ML20148G456

From kanterella
Jump to navigation Jump to search
Forwards IE Inspec Rept 70-0033/78-12 on 780913-15 During Which No Items of Noncompliance Were Noted
ML20148G456
Person / Time
Site: 07000033
Issue date: 09/26/1978
From: Crocker H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ross J
TEXAS INSTRUMENTS, INC.
Shared Package
ML20148G459 List:
References
NUDOCS 7811130081
Download: ML20148G456 (2)


Text

,

,e

[

UNITED STATES NUCLEAR REGULATORY COMMISSION j l

),

REGloN lli

  1. ?'

f 799 ROOSEVELT ROAD k,

% g, oLEN ELLYN. ILLINolS 60137 Hardin Memorial e.ospital License No. 34-16032-01 ATTN:

Mr. Frederick J. Eckfeld,

Hospital Administrator 921 East Franklin Street Kenton, OH 43326 Gentlemen:

This refers to the inspection conducted by Dr. J. Glenn of the NRC's Region I office on September 22, 1978, of activities at Hardin Memorial Hospital authorized by NRC Byproduct Material License No.

34-16032-01, to the discussion of our findings with Dr. Retanna of your staff at the conclusion of the inspection, and to a subse-quent telephone discussion between Dr. Glenn and you on September 25, 1978.

The inspection was an examination of activities conducted under your license as they relate to radiation safety and to compli-ance with the Commission's rules and regulations and with the ecuditions of your license.

The inspection consisted of a selective examination of procedures and representative records, observations, independent measurements, and interviews with personnel.

During this inspection, certain of your activities appeared to be in noncompliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within twenty days of your receipt of this notice a written statement or explanation in reply, including for each item of noncompliance: (1) corrective action takt and the results achieved; (2) corrective action to be taken to avoid further non-compliance; and (3) the date when full compliance will be achieved.

7813noogg,,

s..

j e

\\

Hardin Memorial Hospital OCT 271978' We will gladly discuss any questions you have concerning this inspection.

Sincerely, 1

. B. Davis, Chief Fuel Facility and Materials Safety Branch

Enclosure:

Appendix A, Notice of Violation l

cc w/ encl

  • Central Files Reproduction Unit NRC 20b

]

/ PDR NSIC l

l h

s

,w..

+. - - - -

v-,-

..,., -.. -.. -