ML20148G613

From kanterella
Jump to navigation Jump to search

Forwards Rev 27 to Fundamental Nuclear Matl Control Plan for Columbia Fuel Fabrication Facility. Changes Highlighted with And/Or Bracketed by Bold Type,To Facilitate Review.Encl Withheld,Per 10CFR2.790(d)
ML20148G613
Person / Time
Site: Westinghouse
Issue date: 05/23/1997
From: Robert Williams
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19317C334 List:
References
CON-NRC-97-022, CON-NRC-97-22 TAC-L30977, NUDOCS 9706060059
Download: ML20148G613 (1)


Text

_

fh,

&jahr e

(L y

Westinghouse Commercial Nuclear Drawer R 3om Electric Corporation Fuel Division fjpgaslgg250 L

9 NRC-97-022 May 23,1997 gl U.S. Nuclear Regulatory Commission Director, Office of Nuclear Material Safety and Safeguards ATTN: Mr. Michael F. Weber, Chief j

Licensing Branch (T8D14)

Division of Fuel Cycle Safety and Safeguards, NMSS Document Control Room J

Washington,DC 20555 Gentlemen:

SUBJECT:

CHANGES TO FUNDAMENTAL NUCLEAR MATERIAL CONTROL (FNMC)

PLAN - REVISION 27 The Westinghouse Electric Corporation hereby submits changes to the FNMC Plan for the Commercial Nuclear Fuel Division's (CNFD) Fuel Manufacturing Plant located near Columbia, South Carolina. The attachment to this letter provides explanation of the changes incorporated within the revised FNMC Plan (pages submitted as enclosures).

Westinghouse requests that the attachment and enclosures with this letter be withheld from public disclosure in accordance with provisions of 10CFR 2.790(d). If you have any questions, p! ease write to me at the above address, telephone (803) 776-2610, Extension 3393, or Fax (803) 695-3964.

Sincerely, f

WESTINGHOUSE ELECTRIC CORPORATION

]

I

\\

l Robert A. Williams Safeguards Coordinator lhflll,hlfllffll(hll Attachment The Ht'stihabouse Commercib/NuclearFuelDidion - Winnerofthe 1988Malco/mBaWrigeNabonalQualityAward 9706060059 970523 l

PDR ADOCK 07001151 l

C PDR