ML20148N006
| ML20148N006 | |
| Person / Time | |
|---|---|
| Issue date: | 12/12/1980 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Ahearne J, Gilinsky V, Hendrie J NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8012290043 | |
| Download: ML20148N006 (4) | |
Text
.
h NNe TRA U.
s' g
UNITED STATES
+
[
j p, NUCLEAR REGULATORY COMMISSION i
.c,
- r. + &
p wwecrow, p. c. roses -
l t
%, *.... /c December 12, 1980 MEMORANDUMFORi Chairman Ahearne
!=.'.
Comissioner Gilinsky Ej e,
Comissioner Hendrie b
8
&[?sg Commissioner Bradford E
g ".
W William J. Dircks, Executive. Director for OperaQjst 3
gi FROM:
m
SUBJECT:
DAILY STAFF NOTES, DECEMBER ll,1980 ro
'E E
g 5
IE, 1.
Indian Point Unit 2 (Con. Ed.) - Proposed Imposition of Civil Penalties -
$210.000. (EN.80-54).
t 2.
Pharmatopes, Inc.. Oak Park. Mich., - Proposed Imposition of Civil Penalties - $7.550, (EN-80-55).
l 3.
Teledyna Ohiocast, Springfield, Oh., - Apparent Overexposure of a I
Radiographer, (PNO-:II-80-228).
t RES ef
- s*-
y The LOFT small break. pumps.on test, L3-6, was run at 6:10 P.M. MST 12/10/80.
In the test the primary coolant sums wem left running following the simulated tvptum of a large NR 4 inch line connected to the primary coolant loop.. About 41 minutes into the test the pumps h
were shut off and the water remaining in the system measured.
During the period when the ptaips were coast 1ng dcwn, the coolant which was i
in the gore region dropped to the lower plenum completely voiding the reactor.com.
The fuel c.ladding temerature was allowed to rise to 600'F
'l before the ECC eccumulator was opened to mfill the reactor core.
s Refill was acco@lished rapidly with no damage to the fuel.
The pretest prediction of the test perforsnad with the RELAPS i:oguter code did not predict the break flow well or the dropping of the water.
out of the core.
Post-test analysis of the data is underway to determine where and why discrepancies occurred.
The test wci a required calculation for the PWR fuel vendors.
The LOFT Special Review Group and consultants were pmsent at the test.
U THis DOCUMENT CONTAINS POOR QUAUTY PAGES 601gugo
-.-.-. O '.'t 3- -.
~
1 l
~
The Comissioners December 12,1980 l
1 NRR
_Haddam Neck and Millstone 1 and 2 Plants
')
Connecticut Yankee Atomic Power Company and Northeast Nuclear Energy Company by letter dated December 4, 1980, requested a hearing in regard a
to our October 24, 1980 Equipment Qualification Order. The hearing request j
is addressed io the issue of whether all safety-related electrical equip-ment should be environmentally qualified in accordance with.the DOR.
l.
Guidelines or NUREG-0588 by June 30, 1982.
I CYAPCO and NNECO state that this request for a hearing will provide ample
]
opportunity to clarify.the requirements of the Orders and review the safety q
evaluation reports scheduled for issuance on February 1,1980.
i
?
l l
i l
l 1
1 l
1
REGION I PLANT STATUS-12/11/80 PLANT NAME PLANT STATUS-REASON OR COMMENT RESTART
_______________________% POWER __DOWN..__________________________________DATE__
-BEAVER VALLEY 1 91 1
ASCENDING AT 1%/HR
'l CALVERT CLIFFS 1 1
I X
REFUELING 1 12/15 CALVERT CLIFFS 2 1
72 i
COASTING DOWN I
FITZPATRICK l
99 1
1 GINNA i 100 1
1
^
l HADDAM NECK.
I 100 1
i i
INDIAN POINT'2 1
1 X
l REFUELING AND REPAIR FAN 1
6/81 I
I I
COOLERS i
INDIAN POINT 3 I
I X
l MAINTENANCE ON RCP 1
MAINE YANKEE I
l X
1 REPLACE 2 RCP SEALS I
MILLSTONE 1 I
l X
l REFUELING l
1/15 MILLSTONE 2 1 100 I
i NINE MILE POINT 1 I
92 I
I COAST DOWN I
' OYSTER CREEK
.I 97 i
t i
PEACH BOTTOM 2 1 100 1
1 1
PEACH BOTTOM 3 1 100 1
1 I
PILGRIM 1 1 100 1
1 i
SALEM 1 1
X l CH'ARGING PUMP.AND TESTING i 12/13 SALEM 2 1
1 X
l AWAITING LICENSE I
THREE MILE ISLAND 1 1
I
.X
.I NRC ORDER i
THREE MILE ISLAND 2 I
I X
l NRC ORDER I
VERMONT YANKEE 1
1 X
l REFUELING I 12/22 YANKEE ROWE I 100 l
i I
REGION II PLANT STATUS-12/11/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART.
