'Mr. Richard D. Porco, Senior Director
.Ellis & Watts Division of Dynamics Corporation of America 4
4400 Glen Willow Lake Lane j# Batavia, OH 45103
SUBJECT:
ELLIS & WATTS LETTER OF MAY 9, 1997, REGARDING DEDICATION PROCEDURE ENG-109
Dear Mr. Porco:
j We have reviewed your letter of May 9, 1997, in which you asked the NRC whether changes were i
warranted to Ellis & Watts (E&W) procedure ENG-109 regarding identification of materials of j
construction as critical characteristics. Your request was based upon a May 1, 1997, letter to E&W from the Tennessee Valley Authority (TVA) requesting you to revise ENG-109 to indicate that 4
materials may not always be a critical characteristic. While we regret that we cannot respond to your specific questions regarding revision of your )rocedure ENG-109, the attached document
'NRC Commercial Grade Procurement and Dedication Worksiop," dated April 21 and 22, 1993, addresses the NRC's approach to assessing the identification and verification of critical j
characteristics.
In addition, we provide the following information.
j 1
Criterion III of Appendix B to 10 CFR Part 50, " Design Control," requires, in part, that 1
i measures shall be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions
}
of the structures, systems and components. Based on the above criterion, the licensee or supplier is responsible for identifying the design, material, and performance (critical) characteristics that have a direct effect on the item's ability to accomplish its safety i
i function. There may be instances where licensees or suppliers could technically justify that a i
material is not a critical characteristic.
In such instances, justification needs to be based i
on the application and environment of the item being dedicated and supported by purchaser j
documentation.
i i
!!ncerely, l
(Original Signed By) i Robert M. Gallo, Chief i
Special Inspection Branch j
Division of Inspection and Support Programs y
4 i
Office of Nuclear Reactor Regulation
/
9707080122 970627 Docket: 99901308 PDR GA999 EMV*****
99901308 PDR Distribution j
HChristensen, RII JJaudon, RII rd I
e es PUBLIC M 0 0 :1 3 Docket Files i
- Previously concurred I'l -r 3/
DOCUMENT NAME: G:\\GAUTAM\\E&WPROC1.RES To receive a copy of this document, indicate in the box:
"C" - Copy without enclosures l
- E' = Copy with enclosures "N" - No copy
/%
)
0FFICE PSIB: DISP E
PSIB: DISP DRCH:HQMB l
OGC l
TSIlkfblSP l P NAME ASGautam GCCwalina SCBlack RMGallo
- pg/09/97*
DATE 06 06/10/97*
06/17/97*
06/18/97*
NAME (PCM14sfie l
DATE 16//A97 i
0FFICIAL RECORD COPY i
%gqu(
M'hh
\\'
~
paar y'
S UNITED STATES g
j NUCLEAR REGULATORY COMMISSION o
e WASHINGTON, D.C. 2006tH201
'%4 June 27,1997 Mr. Richard D. Porco, Senior Director Ellis & Watts Division of Dynamics Corporation of America 4400 Glen Willow Lake Lane i
Batavia, OH 45103
SUBJECT:
ELLIS & WATTS LETTER OF MAY 9, 1997, REGARDING DEDICATION PROCEDURE ENG-109
Dear Mr. Porco:
We have reviewed your letter of May 9, 1997, in which you asked the NRC i
whether changes were warranted to Ellis & Watts (E&W) procedure ENG-109 regarding identification of materials of construction as critical characteristics.
Your request was based upon a May 1, 1997, letter to E&W from the Tennessee Valley Authority (TVA) requesting you to revise ENG-109 to l
indicate that materials may not always be a critical characteristic. While we regret that we cannot respond to your specific questions regarding revision of your procedure ENG-109, the attached document "NRC Commercial Grade Procurement and Dedication Workshop," dated April 21 and 22, 1993, addresses the NRC's approach to assessing the identification and verification of critical characteristics.
In addition, we provide the following information.
