ML20148M410

From kanterella
Jump to navigation Jump to search
Forwards ASP Rev 5 & Sper for Subj Facil in Rough Draft Form.Encl to Be Withheld from Pub Disclosure Pursuant to 10CFR2.790
ML20148M410
Person / Time
Site: Zimmer
Issue date: 11/01/1978
From: Rose D
LOS ALAMOS NATIONAL LABORATORY
To: Clark R
Office of Nuclear Reactor Regulation
References
WX-8-2552, NUDOCS 7811220012
Download: ML20148M410 (2)


Text

SECURITY PLAN DisT:tiBL t Aw*

n em a -

-v

' - ~

U.S. NUCLEAR EEGULATOr.Y COMMISSIEN OOCKET NUMBE R RC rotu 195 50-358 t-7si,.-

NRC' DISTRIBUTION roa PART 50 DOCKET MATERIAL FROM:

DArtofCoCUMENT

'O.

University of California 11/01/78 Mr. Robert A. Clark Los Alamos, New Mexico 77 545

11/,02/78

,, ~, c,, y,,

Donald'G. Rose ILETTE R O NOTORIZE D PROP INFUT PORM NUMBER OF COPtES RECEIVED iNAL QUNCMPlED XXXXXXXX 1 Copy en y ENCLOSU RE escr.lPTION Consists of the ASP Revision LTR PURSU ANT TO PART 73.55...

Five and the SPER (Security Plan) for the REQUESTING WITHHOLDING OF INFO FROM Zimmer Nuclear Plant...

PUBLIC DISCLOSURE...TRANS THE FOLLOWING PROPRIETARY INFO...

NGTE: 4 Copies Reproduced on 11/02/78 per PLANT NAME: ZIMMER Project Manager (Mr. Peltier)

  • DENOTES WITHOUT PROPRIETARY LNFO 7 8112 20ott.

( DISTRIBUTION PER BILL ROSS )

ki l

FOR ACTION /INFORMATION

~

LWR $1 BC X, BRANCH CHIEF

  • PELTIER N-. PROJECT MANAGER
  • LWRF1 LA Y

LICENSING ASSISTANT

  • lNTERNAL DISTRIBUT10N Y

9ec FTT79

"'Y di X

o 1_ c'tARK - CY'S.4 2 -5 TL 'r9c on9'*3 M

y_

a tte#Apon g f7 mJf v DPNI M AW971f.

  • N j

I N

ronp.

  • BATAVIA, OH i

)(

1mg.. CAT:B i

l i

I I

I i

i i

I i

fi i l

EXTERNAL DISTRIBUTICN CONTROL NUMBER i

I l

I i

l t

I i

i i

I l

l

'l li i

i i

i

.,[

I' Universityof California LOS ALAMOS SCIENTIFIC LABORATORY Post Of fice Box 1663 Los Alamos. New Mexico 87545 in repiy

.er to:

WX-8-2552 November 1,1978 Mail stop:

928 Mr. Robert A. Clark Reactor Safeguards Licensing Branch Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Attention:

Mr. J. W. Roe

Dear Mr. Clark:

Attached are the ASP Revision Five and the SPER for the Zimmer Nuclear Plant, Docket Number 50-358.

These are rough draft working papers and are meant solely for the use of the NRC team leader, J. W. Roe, in preparing a final SPER.

They should be withheld from public disclosure as Section 2.790 information.

Any questions regarding these documents may be referred to Mr. P. M. Giles, Phone 843-3083.

S1pcerely-yo/

n

urs, a h.'d l Donald G. Rose DGR:ymg Enc:

Zimmer ASP Revision Five Zimmer SPER Oys:

w/o enc:

M. L. Brooks /L. W. Hantel, WX-00, MS 686 R. N. Thorn, ADW, MS 100 A. D. McGuire, SP0, MS 120 W. A. Bradley, WX-8, MS 928 H. A. Lindberg, WX-8, MS 928 W. G. Davey, Q-00, MS 561 150-5, MS 150 (2)

File u.n, -..a.o~ ~ o, -,, e,.,

p-DOCKET NO. 50-358

(

DATE:

11/02/78 1

9 NOTE TO NRC AND/OR LOCAL PUBLIC DOCUMENT ROOMS i

November 1, 1978 The following item submitted with letter dated from University of California is being withheld from public disclosure in accordance with Section 2.790.

PROPRIETARY INFORMATION l

Consists of the ASP Revision Five and the SPER (Security Plan) for the Zimmer Nuclear Plant...

(

Room 042 James C. McKnight Distribution Se:"/ ice's 3 ranch

-