ML20148J209
| ML20148J209 | |
| Person / Time | |
|---|---|
| Issue date: | 11/07/1978 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Hansell D ILLINOIS, STATE OF |
| Shared Package | |
| ML20148J214 | List: |
| References | |
| FOIA-78-289 NUDOCS 7811150203 | |
| Download: ML20148J209 (3) | |
Text
.
I.,
4
+\\
UNITED STATES yo NUCLEAR REGULATORY COMMISSION I
o WASHINGTON, D. C. 20555 5
E
%g
/
N6vember 7,1978 Dean Hansell, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street Suite 2315 IN RESPONSE REFER Chicago, IL 60601 TO F01A-78-289
Dear Mr. Hansell:
This is in response to your letter dated October P0,1978 in which you requested, pursuant to the Freedom of Information Act, a copy of all records relating to the boiling of liquid in spent nuclear fuel pools or in nuclear waste tanks.
Your request was received by the Office of Administration on October 24, 1978.
1 in response to your request, a copy of the documents listed in Appendix A are enclosed.
In addition, three additional documents, subje.t to your request, were originated by the Department of Energy and are being referred to that agency for appropriate disposition and direct response to you.
Sincerely, C
.hd J. M. Felton, Director Division of Rules & Records Office of Administration
Enclosures:
As stated 7811156*zby l
l
F01A-78-289 APPENDIX A 1.
12/5/77 Sandia letter from A. S. Benjamin to D. J. McCloskey.
Spent Fuel Heatup Calculations 2.
2/15/78 Note from B. Grimcs to R. Baer EEB Fai ~ ::d Fuel Fraction Est. for Calvert Cliffs Reload SER w/ enclosure 3.
1 / 31 / 77 Memo from D. Bunch to V. Benaroya Spent Fuel Pool Boiling w/ enclosure 4.
6/26/75 Note from H. R. Denton to G. A. Arlotto comments on R. G. 3.24.
5.
6/11/75 Letter from Bechtel Power Corporation Morowski to R. L. Tedesco w/ attachments 6.
5/05/75 Note from B. K. Grimes to C. Long Re-vised Comments on Bechtel Proposal for Spent Fuel Pool Boiling w/ enclosures 7.
3/18/75 Note from B. K. Grimes to C. Long Com-ments on Bechtel Proposed for Spent Fuel Pool Boiling w/ enclosure 8.
3/19/75 Note from C. Long to R. Tedesco Review of Bechtel Power Corp Ltr dtd 1/3/75 Requesting Reconsideration of the Quality and 9.
5/15/75 Note from H. R. Denton to G. A. Arlotto R.G. 3.24
- 10. 12/21/76 mo from L. S. Tong to R. H. Vollmer ission Product Release Date w/ enclosure 11.
6/26/75 Note from H. R. Denton to G. A. Arlotto R.G. 3.24 12.
5/23/77 Memc from D. F. Bunch to B. Grimes Spent Fuel Pool Boiling w/ enclosure 13.
8/25/77 Memo from D. G. Eisenhut to R. M. Bernero Reg. Guide Tech. Rev. Request 14.
10/4/78 Memo from D. G. Eisenhut to R. M. Bernero Rev. of R,G.l.13 to Reflect Findings of NRR Generic Acturty A-28
15.
5/25/78 Memo from V. Benaroya to J. S. Bland Draft SRP 9.1.3 Rev.
16.
6/07/78 Memo from D. G. Eisenhut to NRR Div.
(
Dirs. Proposed Interim SRP Rev - Secs.
9.1.2 and 9.1.3 w/ modified review pro-cedures 17.
9/21/78 Memo from D. G. Eisenhut to R. J. Mattson Interim SRP Rev - Secs. 9.1.2 and 9.1.3 w/ memo dated 6/27/78 from R. J. Mattson to D. G. Eisenhut and item 16.
18.
April 1976 Alternative Process for Managing Existing Comnercial High-Level Radioactive Wastes (NUREG 0043)-
A
,_ - - - _ - - - _ _ _ _ _... _