ML20148G681

From kanterella
Jump to navigation Jump to search
Notice of Issuance of Amend 103 to License DPR-29.Amend Revises Tech Specs to Incorporate New Cycle 10 Reload Fuel Operating Limits,To Expand Operating Domains & to Change Jet Pump Surveillance Core Flow Evaluation
ML20148G681
Person / Time
Site: Quad Cities 
Issue date: 01/22/1988
From: Muller D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20148G686 List:
References
NUDOCS 8801270003
Download: ML20148G681 (4)


Text

'

SO Cro

/

o UNITED STATES

~g

. ! )

g NUCLEAR REGULATORY COMMISSION r E WASHINGTON, D. C. 20555

%J

...e 7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION COMMONWEALTH EDISON COMPANY DOCKET N0. 50-254 l

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE i

The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 103 to Facility Operating License No. DPR-29 issued to CommonwealthEdisonCompany,(thelicensee),foroperationofQuadCities, Unit 1, located in Rock Island County, Illinois.

In general, the license amendment deletes certain license conditions and revises Technical Specifications (TS) to incorporate new Cycle 10 reload fuel operating limits, expands operating domains (including operation with equipment out of service), and changes jet pump surveillance core flow evaluation methodology.

More specifically TS for the following are revised for Cycle 10 to reflect new reload fuel operating limits and analyses: (a)LinearHeat Generation Rate (LHGR), (b) Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)limitcurves,(c)RodBlockMonitor(RBM)setpoint,and(d) Minimum Critical Power Ratio (MCPR) limit and associated 20% insertion scram time value. Other TS and license condition changes in this amendment that resulted from analyses performed by General Electric for the licensee to expand the unit operating region and allow for operation with certain equipment out-of-service j

include the following: (e) requirements for Single Loop Operation (SLO) deleted fromexistingLicenseConditionandincorporatedintoTS,(f)expandedoperating t

region analyzed for increased core flow (ICF) and feedwater temperature h!

Abb 4

P i

-' ' ' ~ ~ - ~ - ' - - ~ - " - ~

e 1

7590-01 reduction (FTR), (g) revised Automatic Pressure Relief Subsystem TS to require action only when two or more relief valves are inoperable, and (h) deleted license condition operating restrictions for coastdown.

Concurrent with the aforementioned TS changes, several administrative and editorial revisions are made for continuity.

Furthermore, applicable TS bases and references are updated to reflect new information, fuel type, analyses, computer models, operating domains, and Limiting Conditions of Operation.

The application for the amendment complies with the standards and i

requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Opportunity for Prior Hearing in connection with this action was published in the FEDERAL REGISTER on November 5, 1987 (52 FR 42485).

No request for a hearing or petition for leave to intervene was filed following this notice.

The Commission has prepared an Environmental Assessment and Finding of No Significant Impact reldted to this action and has concluded that an environmental impact statement is not warranted because there will be no environmental impact attributable to the action beyond that which has been predicted and described in the Commission's Final Environmental Statement for the facility dated September 1972.

7590-01

. For further details with respect to the action see (1) the application for amendment dated September 18, 1987, as supplemented October 13, 1987 and subsequently clarified November 25,1987,(2) Amendment No. 103 to License No. 29, (3) the Commission's related Safety Evaluation dated December 15, 1987, and (4) Environmental Assessment and Finding of No Significant Impact. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W.; and at the Dixon Public Library, 221

)

Hennepin Ave., Dixon, Illinois 61021. A copy of items (2) thru (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention: Director, Division of Reactor Projects.

Dated at Bethesda, Maryland this 22nd day of January 1988.

FOR THE NUCLEAR REGULATORY COMMISSION Orfginal Signed by/

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects i

DISTRIBUTION Docket File NRC & Local PDRs gII{2pg. File i

LLuther TRoss OGC-Bethesda DHagan i

ACRS(10)

GPA/PA PDIII-2 Plant File i

i PDIII-2:P1 PDIII-2:L LLuther g D W, erPDI y :PD TRoss:bf7

/ ////88

/ //r/88

/ /d /88 i

,,r DI_STRLB_UTION Docket File )

~4 CTUJca17DRs PDIII-2 Rdg. File LLuther January 22, 1988 TRoss OGC-Bethesda DOCKET NO. 50-254 and 50-265 DHagan Rules and Procedures Branch ACRS I10T, 1

MEMORANDUM FOR:

Division of Rules and Records GPA/PA Office of Administration p] ant Fj]g FROM:

Of fice of Nuclear Reactor Regulation suwEcT:

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE One signed original of the federal Regis.er Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies (

)of the Notice are enclosed for your use.

Notice of Receipt of Application for Construction Permit (s)and Operating License (s).

Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.

Notice of Consideration of issuance of Amendment to Facility Operating License.

Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s)and Notice of Opportunity for Hearing, Notice of Availability of NRC Draf t/ Final Environmental Statement.

Notice of Limited Work Authorization.

Notice of Avaltability of Safety Evaluation Report.

Notice of issuance of Construction Permit (s).

Notice of issuance of Facility Operating License (s) or Amendment (s).

Order.

Exemption Notice of Granting Exemption.

Environmental Assessment.

Notice of Preparation of Environmental Assessment.

Other:_INDIYlDUALJ10TICE i

l Office of Nuclear Reactor Regulation j

Project Directorate III-2 Division of Reactor Projects - III.

IYY Y and Special Projects a

Enclosure:

As stated

Contact:

L. Luther Phone:

or ric r >

su: Naut >

DATE>

, wac roau sie no se, wacu ouo OFFICI AL RECORD COPY l