. arch 22,1996 :
M
- /
u i
Hr. John Trotter l
Polestar. Applied Technology j
, Suite 4 One~First Streett Los Altos', CA 94022
Dear:
Mr., Trotter -
4 In. response to your E-mail message to Charles E. Ader dated March 13, L
19.6,. enclosed please find'a test matrix on' passive autocatalytic-recombiners 9
o The test
- performance that will be conducted at Sandia National Laboratories.
matrix is preliminary and subject to chenge based on the results of the initial tests, Sincerely,
/S/ '
Asimios Malliakos Accident Evaluation Branch Division of Systems Technology Office of Nuclear Regulatory Research c
I
Enclosure:
- As stated
~
Distribution:-
DST Chron,' AEB r/f, Malliakos, Malliakos r/f, Rubin, Ader, King, Hodges T.
CF'
.Y h
\\
PDR Y' M DOCUMENT NAME: Trotter.LTR '
DISK: Asiolos #4 l'
To w.
,y.e ed. 4 wnwn, ine in v n : c copy m.ndo.ww e copy Hn wwoewn v No copy 4
0FFICE AEB/ DST /RES
- AE8-AE8-m NAME Malliakos/9a M Rubin devt Ader M k c4 A
.DATE 03/Z2/96 03/r.t/96 03/s.W96 '
03/
/96 03/
/96
.q i
OFFICIAL RECORD COPY
l(If more than one file Code) RES.___
{ 'L I n
i I
7 71 g 2 970702 iji
~
J N 7~129':POR f[
w
4:
k Preliminary Test Matrir to Evaluate the Performance of PARS t
i Test' Facility:
Surtsey at SNL Test-#
Purpose PAR Scale Atmosohere R
1 Startup.
1/2 2 bar. air,-no steam,.1%,.2%,.. 1%,
2.0%H, 2'
Startup & performance 2 bar air, no steam,
.8%,.9%,-1.0%,
1.3%H, 1 bar air, 1 bar steam,.7%,..
1.3%H, E.' 3 4
Scale a performance 1/2 1 bar air, I bar steam,. continuous injection of H, and 0, until PAR reaches steady state at 2.0%H,
,i
\\
5 1/8 1/4 6
NOTE:
The tests assume removal of the false floor and any structures-from the Surtsey facility that are directly under the PAR.
The rest of the supports (horizontal and vertical) will i
remain in place.
PAR location about 1 meter above the floor supports.
l 1.:
1
'^
?v y,
Test Matrix to Evaluate'the Performance of PARS'
. ;4 ~
Test Facility:
Surtsey at SNL
Purpose:
PAR Scale Atmosphere le;6 1
. Startup 1/2 2 bar air,-no' steam,.2%,.4%,.. 1%,
2.0%H, (See Note 1)
- 2 Startup & performance 2 bar' air, no steam,
.7,.8,
.9,
- 1.0,.... l.3%H, (See Note 1)
I bar air, I bar steam,.7, 1.3%H, 3
.(See Note 1) 4:
- Scale & performance 1/2 1 bar air, 1 bar steam, continuous injection of H, and 0, until PAR reaches steady state at 1.4%H, (See Note 2) 5
.1/8 (See Note 3)-
r SNL to provide test data from test #5, for NRC to decide if the next test is necessary 6-1/4 7
Performance.
1/8 1 bar air, 1 bar steam, continuous (This test will burn injection of H, and 0, until PAR reaches the hydroph 'aic coat) steady state at 7%H, Scaling maybe impacted by the hydrogen concentration.
A new test is proposed at 7%H, with 1/2 or 1/4 PAR to define PAR scaling at higher H, concentrations.
SNL to
. provide a cost estimate for the additional test.
8-
-Performance.of PAR.
.1/8
'Same injection as test-7 i
without the hydrophobic coat
,s.
PAR at wall to measure-1/8 Same conditions as test 5.
Use new short circuit effect-catalyst with hydrophobic coat
- 10 PAR at'vesse1' centerline 1/8 1:bar air,- I bar steam, quick injection of 10%H, 11.
' PAR ignites the mixture 1/8 1 bar air, 1 bar steam, about 15%H, v
A-
~
n
i
's NOTES:
(1)
Take gas grab samples after each hydrogen injection and after fans are turned off.
Allow PAR to cool (PAR has effectively stopped recombining H, and 0,) and use mixing fans before measuring final concentration.
Experiment will continue to test H, concentrations higher than the startup H, concentrations by.2 and.4%H -
2 (2)
The. l 4%H, concentration is a preliminary estimate of the highest H, concentration that will not burn the hydrophobic coat.
SNL to provide final estimate.
(3)
SNL to investigate if a 1/16 PAR can be used for all the tests that currently are
. proposed with 1/8 PAR.
The tests assume removal of the false floor and any structures from the Surtsey facility
'that are directly under the PAR.
The rest of the supports (horizontal and vertical) will remain in place.
PAR location about 1 meter above the floor supports.
Since the temperature readings from the PAR cartridges are very important more than 6 TCs should be placed in the PAR for additional temperature point measurements and in case some of the existing TCs malfunction The current funding level will support the first 6 or 7 tests.
March 26, 1996/tr A: MATRIXl Disk:
AM 4 1
)
l
4, 4
March 26. 1996/tr A:
MATRIXl Disk:
AM 4 4
9 I