Final Deficiency Rept CP-88-07 Re Improper Reactor Coolant Pump Wiring.Initially Reported on 880111.Corrective Actions for Unit 1 Scheduled for Completion by 880618.Unit 2 Corrective Actions Will Be Completed Prior to Fuel Reload
ML20148G415
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/25/1988
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-88-07, CP-88-7, TXX-88276, NUDOCS 8803290141
Download: ML20148G415 (1)


Text

.

a

==

F7 LOG # TXX-88276 1

FILE # 10110 Z

Z 908.3 HlELECTRIC REF. # 10CFR50.55(e)

March 25, 1988 Milliam G. Counsil Enecutan Vwe tresant V. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 REACTOR COOLANT PUMP WIRING SDAR: CP-88-07 (FINAL REPORT)

Gentlemen:

On January 11, 1988, we notified you by our letter, logged TXX-88066, of a deficiency involving reactor coolant pump wiring which we deemed _ reportable under the provisions of 10CFR50.55(e).

This is a final report submitted to provide the generic implications and corrective action completion schedule for this issue.

In TXX-88066, we noted that the reactor coolant pump wiring configuration was being evaluated to assure proper isolation end separation of Class IE and non-Class 1E circuits, cables, and devices.

We have completed this evaluation and isolation devices will be installed in both trains of Class 1E circuits and the cable will be rerouted as non-Class IE beyond the isolation devices. With the addition of the isolation devices, only non-Class lE cables will enter and terminate inside the Train "C" 6.9kV Switchgear.

This deficiency could have affected Class lE to non-Class IE cable interfaces in Units 1 and 2.

Corrective actions for Unit 1 are currently scheduled 'or completion by June 18, 1988.

The corresponding Unit 2 corrective actions will be completed prior to Unit 2 fuel load.

Very truly yours, W. G. Counsil Bv:

Jr n W. Beck Vice President, Nuclear Engineering WJH:clk c-Mr. R. O. Martin, Region IV ResidentInspectors,CPSES(3) 8803290141 880325 DR ADOCK 0500 5

,g j

,,,,, g g,,

,