ML20148G523
| ML20148G523 | |
| Person / Time | |
|---|---|
| Issue date: | 10/10/1978 |
| From: | Lawroski S Advisory Committee on Reactor Safeguards |
| To: | Gossick L NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| ACRS-0814, ACRS-814, NUDOCS 7811130101 | |
| Download: ML20148G523 (1) | |
Text
-__ ___________ _ _ _ _ _ _ _ - _
g "(00g p.-
...g UNITED STATES C/2$/[ _gyj j i g
NUCLEAR REGULATORY COMMISSION
- d., j yj ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 8
WASHINGTON. D. C. 2G555 7f October 10, 1978 Mr. Lee V. Gossick Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
ACRS ACTION CN PINOSED RLVISIC'E OF REGULATORY GUIDES AND N4ENDMENTS '10 '1HE CODO OF FEDEPAL RD3UUtTICN3
Dear Mr. Gossick:
During its 222nd treeting, October 5-7, 1978, the ACRS concurred in the rcgulatory positions of the following Regulatory Guides and in the following Amendments to the Code of Federal Regulations:
1.
Regulatory Guide 1.133, Revision 1, " Loose-Part Detection Program for the Primary System of Light-Water-Cooled Reactors,"
2.
Regulatory Guido 1.134, Revision 1, " Medical Evaluation of Perconnel Requiring Operator Licenses,"
3.
Regulatory Guide 1.20, Revision 2, " Quality Assurance Program Requirements (Design and Construction)," and 4.
Amendments to Appendices to 10 CFR Part 50, " Licensing of Pro-duction and Utilization Facilities":
(a) Appendix G, " Fracture Toughness Requirements," and (b) Appendix II, Reactor Vessel Material Surveillance Program Requirements."
Sincerely, SE$l$C4t/ O WA*C Ste hen Lawrocki Chairman cc:
- 11. Denton, NRR R. Minogue, OSD bec: ACRS itembers G. Arlotto, OSD J. Jacobs S. J. Chilk, SECY H. Voress W i.18h/O[
_ _ _ _ - _ _ - _