Criterion III of Appendix B to 10 CFR Part 50, " Design Control," requires, in part, that measures shall be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-rel.ated functions of the structures, systems and components.
Based on the above criterion, the licensee or supplier is responsible for identifying the design, material, and performance (critical) characteristics that have a direct effect on the item's ability to accomplish its safety function. There may be instances where licensees or suppliers could technically justify that a material is not a critical characteristic.
In such instances, justification needs to be based on the application and environment of the item being dedicated and supported by purchaser documentation.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room (PDR).
Sincerely
/
q t
Rober 1,
ae Special Inspection Branch Division of Inspection and Support Programs Docket: 99901308
U.S. NUCLEAR REGULATORY COMMISSION j
COMMERCIAL GRADE PROCUREMENT j
AND DEDICATION WORKSHOP i
l l
MEETING FACILITIES-TEST TOWER GROUND FLOOR
)
i g
Arono 8004 Sn w Boom
}{
utETiNo R00xs-Stc0xD rt00R l p.3 e
m e,1... _&w
,3yu
-c
~a s nn.
pa e -
e-e e =q l
e-i
=
.j,A t
i j
w1 i
i l
l g
_ nu =
E]!!_
bl l
^
.oa a; g.;e-a s T_
l g
e-l
[~,af SD11NE BALLROOMS 12TH FLOOR WEST TORIR i
HYATT REGENCY HOTEL 4
i WEST TOWER MEETING ROOMS i
3
i-i 1
l NRC COMMERCIAL GRADE PROCUREMENT AND DEDICATION i
WORKSHOP l
l The Hyatt Regency Hotel l
Dallas / Fort Worth Airport l
l April 21 and 22,1993 I
WORKSHOP PROGRAM l
pRREGy I
8 t
. c**. y*
l i
Sponsored by
{
Office of Nuclear Reactor Regulation j
U. S. Nuclear Regulatory Commission
)
i
'I
'i 4
3 UNITED STATES NUCLEAR REGULATORY COMMISSION COMMERCIAL GRADE PROCUREMENT AND DEDICATION WORKSHOP APRIL 21-22,1993 THE HYATT REGENCY HOTEL DALLAS / FORT WORTH AIRPORT DALLAS, TEXAS 75261 i
(214) 453-1234 WORKSHOP PROGRAM t
4 TUESDAY, APRIL 20,1993 7:00 - 9:00 p.m.
PRE-REGISTRATION 1
DAY ONE WEDNESDAY. APRIL 21.1993 4
7:00 - 8:00 a.m.
REGISTRATION (2001 BALLROOM-WEST TOWER) 3 i
j I
PT FNARY SESSION (SKYLINE BALLROOM B - 12TH FLOOR, WEST TOWER) 8:00 a.m.
INTRODUCTORY REMARKS / GENERAL Ernie Rossi, NRR OVERVIEW-COMMERCIAL GRADE PROCUREMENT AND DEDICATION i
d AGENDA Leif Norrholm, NRR DEDICATION ISSUES Uldis Potapovs, NRR INSPECTION PROCESS Roy Zimmerman, NRR 8:45 a.m.
NUMARC PERSPECTIVE Alex Marion Biff Badley I
9:45 a.m.
BREAK i
WORKSHOP PROGRAM 1
DAY TWO i
THURSDAY. APRIL 22.1993 SKYLINE BALLROOM B f
I FFFDBACK SESSION 8:00 a.m.
SUMMARY
OF BREAK-OUT SESSIONS II OUESTION AND ANSWER SESSION s
i 9:00 a.m.
NRC REPRESENTATIVES TO PROVIDE RESPONSES TO WORKSHOP A'ITENDEES' QUESTIONS.
l 10:45 a.m.
BREAK i
III
SUMMARY
/ CLOSING REMARKS l
11:00 a.m.
NUMARC Alev Mraion 11:30 a.m.NRC Ernie Rossi, NRR END OF WORKSHOP