ML20148N186

From kanterella
Jump to navigation Jump to search
Forwards Final Rept, Integrated Matls Performance Evaluation Program Review of Colorado Agreement State Program, 970310-14
ML20148N186
Person / Time
Issue date: 06/16/1997
From: Thompson H
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Shwayder P
COLORADO, STATE OF
Shared Package
ML20148N193 List:
References
NUDOCS 9706260262
Download: ML20148N186 (3)


Text

O l

Ms. Patti Shwaydsr, Executive Director June 16, 1997 jo Colorado Department of Public Health l'

and Environrnent l;

8100 Lowry Boulevard t

Denver, CO 80222-6928

Dear Ms. Shwayder:

On June 3,1997, the Management Review Board (MRB) met to consider the proposed final l

Integrated Materials Performance Evaluation Program (IMPEP) report on the Colorado l

Agreement State Program. The MRB found the Colorado program adequate to protect public health and safety and compatible with NRC's program.

Section 5, page 26, of the enclosed final report presents the IMPEP team's recommendations. Note that there is one additional recommendation that was made by the MRB. The Colorado equivalent rule to NRC's 10 CFR 34.25, " Leak Testing, Repair, Tagging, Opening, Modification, and Replacement of Sealed Sources," does not contain the provision that sealed sources not fastened to, or contained in, a radiographic exposure device shall be permanently tagged. For purposes of compatibility, the MRB recommended this requirement be implemented through some form of legally binding requirement, such as a license condition, until the final regulation is promulgated. During the MRB meeting, l

Mr. Quillin committed to implement this recommendation. We request your evaluation and response to those recommendations within 30 days from receipt of this letter.

Based on the results of the current IMPEP review, the next review will be scheduled in four years, unless program concerns develop that require an earlier evaluation.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. I look forward to our agencies I

continuing to work cooperatively in the future.

Sincerely, Origind Signed by Hugh L. T5rkson'/l '."' h-Jr Deputy Executive Director for Regulatory Programs

[i (

Enclosure:

As stated ifC cc:

Lee Thielen, Associate Director bec:

Chairman Jackson hl';

Colorado Department of Public Health Commissioner Rogers 3

and Environment Commissioner Dicus IN Robert Quillin, Director, Commissioner Diaz g

C Laboratory and Radiation Services Divisior.

Commissioner McGaffigan Lb' Howard Roitman, Director,

)

E Hazardous Materials and Waste Management Division fan Distribution:

Q,i DIR RF

DCD (SPO1) gg SDroggitis CMaupin TCabs,OCA JCR (YES v' NO

)

  • g KSchneider LRakovan FCameron, OGC RRatliff, TX HNewsome, OGC SMoore, NMSS DBunn, CA KCyr, OGC Q7 n,,,,CHackney, RIV JHornor, RIV/WCFO JCook, RIV FCongel, AEOD CDCool, NMSS GDeegan, NMSS Colorado File CPaperiello, MISS i

/See Previous Concurrence. j f

! DOCUMENT NAME: G:\\KXS\\97FINLTR.CO G:\\KXS\\COIMP97. FIN, G:\\KXS\\COAPX97. FIN To ricilre a copy of this docurnent, indicate in the box'1j *c'/= Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N* = No copy OFFICE Region IV E

OSP;pD OSP:D EDq J l

l NAME JHornor:nb PHLohaus RLBangart HLTtyc4fiHbn DATE 06/09/97

  • 06/ll/97 06/11/97*

O@Q/97 l

~

9706260262 970616 OSP FILE CODE: SP-AG-5 PDR STPRG ESGCO PDR

Ms. Patti Shwayd:r, Executive Director Colorado Department of Public Health

)

and Environment 8100 Lowry Boulevard Denver, CO 80222-69:!8

Dear Ms. Shwayder:

On June 3,1997, the Management Review Board (MRB) met to consider the proposed final Integrated Materials Performance Evaluation Program (IMPEP) report on th,e Colorado Agreement State Program. The MRB found the Colorado program adequate to protect public health and safety and compatible with NRC's program.