________________________% POWER __DOWN____________________________________DATE__
BROWNS FERRY 1 1
99 I
I I
BROWNS FERRY 2 1
99
-I I
BROWNS FERRY 3 I
i X
l REFUELING 1/9 BRUNSWICK 1 4-96 I
l i
BRUNSWICK 2 I
I X
l FW HEATER OUTAGE /WILL GO TO I
I I
i POWER TODAY I
CRYSTAL RIVER 3 1
75 I
I CLEAN CONDENSOR WATER BOX FARLEY 1 1
1 X
l REFUELING 1
3/1 HATCH 1 1
80 1
1 LIMIT I
HATCH 2 I
I X
l REFUELING I
2/1 NORTH ANNA 1 1
69 l
l COAST DOWN I
NORTH ANNA 2 l
t X
1 MODE 2 1 12/12 OCONEE 1 1 100 1
OCONEE 2 1 100 1
1 1
OCONEE 3 1
1 X
l' REFUELING 1
ROPINSON 2 1
X
! HEATING UP/ON LINE 2300 l 12/11 SEOUOYAH 1 l
X l COLD SHUTDOWN - MAINTENANCE I 12/13 ST. LUCIE 1 1 100 I
I I
SURRY 1 1
I X
l S.
G.
REPLACEMENT I
8/61 SURRY 2 1 100 I
I I
TURKEY POINT 3 1
78 I
I VACUUM LEAK IN CONDENSER /WILL i
i 1
BE BACK UP TODAY I
TURMEY POINT 4 1
X
! REFUELING
- l. 1/15
.T
~
~
REGION III PLANT STATUS-12/11/80
_____. _______________..___________________________+ __ ____
PLANT NAME PLANT STATUS ~
REASON OR COMMENT RESTART
.._____________________ _% POWER __OOWN __________ ________________________DATE__
BIG ROCK POINT-I X
.I REFUELING-1 1/7 COOK 1
~!
100 1
I I
COOK 2 1
65 I BUILDING TO FULL POWER AT 1800 I'12/11
-DAVIS-BESSE 1 1
55 i
'l RC' PUMP SEAL AND.FW PUMP DOWN i
.DRESDEN 1 1
l X
1 CHEMICAL CLEANING I INDEF DRESDEN 2 1
47 I COASTDOWN I
DRESDEN 3 ~ '
I 96 I
I 1
4 DUANE ARNOLD 1 100 1
I i
KEW4UNEE I 100 t
i I
LACROSSE 1
1 X
REFUELING i
1/31 LASALLE I
I X
l AWAITING LICENSE I
MONTICELLO 1 100 1
I i
- PALZSADLS I
4 l
1 HOLDING FOR TURBINE BALANCING l 12/25' POINT BEACH 1
'l I
X l REFUELING I 12/25 POINT BEACH 2 1 100 1
1 1
PRAZRIE ISLAND,1 1 100 1
I i
PRAIRIE ISLAND 2 1 100 t
I OUAD CITIES 1 i
i X
l REFUELINO i 12/21 QUAD CITIES 2 I
99 i
I oZION 1
'l 50 1
I COMING UP WITH XENON LIMITING 1 12/12 ZION 2 i
94 I
I I
REGION IV PLANT STATUS-12/11/80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART
________________________% POWER __DOWN____________________________________DATE__
ARKANSAS 1 1
71 1
1 3 PUMPS LIMIT 1 LEAKING PUMP ARKANSAS 2 I
l X
1 COLD SHUTDOWN i 12/13 COOPER I
-98 I
I I
FORT CALHOUN i
75 1
i ADMINISTRATIVE CONTROL (FUEL I
i I
l CONSERVATION) i FORT ST. VRAIN 1
68 I
! 70% LICENSE LIMIT 1
REGION V PLANT STATUS-12/11I'80 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ % P O W E R _ _ DO W N.. _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ __ _ _ _ D AT E _ _
DIABLO CANYON I
I X
l AWAITING. LICENSE i
RANCHO SECO I 100 1
I SAN ONOFRE I
1 X
l STEAM GENERATOR TUBE REPAIR I
4/16 TROJAN I 100 1
1 I
o - REASON OR COMMENT HAS CHANCED IN PAST 24 HOURS tt - REACTOR SCRAM WITHIN PAST 24 HOURS NOTE - REACTOR STATUS DATA COLLECTED BETWEEN 6 A.
M.
AND 8 A.
M.
EACH DAY EXCEPT HOLIDAYS AND WEEKENDS j
l
-