Forwards IE Inspec Rept 99900066/78-02 on 780717-21 & Notice of Violation
ML20148Q261
Person / Time
Issue date: 08/03/1978
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Warren M
TEXAS PIPE BENDING CO. OF PUERTO RICO (SUBS. OF BENDI
Shared Package
ML20148Q220 List:
References
REF-QA-99900066 NUDOCS 7811290373
Download: ML20148Q261 (2)


Text

E'

~

g R K8%g#

o UNITED STATES God. I% l NUCLEAR REGULATORY COMMISSION l E o REGION IV 5,

  • $ 611 RYAN PLAZA DRIVE, SUITE 1000 AR LINGTON. TEXAS 76011

+.***/ 0 3 AUG 1978 Docket No. 99900066/78-02 l Texas Pipe Bending Company ATTN: Mr. M. C. Warren President Post Office Box 5188 Houston, Texas 77012 Gentlemen: -

This refers to the QA Program inspection conducted by Mr. I. Barnes of this office on July 17-21, 1978 of your facility at Houston, Texas associated with the fabrication of nuclear piping assemblies and to the discussions of our findings with Mr. B. A. Graham and members of your staff at the conclusion of the inspection. '

This inspection was made to confirm that, in the areas inspected, your QA ' ogram is being effectively implemented. The inspection effort is no; designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product,

-component or service provided by you to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the' inspection it was found that the implementation of your QA ,

Program failed to meet certain NRC requirements. The specific findings <

and references to the pertinent requirements are identified in the enclo-sures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence ~, and (3) the date your corrective actions and preventive measures were or will be completed.

'7811290373

l i

Texas Pipe Bending Company 1 In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of t::is letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room. If this report contains any information that you believe to be pre. letary, it is necessary that you make a written application within thir'y t (30) days to this office to withhold such infonnation from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infonnation identified in the application is contained in a separate part of the document. If we d o not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, J k

)pU.Potapovs, ChiefBranch Vendor Inspection a

Enclosures:

1. Notice of Deviation
2. Inspection Report No. 99900066/78-02

%