ML20149D833

From kanterella
Jump to navigation Jump to search
Amends 211 & 211 to Licenses DPR-32 & DPR-37,respectively, Revising TSs to Eliminate Records Retention Requirements from Section 6.5 of TSs
ML20149D833
Person / Time
Site: Surry  
Issue date: 07/15/1997
From: Trimble D
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20149D834 List:
References
NUDOCS 9707180011
Download: ML20149D833 (6)


Text

', '

  1. 5470 UNITED STATES g

4 s

j NUCLEAR REGULATORY COMMISS60N WASHINGTON, D.C. 2065dHloC1

/

VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-280 SURRY POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 211 License No. DPR-32 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated November 26,1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9707100011 970715 PDR ADOCK 05000280 P

PDR

)

l 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-32 is hereby i

amended to read as follows:

(B) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 211, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION b

D d Trimble, Acting Project Director P oject Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 15, 1997 4

. f ct:u p

t UNITED STATES g

j NUCLEAR REGULATORY COMMISSION e

WASHINGTON, D.C. 20666-0001 os...../

VIRGINIA ELECTRIC AND POWER COMPANY DOCKET N0. 50-281 SURRY POWER STATION. UNIT N0. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 211 License No. DPR-37 1.

The Nuclear Regulatory Commission (the Commission) has found that:

I A.

The application for amendment by Virginia Electric and Power Company (the licensee) dated November 26, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

j i

t l

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No. DPR-37 is hereby amended to read as follows:

(B) Technical Soecifications The Technical Specifications contained in Appendix A, as revised l

through Amendment No. 211, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days.

l FOR THE NUCLEAR REGULATORY COMMISSION

/

T W

vid Trimble, Acting Project rector Project Directorate 11-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 15,1997 l

a ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 211 TO FACILITY OPERATING LICENSE NO. OPR-32 AMENDMENT NO, 211 TO FACILITY OPERATING LICENSE NO. DPR-37 i

DOCKET NOS.'50-280 AND 50-281 Revise Appendix A as follows:

Remove Paaes Insert Paae TS 6.5-1 TS 6.5-1 l

TS 6.5-2 TS 6.5-3 1

l

l l

TS 6.51 Section 6.5, " Station Operating Records," has been relocated to the Operational Quality Assurance Program, and Pages TS 6.5-2 and TS 6.5-3 have been deleted in their entirety.

1 i

Amendment Nos.

211 and 211