ML20148N191
| ML20148N191 | |
| Person / Time | |
|---|---|
| Site: | 07002623 |
| Issue date: | 10/18/1978 |
| From: | Ketchen E, Porter W CAROLINA ENVIRONMENTAL STUDY GROUP, DUKE POWER CO., NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | |
| Shared Package | |
| ML20148N169 | List: |
| References | |
| NUDOCS 7811270032 | |
| Download: ML20148N191 (4) | |
Text
' ~
- ;.., ' m -
, 3._
~~
W,,*. h i + '..
' NI+44-MhnM U
.t T 7 7,
5.. -
n q,, n
'. p,.
'-i
(,k~ 9 jc, ' h i
UNITED STATES OF AMERICA-73 NUCLEAR REGULATORY COMMISSION-
%tr
' f.;*p BEFORE'THE ATOMIC SAFETY AND LICENSING BOARD y
yI*
1
' In the Matter of'
)
)
DUKE POWER' COMPANY
)
)
(Amendment 'to Materials License.
),
Docket'No. 70-2623 SNM-1773 for Oconee Nuclear.
)
Station. Spent Fue1 Transportation
)~
-and Storageat McGuire. Nuclear
)
~
Station)
)
STIPULATION OF THE CAROLINA ENVIRONMENTAL STUDY GROUP, THE NUCLEAR REGULATORY -
COMMISSION STAFF ~AND-DUKE POWER COMPANY-
)
RELATING TO THE ADMISSION OF CONTENTIONS 4
The Carolina Environmental Study Group ("CESG"), Duke Power Company (" Licensee"), and the Nuclear Regulatory Commission Staff ("NRC Staff"), subject to the approval of the Atomic Safety and ' Licensing Board (" Licensing Board") duly appointed in the captioned matter, stipulate to the contentions-contained in
'this; document, except where expressly.-limited or objected to 1,/ '
t
.by the signatories of this document.
An appropriate notation -
is made where -there is an-express objection to a part or parts of'the stipulation.
Any contention or contentions which may
'have been. asserted by CESG and which do not appear in.this if This stipulation pertains. solely to an agreement reached with i
respect to-co'ntentions.
By entering this. stipulation, neither' i
the NRC Staff nor' the Licensee admit that CESG. presently has
'l
~
standing.as:an Intervenor in this matter.
!7811270o10l
,,y
.,. +,
- .2..
s
7.(,
L stipulation are to be considered abandoned and withdrawn _by CESG.. Substantive and procedural rights shall be governed
'by.the rules and regulations of the Nuclear Regulatory Com-
~
mission.
By entering into this agreement, the NRC Staff does
. not agree that there is merit.to any of the agreed contentions.
Similarly, Licensee does not agree that there is merit to any of the agreed contentions and is entering into the stipulation solely for the purpose of expediting ' these pro'ceedings.
Stipulated Contentions CESG Contention'No. 1 CESG contends that shipment of Oconee spent fuel to McGuire for s'torage is unacceptable'as compared to'other alternatives (a)
Modification of the existing Oconee spent fuel pools
~
to provide additional storage capacity; i
.(b)
Construction of a new and separate spent fuel storage facility at'the Oconee siter
- 1 (c)
Construction of a new and separate spent fuel storage facility away from the Oconee site, but other than McGuire.
CESG Contention No. 2 CESG contends that transportation of spent nuclear fuel from-the Oconee Nuclear' Station for storage at the McGuire Nuclear 0
2 N '-
Station will create an unacceptable hazard by significantly increasing the radiation doses to persons in the region near the proposed transportation routes between the two facilities.
Specifically:
(a)
There will be an unacceptable incremental burden of radiation dose to persons living in the vicinity of the' transportation routes.
(b)
There will be an unacceptable incremental burden of radiation dose to persons traveling over the trans-portation routes concurrently with spent fuel ship-ment.
(c)
There is likely.to be an unacceptable incremental
~
burden of radiation dose to persons in the vicinity 2/
due to an accident or delay in transit.
CESG Contention No. 3 CESG contends that factors set forth in items 1 and 2 above require the preparation of an Environmental Impact Statement because the proposed action is a major federal action of the Commission significantly affecting the quality of the 2/
CESG intends to raise the likelihood of a melting or breach of cask accident.
Licensee and Staff do not stipulate to this aspect of the contention.
~4-human environment.
- Dated October 18, 1978 e
r'/
~
Y.2 b.,
U /a -
Carolina Enviidnmental Study Group
/
-t u 1 M Mar..
Nuclear Regulatory Commission Staff l(
Duke Power Company 9
4 4
e d
i
~