ML20149D317
| ML20149D317 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/13/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20149D321 | List: |
| References | |
| NUDOCS 9309210006 | |
| Download: ML20149D317 (3) | |
See also: IR 05000352/1993020
Text
n
'7:
,
4
?
o a
Docket Nos. 50-352
50-353
Mr. D. M. Smith
Senior Vice President-
Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
'
Wayne, PA 19087-0195
,
Dear Mr. Smith:
SUBJECT: INSPECTION REPORT NOS. 50-352/93-20 AND 50-353/93-20
This letter refers to the announced inspection conducted by Mr. J. Carrasco of this office
from August 16-20,1993, at the Chesterbrook office and the Limerick Generating Station,
Units 1 and 2, in Sanatoga, Pennsylvania. The inspector discussed the results of the
inspection with Mr. J. Muntz and other members of your staff at the conclusion of the
inspection.
This inspection focused on activities important to the public health and safety, and was
directed towards engineering technical support activities, with emphasis on the adequacy of
design modification process, configuration management, performance enhancement program
.
(PEP), emergency service water (ESW), and residual heat removal service water (RHRSW)
improvement program.
Details on the areas examined during the inspection are described in the NRC Region I
inspection report, which is enclosed with this letter. Within these areas, the inspection
consisted of selected examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed. The engineering
)
'
organization displavco effective and efficient engineering support to the plant. Adequate
team work and effective communication between corporate and site engineering was noted.
OFFICIAL RECORD COPY
A: LIM 9320.1NS
i
9309210006 930913
-
1 i
ADOCK 05000352
(
G
l
. , - . -
.-
-
s
-A
.
SEP 131993
.
Mr. D. M. Smith
2
No reply to this letter is required. Your cooperation in this matter is appreciated.
Sincerely,
,
Jacque P. Durr, Chief
i
Engineering Branch
Division of Reactor Safety
,
Enclosure: NRC Region I Inspection Report Nos.
50-352/93-20 and 50-353/93-20
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
D. R. Helwig, Vice President - Limerick Generating Station
G. A. Hunger, Jr., Manager - Licensing Section
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
.
OFFICIAL RECORD COPY
A: LIM 9320. INS
..
.
SEP 13 7393
Mr. D. M. Smith
3
bec w/cncl:
Region i Docket Room (with concurrences)
bec w/cncl: (Via E-Mail)
V. McCree, OEDO
F. Rinaldi, NRR
M. Boyle, Acting PDI-2, NRR
(VIA FeMAIL AND NO A'ITACIIMENTS)
J. Durr, DRS
-
II. Gray, DRS
J. Carrasco, DRS
,
1
j-
\\
bec=>~
l
RI:DRS
Rl:DRS
RI:DRS
Car. o/dmg
Gray
Durr
fb(1i
c
6/93
09/f/93
09//J/93
OFFICIAL RECORD COPY
A: LIM 9320. INS
'
--
-
-
.
.
,
- - - - - . .
.