ML20148P882
| ML20148P882 | |
| Person / Time | |
|---|---|
| Issue date: | 12/23/1980 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Ahearne J, Gilinsky V, Hendrie J NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8101150862 | |
| Download: ML20148P882 (3) | |
Text
COMM/ S 5 4 34 "T?? ADS / TioQ
- - p..uu
/
4, UNITED STATES 3
NUCLEAR REGULATORY COMMISSION r{
,, j WASHINGTON, D. C. 20655
....+
December 23, 1980
' MEMORANDUM FOR:
Chaiman Ahearne Comissioner Gilinsky i
Commissioner Hendrie Commissioner Bradford FROM:
William J. Dircks, Executive Director for Operations
SUBJECT:
DAILY STAFF NOTES, DECEMBER 22, 1980 NRR MEETING WITH DUKE POWER COMPANY - MCGUIRE HYOROGEN CONTROL MEASURES The staff will meet with the Duke Power Company to discuss all aspects of hydrogen control measures relating to McGuire.
The meeting will be Tuesday, December 23,1980 at 9:30 a.m. in Room P-422.
S P, 1.
Based on a recent review of the Idaho radiation control program, the staff has infomed Idaho of its opinion that the State's program for regulation of agreement materials is adequate to protect the public health and safety and is compatible with the Commission's program.
Meg 2.
Based on a recentsreview of Florida radiation control program, the staff has informed Florida of its opinion that the State's program for regulation of agreement materials is adequate to protect the public health and safety and is compatible with the Comission's program.
en gBL j
e n
3
< r uc f j bb 2
330115086
p..
a REGION I PL AN STATUS-12/22/So PLANT NAME PLANT STATUS REASON OR COMMENT i
__.,%~ POWER _ DOWN_____
~
- BEAVER VALLEY 1 X
i POTENTIAL LEAK THROUGH PRESSURIZER SAFETY VALVE CALVERT CLIFFS 1 l
X 1 PREPARING T0-00 TO POWER CALVERT CLIFFS '
65 I
I COASTINO DOWN FIT 2 PATRICK i 100 1
1 GINNA 100 1
HADDAM NECK i 100 l
i JNDIAN POINT I
X I REPAIR FAN COOLERS INDIAN POINT 3 GS I
- SLOW RETURN TO FULL POWER m;AINE YANKEE I
GQ RETURNING TO FULL POWER FROM i
MAIN OUTAGE l
?;ILLSTONE 1 1
i X
DEFUELED tE:L$ TONE 2 i 100 i
NJINE MILE POINT 1 i
80
! RETURNING TO POWER FROM i
l SHUTDOWN OYETER CREEK i
9' CONDENSATE DEMINERALIZER DP
~
PEACH BOTTOM 2
- 100 1
PEACH BOTTOM 3 1
1 X
i TRIP DUE TO FW SYSTEM i
l l
MALFUNCTION - PREPARING To
(
RESTART PILGRIM 1 1 100 l
SALEM i i
1 X
! REFUELING
~
SALEM 2 1
i X
AWAITING LICENSE TH.;EE MILE ISLAND 1 X
1 NRC ORDER THREE MILE ISLAND 2 X
! NRC ORDER VERMONT YANKEE I
1 X
REFUELING YANKEE ROWE I 100 l
I REGION II PLANT STATUS-12/22/SO PLANT NAME PLANT STATUS REASON OR COMMENT
________________________% POWER __DOWN__________________________________.
D'; OWNS FERRY 1 99 l
TOCWNS FERRY 2 99 DROWNS FERRY 3 i
X 1 REFUELINO DRUNSWICK 1 l
85 l
t CONDENSER VACUME PROBLEMS N,UNSWICK 2 1
40 t
i INCREASING POWER i
CRYSTAL RIVER 3 i 100 t
i Fr.R_EY 1 i
i X
- AD:1INISTRATIVE LIMIT W/,TCH 2 i
i X
1 REFUELIN3 Nr.37M ANNA 1 61 i
i CO.1ST DOWN
!!C.;TH ANNA 2 1 100 l
i L.CGNEE 1 1 100 l
1 C:.ON~E 2 98 1
{
00.ONEE 3 X
t REFUELING i. ' C I'. 20N '
100 1
1 SEQUOYAH 1 1
44
- HAVING WATER QUALITY PROBLEMS ST. LUCIE 1 1 100 i
SURRY 1 1
X l
S.
O.
REPLACEMENT CUEY 2 1 100 1
I TU.; KEY POINT 3 l 100 TURKrIY POINT 4 I
t X
! REFUELING
[
~
- n.:.vww.s 4.u c m.v..
.eive-w w vv
- PLANT NAME PLANT STATUS REAScrN OR COMMENT RF v.'4 c L*/. POWER _DOWN-BIG ROCK PGINT t
X
! REFUELING t
COOK 1 1 100 1
i CODv.' 2 l 100 i
i D:W I S-BES9E 1 i.
55
! WORK COMPLETE ON FW PUMPS
'4
-Xl l CHEMICAL CLEANING 1
,/
DTsESDEN 1 k8 DRESDEN 2 47
! COASTDOWN
- 0RECDEN 3
.. I.K
- TECH SPEC VIOLATION i
CONTAINMENT INTEGRITY BROKEN 1
.. l.
. t.1,
7, WHILE NOT IN COLD SHUTDOWN DUANE ARNOLD 07 1
! INCREASING POWER AND t
I PRECONDITIONINO l'EWAUNEE
! 100 1
1 LACROSSE 1
X i REFUELINO LASALLE i
X i AWAITING LICENSE MONTICELLO 200 PALI?ADES t
99 POINT PEACH 1 X
- REFUELING FOINT BEACH 2'
! 100 1
S't4IRIE ISLAND I i 100 i
PRAIRIE ISLAND 2 1 100 1
- QUAD CITIES 1 l
24 RETURNINO TO POWER FOLLOWING I
REFUELING GUAD CITIES 2 I
95 t
ZION 1 1
94 ZION 2 1
93 I
i LIMITED BY LOW PRESSURE' I
t i
TURBINE REGION IV PLANT STATUS-12/22/80 PLANT NAME PLANT STATUS REASON OR COMMENT F.
~
_____/. POWER DOWN_
A9 KANSAS 1 72
! 3 PUMPS LIMIT 1 LEAKING PUMP 4ARKANSA? 2 1
17 i CONDENSER TUBE LEAKS OOFER I
98 1
FORT CALHOUN I
75 i
L ADMINISTRATIVE CONTROL (FUEL CONSERVATION)
FORT ST. VRAIN 4
68 t 70% POWER LIMIT REGION V PLANT STATUS-12/22/00 PLANT NAME PLANT STATUS REASON OR COMMENT 5
a
___/. POWER DOWN DIABLO CANYON i
I X
l AWAITING LICENSE i
RANCHO SECO t 100 1
SAN ONO~RE X
SG RESLEEVING 1
TROJAN
- 100
- - REASON OR COMMENT HAS CHANGED IN PAST 24 HOURS e - r'EACTOR SCRAM WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 6 A.
M.
AND 8 A.
M.
EACH DAY EXCEPT HOLIDAYS AND WEEKENDS e