SEP i 4 5 0
Docket No 50-309
Mr. Charles D. Frizzle
President
Maine Yankee Atomic Power Company
83 Edison Drive
1
!
Augusta, Maine 04336
Dear Mr. Frizzle:
SUBJECT:
INSPECTION NO. 50-309/93-18
This transmits the July 28 through August 29,1993, routine inspection findings of Messrs.
C. Marschall, W. Olsen, and P. Sena at the Maine Yankee Atomic Power Plant, Wiscasset,
3
Maine. These findings were based on observations of activities, interviews, and document
reviews, and have been discussed with Mr. Blackmore of your staff.
During the inspection, we noted good plant management involvement in daily outage
activities. Your identification of a possible generic issue related to malfunction of RMS-9
,
overcurrent trip relays was appropriate. However, we noted a failire to properly compensate
'
for an inoperable fire hose station in accordance with technical specification requirements and
i
station tagging procedures. This violation is not being cited because you promptly identified
and corrected the situation and the impact on safety was small. Overall, the inspectors noted
good material condition of emergency diesel generators during the refueling outage
preventive maintenance activities,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
No response to this letter is necessary. Thank you for your cooperation.
Sincerely,
l
. ORIGillAL SIGNED BY:
3 - 9[W
James C. Linvi le, Chief
1
Projects Branch No. 3
Division of Reactor Projects
j
Enclosure: NRC Region i Inspection Report 50-309/93-18
'
.
OFFICIAL RECORD COFX
i
9309210003 93o914
ADOCK 05000309
G
I
)
e
!
l
'1
~
SEP M E B
'
cc w/ encl:
4
G. Leitch, Vice President, Operations
P. Anderson, Project Manager (Yankee Atomic Electric Company)
R. Blackmore, Plant Manager
L. Diehl, Manager of Public and Governmental Affairs
,
J. Ritsher, Attorney (Ropes and Gray)
P. Dostie, State Nuclear Safety Inspector
i
P. Brann, Assistant Attorney General
U. Vanags, Maine State Planning Office
i
C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset
Maine State Planning Officer
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2 copics)
NRC Resident Inspector
1
i
l
\\
OFFICIAL RECORD COPY
'i
.
iJ
..
,..
SEP I 4 !!B3
-
Mr. Charles D. Frizzle
3
bec w/ encl:
Region I Docket Room (with concurrences)
W. Lazarus, DRP
bec w/enci (VIA E-MAIL):
V. McCree, OEDO
E. Trottier, LPM, NRR
W. Butler, NRR
,
1
)
h'[
RI:DRP
RI:DRP
RI:D P
'
Olsen
Marschall
is
inville
9/7/93
//
T/n/43
0//
'Y
OFFICIAL RECORD COPY
A:M Y9318.MEO