Text
.
[faatogg'o UNITED STATES o'
i g
NUCLEAR REGULATORY COMMISSION g
g D
tj WASHINGTON, D. C,20555
\\..../
DUOVESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT _NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.123 License No. DPR-66 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Duquesne light Company, et al.
(the licensee) dated April 13, 1987 and supplemented by letters dated December 2, 1987 and January 25, 1988 complies with the standards and reouirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Ccmission; C.
There is reasonable assurance (i) that the activities authorized by this amenchnent can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the publict and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
8804190n70 000407 fDR ADOCK 05000334 PDR
o i
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(21 of Facility Operating License No. DPR-66 is hereby amended to read as follows:
(2) Technic _al Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.123, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective on issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY C0tti!SSION o
r F. Stolz, Direct r r ject Directorate
-4 vision of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 7,1988
ATTACHMENT TO LICENSE AMENOMENT NO.123 FACILITY OPERATING LICENSE N0. DPR-66 DOCKET NO. 50-334 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Insert 3/4 3-62 3/4 3-62 3/4 3-64 3/4 3-64 3/4.3-66 3/4 3-66 3/4 11-20 3/4 11-?O
- ~ " ' '
TABLE 3.3-13 (Continued) ey<
RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMElfI"rION ie t<
. MINIMUM Q
CHANNELS INSTRUMENT OPERABLE APPLICABILITY PARAMETER ACTION z
4.
Waste Gas Decay Tanks Monitor a.
Oxygen Monitor (2)
Oxygen 31 (O -AS-GW-110-1,2) 2 R
w Ie M
N,,
y
- During waste gas decay tank filling operation.
,3, O
w
TABLE 3.3-13 (Continued)
ACTION STATEMENTS ACTION 31 -
With the number of channels OPERABLE one less than required by the Minimum Channels-OPEP.ABLE requirement, operation of this system may continue provided grab samples are obtained every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and analyzed within the following 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during additions to a tank.
ACTION 32 -
With the number of channelt OPERABLE less than required by the Minimum Channels OPERABLE requirement, effluent releases via this pathway may continue provided samples are continuously collected with auxiliary sampling equipment as required in Table 4.11-2 or sampled and analyzed once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
l l
l l
l l
BEAVER VALLEY - UNIT 1 3/4 3-64 Amendment No. 44,142,123 l
l
TABLE 4.3-13 (Cotatinued) 1; to S
N
. RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION StIRVF.II. LANCE REQUIREMENTS w
t<
CHANNEL y
CHANNEL SOURCE CHANNEL FUNCTIONAL k
INSTRUMENT CHECK CHECK CALIBRATION TEST i
C 3e b.
Particulate Activity Monitor W
N/A N/A N/A g
c.
System Effluent Flow Rate D
N/A R
Q-Measuring Device (FR-VS-112) d.
Sampler Flow Rate Measuring D
N/A R
Q Device w
N^
4.
Waste Gas Decay Tanks Monitor Y
e a.
Oxygen Monitor D
N/A Q(4)
M (O -AS-GW-110-1,2) 2
'I
~
~
t+
0 i
m
J
~-
4 RADIOACTIVE EFFLUENTS GAS STORAM T?l!!'.S LIMITING CONDITION FOR OPERATION 3.11.2.5 The quantity cf radioactivity contained in each gas storage tank shall be limited to 152,000 curies noble gases (considered as Xe-133).
APPLICABILITY:
At all times.
ACTION:
a.
With the quantity of radioactive material in any gas storage tank exceeding the above limit, immediately suspend all additions of radioactive material to the tank and within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> reduce the tank contents to within the limit, and b.
Submit a Special Report to the Commission within 30 days pursuant to specification 6.9.2 and include a schedule and a description of activities planned and/or taken to reduce the contents to within the specified limits.
c.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.11.2.5.1 The quantity of radioactive material contained in each gas storge tank shall be determined to be within the above limit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when radioactive materials are being added to the tank.
Performance of this surveillance is required when the gross concentration of the primary coolant is > 100 pCi/ml.
BEAVER VALLEY - UNIT 1 3/4 11-20 Amendment No. 9%.123