ML20148J586

From kanterella
Jump to navigation Jump to search
Forwards LER 97-002-00.Commitment Made:Evaluation Will Be Performed to Review Preventive Maint Frequency for MSSV & Psv Disassembly,Insp & Retesting
Date released: 06/10/2020 Download: ML20148J586


:on 970515,set Pressure for One MSSV Was Found Outside Setpoint Tolerance Due to Setpoint Variance.Mssv That Failed Was Disassembled,Inspected,Repaired,Reassembled & Tested Satisfactorily
ML20148J599
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/12/1997
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML20148J599 (5)
Forwards LER 97-002-00.Commitment Made:Evaluation Will Be Performed to Review Preventive Maint Frequency for MSSV & Psv Disassembly,Insp & Retesting
ML20148J582
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/12/1997
From: Matthews W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20148J582 (1)