ML20148R309

From kanterella
Jump to navigation Jump to search
Forwards LER 96-037-03,documenting an Event That Occurred at Mnps,Unit 1 on 970529.Commitments Made within Ltr,Submitted
Date released: 06/10/2020 Download: ML20148R309


:on 960327,noted That Apr Sys May Not Be Single Failure Proof.Caused by Misinterpretation of Design Basis Requirements.Will Revise SBLOCA Long Term Cooling Analysis to Include FWCI as ECCS Sys
ML20148R338
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1997
From: Robert Walpole
NORTHEAST NUCLEAR ENERGY CO.
To:
References
Download: ML20148R338 (4)