affects fewer than ten respondents and, therefore, is not subject to Office of Management and Budget review under Public Law 96-511.
Thank you for your assistance in helping us to conclude our assessment of your GL 89-10 MOV program.
If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely, ORIGINAL SIGNED BY:
Steven Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects - Ill/IV/V Office of Nuclear Reactor Regulation cc:
See next page l
RISIRIEM:
Docket File NRC & Local PDRs PD4-2 Reading S. Bloom E. Adensam T. Quay
'i. Peyton ACRS (10) (P-315)
OGC (15818)
A. B. Beach, RIV J. Roe T. Scarbrough
\\b.
OFC LA:PD4-2 PM:PA4-2 BC:EME D:PD4-27 NAME EFe7 ton SBJo>om: pk
//w< mo.0 Touay w
.c,
/
c.y f..
-p DATE 7/ A/94
~7/I3/94
~7 /lJ 94 4 / 3/94
/
0FFICIAL RECORD COPY Document Name:
FC75664.RAI
Mr. Terry L. Patterson
- Inspection followup items from NRC Inspection Report 50-285/94-05 need only be statused at the time of program closure.
The formal closure of these items will be addressed during a future inspection.
This requirement affects fewer than ten respondents and, therefore, is not i
subject to Office of Management and Budget review under Public Law 96-511.
Thank you for your assistance in helping us to conclude our assessment of your GL 89-10 M0V program.
If you have any questions about this matter, please do not hesitate to call me at 301-504-1313.
Sincerely, t
Steven Bloom, Project Manager Project Directorate IV-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Ragulation cc:
See next page i
i l
Mr. Terry L. Patterson Mr. Michael F. McBride, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1875 Connecticut Avenue, NW Washington, D.C.
20009-5728 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Raymond P. Mullikin, Reside ' Inspector U.S. Nuclear Regulatory Commission Post Office Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 i
Harold Borchert, Director Division of Radiological Health i
Nebraska Department of Health 301 Centennial Mall, South Post Office Box 95007 Lincoln, Nebraska 68509 j
Mr. James W. Chase, Manager Fort Calhoun Station 3
Post Office Box 399 Fort Calhoun, Nebraska 68023
- -