ML20148H874
| ML20148H874 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/06/1997 |
| From: | Passwater A UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20148H877 | List: |
| References | |
| ULNRC-3593, NUDOCS 9706130032 | |
| Download: ML20148H874 (3) | |
Text
-
,,. ~. - -..... -
1901 Chouteau Avenue Pos: 0!! ice Box 149
~'
St. Louis. Missoun 6316G q
314 621-3222 Umav Etecriac June 6,1997 i
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, DC 20555 Gentlemen:
ULNRC-3593 i
DOCKET NUMBER 50 453 CALLAWAY PLANT NPDES PERMIT REVISIDN Please find enclosed the new NPDES Discharge Permit for the Callaway Plant. This permit includes the new sewage treatment lagoon system. The permit became effective on May 9,1997.
This Permit modification is submitted in accordance with Callaway Plant Operating License NPF-30, Appendix B, Section 3.2.
Sincerely,
)
i Alan C. Passwater Manager, Licensing and Fuels BFH/plr 3
Attachment
'I
/
11111111llIl11111111111llilllll1 9706130032 970606 PDR ADOCK 05000483 P
pg
s cc:
M. H.
Fletcher Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855-2432 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 4
Arlington, TX 76011-8064 l
Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Kristine M. Thomas (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville, MD 20852-2738 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102
I
- s UE, Callcway Power. Plant MO-0098001, Callaway Co.
STATii OF MIS $41'til DEPARTMENT OF NATURAL RESOURCES
!)l\\ isl()\\ ()l' IN\\'lle )\\ \\l!NTAI ()1 Al.lTT l'.( ) IM l-(>
lelTermo Cm. M() n;ltu-til~h May 9, 1997 Union Electric Company 1901 Chouteau St.
St. Louis, MO 63103
Dear Permittee:
Pursuant to the Federal Water Pollution Control act, under the authority granted to the state of Missouri and in compliance with the Missouri Clean Water Law, we have issued and are enclosing your State Operating Permit to Discharge from UE, Callaway Power Plant.
Please read your permit and attached Standard Conditions. They contain important information on monitoring requirements, effluent limitations, sampling frequencies and reporting requirements.
Monitoring reports required by the special conditions must be submitted on a periodic basis.
Copies of the necessary report forms are enclosed and should be mailed to the regional office listed below.
Please contact that office for additional forms.
This permit is both your Federal Discharge Permit and your new State Operating Permit and replaces all previous state operating permits for this facility.
In all future correspondence regarding this facility, please refer to your State Operating Permit number and facility name as shown on page one of the permit.
If you have any questions concerning this permit, please do not. hesitate to call this office or our Jefferson City Regional Office at 1511 Christy Dr.,
, P.O. Box 176, Jefferson City, MO 65101, (573) 751-2729.
Sincerely, WATER POLLUTION CONTROL PROGRAM
["c Daniel R.
Schuette
~
Chief of Permit S e ct.'.an
~. ~ _, _
DRS:ml Enclosure c: EPA - Billing Branch O