'INITED STATES NUCLEAR REGULATORY COMMISSION DETROIT EDIS0N COMPANY WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET NO. 50-341 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The United States Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-43, issued to the Detroit Edison Company and Wolverine Power Supply Cooperative, Inc. (the licensees), for operation of Fermi-2 located in Monroe County, Michigan.
In accordance with the licensees' application for amendment dated November 20, 1987, the amendment would revise the provisions in the Technical Specifications to correct an error in Table 3.3.7.12-1, "Radioactive Gaseous Effluent Monitoring Instrumentation," by deleting Item 3.d, Effluent System Flow Rate Monitor for the Standby Gas Treatmant System (SGTS).
The correction would make Table 3.3.7.12-1 consistent with the Surveillance Requirements of Technical Specification Table 4.3.7.12-1.
Prior to issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
%[$
P P
A
q n
7 By April 25, 1988, the licensees may file a request for a hearing with respect to issuance of the amendment to the subject facility operating licer e and any person whose intarest may be affected.by this proceeding and who wishes to participate as a party in the proceeding must file a written request for hearing and a petition for leave to intervene.
Requests for a hearing and petitions for leave to intervene shall be filed in accordance with the Commission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2.
If a request for a hearing or petition for leave to intervene is filed by the above date, the Commissfoa or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition, and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for ieave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding.
The petition should specifically explain the reasons whv intervention should Le permitted with particular reference to the following factors:
(1) the nature of the petitioner's right under the Act to be m?de a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the
?
proceeding on the petitioner's interest.
The petition should also identify the t
7
~
l.
t I
specific aspect (s) of the subject matter of the prcceeding as to which petitioner wishes to intervene.
Any person wno has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days prior to the first pre-hearing confererce scheduled in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than fifteen (15) days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene, which must include a Iist of the contentions that are sought to be litigated in the matter, and the bases for each contention set forth with reason-able specificity.
Contentions shall be limited to matters within the scope of the amendment under consideration.
A petitioner who fails to file such a supple-ment which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunit; to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention: Docketing and Service nranch, or may be delivered to the Commission's Public Document Room, 1717 H Street, N.W.,
1 4-
~
Washington, D.C., by the above date. Where petitions are filed during the la'st ten (10). days of the notice period, it is requested that the petitioner promptly so inform the Commission by a toll-free telephone call to Western Un at 1-800-325-6000 (in Missouri 1-800-342-6700).
The Western Union operator should be given Datagram Identification Number 3737 and the following message addressed to Martin J. Virgilio:
(petitioner's name and telephone number);
(date petition was mailed); (plant name); and (publicatiun date and page number of this FEDERAL REGISTER notice).
A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, 20555, and to John Flynn, Esq., Detroit Edison Company, 2000 Washington, D.C.
Second Avenue, Detroit, Michigan 48226, attorney for Detroit Edison Company.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained l
absent a determination by the Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or reques should be granted based upon a balancing of the factors specified in 10 CFR l
2.714(a)(1)(i)-(v) and 2.714(d).
If a request for hearing is received, the Commission's staff may issue l
l the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for pub comment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.
I
1 L
For further details with respect to this action, see the application for amendment dated November 20, 1987, which is available for public inspection at the Commission's Public Document Room, 1717 H Street, N.W., Washington, D.C.
~
20555, and at the Monroe County Library System, 3700 S. Custer Road, Monroe, Michigan 43161.
Dated at Rockville, Maryland, this 15th day of March 1988.
FOR THE NUCLEAR REGULATORY COMISSION
, Ibulev $ hpy Theodore R. Quay, Project Manager Project Directorate III-1 Division of Reactor Projects III, IV, V
& Special Projects i
F
-v-r-
_ n
+-
-.y..
~.
March 15, 1988 Docket No. 50-341 DISTRIBUTION Cocket File NRC & Local PDRs Mr. 8. Ralph Sylvia PD31 Plant Gray Group Vice President GHolahan Nuclear Operations RIngram Detroit Edison Company TQuay 6400 North Lixie Highway OGC Newport, Michigan 48166 DHagan ACRS (10)
Dear Mr. Sylvia:
GPA/PA
SUBJECT:
FERMI-2 (TACN0.66659)
Enclosed is a "Notice of Consideration of Issuance of Icendment to Facility Operating Licen.ce-and Opportunity for Hearing" concerning your application for amendment dated November 20,1987(NRC-87-0217). This Notice was forwarded to the Office of the Federal Register for publication.
Sincerely,
, hecA 'h ku 3 Theodore R. Quay, Project Manager Project Directorate III-1
-Division of Reactor Projects - III, IV, V
& Special Projects
Enclosure:
As stated cc w/ enclosure:
See next page 0GC hy
,.A/PD31:DRSP PM/PD31:DRSP D/PD31:DRSP l
,j
[< IIngram TQuay:lt MVirgilio e
gr 02/,7 9
0FFICIAL RECORD;/88 g/0/88 32/;,1(s/88 02/16/88 COPY
.c (aF h)V31/JUfl?
i
\\
?2 2
s w
-[
N
DISTRIBUTION be March 16, 1988 IDOCKET FILE:
PD31 PLANT GRAY RINGRAM TQUAY MVIRGILIO DOCKET NC5 05 0- 3 41 Rules and Procedures Dranch MEMORANOUM FOR:
Division of Rules and Records Office of Administration FROM:
Offlee of Nuclear Reactor Regulation suaxcT:
FERMI -2 (TAC NO. 66659)
One signed original of the Federal Reg / ster Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 5
)of the Notice are enclosed for your use.
Notice of Receipt of Application for Construction Permit (s) ana Operating License (s).
Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Tline for Submission of Vieas on Antitrust Matters.
Notice of Consideration of issuance of Amendment to Facility Operating License.
Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License (s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft / Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Availability of Safety Evaluation Report.
Notice of issuance of Construction Permit (s).
Notice of fsauance of Facility Operating License (s)or Amendment (s).
Order.
Exemption.
Notice of Granting Exemption.
Environme. cal Assessment.
Notice of Preparation of Environmental Assessment.
C Other. On page 1,
paragraph 4, please insert the date for a 30-dny intervention period, and call Crystal Roberson X21318 with the date.
Office of Nuclear Reactor Regulatior Project Diractorate III-1 Division of Reactor Projects - III, IV, V
& Special Projects
Enclosure:
As stated