Forwards Insp Repts 50-334/93-16 & 50-412/93-17 on Stated Date.Two non-cited Violation Noted
ML20149D478
Person / Time
Site: Beaver Valley
Issue date: 09/10/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20149D484 List:
References
NUDOCS 9309210048
Download: ML20149D478 (3)


See also: IR 05000334/1993016

Text

i

~

.. .

,

SEP l 01993

'

Docket Nos. 50-334

50-412

Mr. J. D. Sicher

Senior Vice President

,

Nuclear Power Division

Duquesne Light Company

1:ost Office Box 4

Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-334/93-16 AND 50-412/93-17

This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of

-

this office from July 21 to August 23,1993. The inspection included a review of activities

authorized for the Beaver Valley Power Station in Shippingport, Pennsylvania. At the

conclusion of the inspection, the findings were discussed with Mr. D. Spoerry and other

members of your staff.

Areas examined during the inspection are identified in the report. The inspection consisted

of document reviews, interviews, and observation of activities important to public health and

safety. The purpose of the inspection was to determine whether activities authorized by the

license were conducted safely and in accordance with NRC requirements.

,

Two non-cited violations were identified. Your staffidentified that a Unit I hydrogen

analyzer train was inoperable. Also, the manner in which you posted NRC Form 3 did not

allow the form to be directly seen by individuals passing by. These violations are not being

,

cited because of their minor safety significance and your corrective actions.

No reply to this 1ctter is necessary. Your cooperation with us is appreciated.

Sincerely,

James C. Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

,

9309210048 930910

PDR

ADOCK 05000334

G

PDR-

OFFICIAL RECORD COPY

[u

l

!

--

- -

-

-

. . .

.

..

"

.. .

"

SEP 101993

.

Mr. J. D. Sieber

2

Enclosures:

1.

NRC Inspection Report Nos. 50-334/93-16 and 50-412/93-17

2.

Attachment A, Employee Concerns Programs

cc w/encis:

G. S. Thomas, Vice President, Nuclear Services

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

K. D. Grada, Manager, Quality Services Unit

N. R. Tonet, Manager, Nuclear Safety Department

,

'

H. R. Caldwell, General Superintendent, Nuclear Operations

K. Abraham, PAO (2 copies)

'

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

i

State of Ohio

P

>

h

9

-

$

OFFICIAL RECORD COPY

P

-

-

.,

.

SEP 101993

.

Mr. J. D. Sieber

3

bec w/encls:

Region I Docket Room (with concurrences)

W., Lazarus, DRP

bec w/encls: (VIA E-MAIL):

W. Butler, NRR

G. Edison, NRR

.

'

D. Wheeler, OEDO

J. Lanning, DRP (see Section 5.5 and Attachment A)

R. Rosano, OWFN 7-H-5 (see Section 5.5 and Attachment A)

J. Calvert, DRS (see Section 2.6)

t

vg'

RI:DRP

RI:DRP

.R>

LRossbach

WLa ' s

/

..i ville

09/01/93

/

k 7//8/

OFFICIAL RECORD COPY

A:BV931617.MEO