SEP l 01993
'
Docket Nos. 50-334
50-412
Mr. J. D. Sicher
Senior Vice President
,
Nuclear Power Division
Duquesne Light Company
1:ost Office Box 4
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-334/93-16 AND 50-412/93-17
This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of
-
this office from July 21 to August 23,1993. The inspection included a review of activities
authorized for the Beaver Valley Power Station in Shippingport, Pennsylvania. At the
conclusion of the inspection, the findings were discussed with Mr. D. Spoerry and other
members of your staff.
Areas examined during the inspection are identified in the report. The inspection consisted
of document reviews, interviews, and observation of activities important to public health and
safety. The purpose of the inspection was to determine whether activities authorized by the
license were conducted safely and in accordance with NRC requirements.
,
Two non-cited violations were identified. Your staffidentified that a Unit I hydrogen
analyzer train was inoperable. Also, the manner in which you posted NRC Form 3 did not
allow the form to be directly seen by individuals passing by. These violations are not being
,
cited because of their minor safety significance and your corrective actions.
No reply to this 1ctter is necessary. Your cooperation with us is appreciated.
Sincerely,
James C. Linville, Chief
Projects Branch No. 3
Division of Reactor Projects
,
9309210048 930910
ADOCK 05000334
G
PDR-
OFFICIAL RECORD COPY
[u
l
!
--
- -
-
-
. . .
.
..
"
.. .
"
SEP 101993
.
Mr. J. D. Sieber
2
Enclosures:
1.
NRC Inspection Report Nos. 50-334/93-16 and 50-412/93-17
2.
Attachment A, Employee Concerns Programs
cc w/encis:
G. S. Thomas, Vice President, Nuclear Services
D. E. Spoerry, Vice President, Nuclear Operations
L. R. Freeland, General Manager, Nuclear Operations Unit
K. D. Grada, Manager, Quality Services Unit
N. R. Tonet, Manager, Nuclear Safety Department
,
'
H. R. Caldwell, General Superintendent, Nuclear Operations
K. Abraham, PAO (2 copies)
'
Public Document Room (PDR)
'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
i
State of Ohio
P
>
h
9
-
$
OFFICIAL RECORD COPY
P
-
-
.,
.
SEP 101993
.
Mr. J. D. Sieber
3
bec w/encls:
Region I Docket Room (with concurrences)
W., Lazarus, DRP
bec w/encls: (VIA E-MAIL):
W. Butler, NRR
G. Edison, NRR
.
'
D. Wheeler, OEDO
J. Lanning, DRP (see Section 5.5 and Attachment A)
R. Rosano, OWFN 7-H-5 (see Section 5.5 and Attachment A)
J. Calvert, DRS (see Section 2.6)