ML20148J800

From kanterella
Jump to navigation Jump to search
Forwards Rev 4 to Security Training & Qualification Plan, Incorporating Clarification Re Psychological Evaluations & Minor Editorial Changes.Rev Withheld (Ref 10CFR73.21)
ML20148J800
Person / Time
Site: Vogtle  
Issue date: 01/15/1988
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-3977, NUDOCS 8801270488
Download: ML20148J800 (2)


Text

Georgia Power Company 333 P,edmont Avanve Abanta, Georg;a 30308 Telephone 404 526-6526 Mad.ng Address:

Fbst Off:ce Box 4545 Atlanta, Georg a 30302 Georgia Power L T. ouew=

{

_ SAFEGUARD $ INFORMADON

)

a d NcensIng'

( ENCLOSURE CONTAINSSAFEGUARDSINRWtMATION )

I. _ UPON SEPARATION THIS PAGE IS DECONTROLLED)

SL-3977 0726m X7GJ17-V770 January 15, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 PLANT V0GTLE - UNITS 1, 2 NRC DOCKETS 50-424, 50-425 OPERATING LICENSE NPF-68, CONSTRUCTION PERMIT CPPR-109 SECURITY TRAINING AND OUALIFICATION PLAN REVISIQ{

Gentlemen:

In accordance with 10 CFR 50.54(p), Georgia Power Company hereby submits three copies of Revision 4 to the Vogtle Electric Generating Plant Unit 1 and Unit 2 Nuclear Security Training and Qualification Plan.

By copy of this letter, two copies are being provided to the NRC Region II office.

Revision 4 incorporates a clarification concerning psychological evaluations and minor editorial changes.

Enclosure 1

provides a

description and justification of the changes. provides instructions for incorporation of the changes.

The revised training and qualification plan pages follow Enclosure 2.

Since public disclosure of security information may jeopardize the safety of the facility, we request that the enclosures to this letter be maintained as proprietary and withheld from public disclosure in accordance with 10 CFR 73.21.

Please contact this office if ycu have any questions.

Sincerely, Nhhhh

$$[2Jgyg$$

g4 p

L. T. Gucwa JH/lm

Enclosures:

/

1.

Description and Justification of Changes

/

2.

Instructions for Incorporation of the Changes

[\\

l h 3,

Revised Training and Qualification Plan Pages c:

(see next page)

I SAFEGUARDS INFORMATION

)

( ENCLOSURE CONTAINS SAFEGUARDS INFORilATION )

(

UPON SEPARATION THIS PAGE IS DECONTR1LLED

)

('

lARGMAD$1160lMfoll.

)

( ENCLOSURE MTAINS SAFEGUARDS WE 'NWm0N )

Georgia Power

(

UPON SEPARATION THIS PAGE IS DECONTROLLED

)

U. S. Nuclear Regulatory Commission January 15, 1988 Page Two c: Eq.oraia Power Comp 3ny i

Hr. J. P. O'Reilly w/o enclosure Hr. P. D. Rice w/o Mr. G. Bockhold, Jr. w/

Hr. J. H. Lukehart w/

l Mr. F. R. Timmons w/

Hr. J. E. Swartzwelder w/

GO-NORMS w/o Southern Comoany Seryltgi Hr. R. A. Thomas w/o Mr. J. A. Bailey w/o Shaw. Pittman. Potts & Trowbridge Hr. B. H. Churchill, Attorney-at-Law w/o Troutman. Sanders. Lockerman & Ashmore Mr. A. H. Domby, Attorney-at-Law w/o U. S. Nuclear Regulgiory Commis11on Dr. J. N. Grace, Regional Administrator w 2 copies encl.

Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies w/o encl.)

Mr. J. F. Rogge, Senior Resident Inspector-0perations, Vogtle w/o

(

SAFEGUARDS N0lME10ll I

( ENCLOSURECONTAINSSARMAESM I

(

UPON SEPARATION THS PAGE 5 GRONIllR&B 1

0726m F00775