/

/

Section 5, page 26, of the enclosed final report presents the IMP,EP team's recommendations. Note that there is one additional recommendation that was identified at the MRB to implement the requirements of " Leak Testing, Repair, Tagging, Opening, Modification, and Replacement of Sealed Sources" regulation through legal binding requirements on a case-by-case basis until the final regulation is promulgated. Mr. Quillin committed to implement this recommendation during the' MRB, as necessary. We request your evaluation and response to those recommendatio'ns within 30 days from receipt of this letter.

/

/

Based on the results of the current IMPEP reviev0, the next review will be scheduled in four years, unless program concerns develop that,rsquire an earlier evaluation.

)

I appreciate the cot.rtesy and cooperation $xtended to the IMPEP team during the review and your support of the Radiation Controf Program. I look forward to our agencies continuing to work cooperatively in tl)e' future.

Sincerely,

/

/

Hugh L. Thompson, Jr.

/

Deputy Executive Director

/

for Regulatory Programs

Enclosure:

As stated

/

cc:

Lee Thie en, Associate Director Colorato Department of Public Health and Envir6nment Robert Quillin, Director, Labor'atory and Radiation Services Division Howdd Roitman, Director, 1)dzardous Materials aM Waste Management Division Distribution:

DCD (SP01)

DIR RFj'is PDR (YES V' NO

)

SDroggit CMaupin KS hneider LRakovan FCameron, OGC H

wsome, OGC SMoore, NMSS DBunn, CA ackney, RIV JHornor, RIV/WCFO JCook, RIV DCool, NMSS GDeegan, NMSS Colorado File DOCUMENT NAME: G:\\KXS\\97FINLTR.CO G:\\KXS\\COlMP97. FIN, G:\\KXS\\COAPX97. FIN To r2ceive a copy of this document, indicate in the box:

"C" = Copy without attachment / enclosure

  • E* = Copy with attachment /enclosuree
  • N* = No coov g,egi,on IV lE OSP:DD OSPjC) 4,l EDO l

[_

OFFICE R

NAME WJHornor:nb PHLohaus RLBangFJ(140 HLThompson DATE 06/4/97 06/ /97 06(//97 05/ /97 OSP FILE CODE: SP-AG-5 6

1 pa caor,q o

p b

UNITED STATES

!.. )fif,,j NUCLEAR REGULATORY COMMISSION g

WAsHINOToN. D.C. 2055'H)001 June 16, 1997 Ms. Patti Shwayder, Executive Director Colorado Department of Public Health and Environment 8100 Lowry Boulevard Denver, CO 80222-6928

Dear Ms. Shwayder:

On June 3,1997, the Management Review Board (MRB) met to consider the proposed final Integrated Materials Performance Evaluation Program (IMPEP) report on the Colorado Agreement State Program The MRB found the Colorado program adequate to pro'ect public health and safety and compatible with NRC's program.

Section 5, page 26, of the enclosed final report presents the IMPEP team's recommendations. Note that there is one additional recommendation that was made by the MRB. The Colorado equivalent rule to NRC's 10 CFR 34.25, " Leak Testing, Repair, Tagging, Opening, Modification, and Replacement of Sealed Sources," does not contain the provision that sealed sources not fastened to, or contained in, a radiographic exposure device shall be permanently tagged. For purposes of compatibility, the MRB recommended this requirement be implemented through some form of legally binding requirement, such as a license condition, until the final regulation is promulgated. During the MRB meeting, Mr. Ouillin committed to implement this recommendation. We request your' evaluation and response to those recommendations within 30 days from receipt of this letter.

Based on the results of the current IMPEP review, the next review will be scheduled in four years, unless program concerns develop that require an earlier evaluation.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. Ilook forward to our agencies continuing to work cooperatively in the future.

Sincerely, etyff Hu 'h L. Thompson, A.

Deputy Executive Direct for Regulatory Programs Enciosure:

As stated cc:

Lee Thielen, Associate Director Colorado Department of Public Health and Environment Robert Quillin, Director, Laboratory and Radiation Services. Division Howard Roitman, Director, Hazardous Me.terials and Waste Management Division