Forwards Rev 15 to GGNS-TOP-1A, Operational QA Manual (Oqam). Changes Have Been Evaluated & Determined Not to Reduce Commitments Contained in Previously Accepted QA Program Description.Approval of Changes,Requested
ML20148F888
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/28/1997
From: Hagan J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148F894 List:
References
GNRO-97-00044, GNRO-97-44, NUDOCS 9706050089
Download: ML20148F888 (3)


Text

.

==Entergy BB C Tel 601437 6408 Fax 601437 2795 Joseph J. Hagen Vice Presidern Operatons Grand Gulf Nuclear Stahon i

May 28,1997 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station 4

Docket No. 50-416 j

License No. NPF-29 Operational Quality Assurance Manual (OQAM), Revision 15 I

Reference:

1. Letter from Suzanne C. Black, Office of NRR, to Stephen D. Floyd, NEl, dated October 24,1996.

GNRO-97/00044 i

Gentlemen:

As required by 10CFR50.54(a)(3), Entergy Operations, Inc. is submitting as Attachment 1, W

the Grand Gulf Nuclear Station Operational Quality Assurance Manual (OQAM), Topical Report GGNS-TOP-1A, Revision 15.

j The changes incorporated into Revision 15 are mostly administrative in nature, reflecting primarily organizational and title changes. These changes have beers evaluated and determined not to reduce commitments contained in the previously accepted Quality Assurance Program description (OQAM, Revision 14). However, there are two proposed-changes (Attachment 2, Actions 5 & 6) that may constitute a reduction in commitments as described in Reference 1. We are requesting approval for these two proposed changes prior to implementation.

L The first requested change involves replacement of the annual supplier evaluation with an alternative ongoing performance evaluation that is based on a Nuclear Energy Institute (NEI) proposal that the NRC staff previously reviewed and found generally acceptable (Ref.1).

The second requested change involves a change in the responsibility for the appointment of Level lli receipt inspectors from the Director, Quality to the Vice President, Operations Support. This change does not alter the performance of any inspection activity or personnel qualification requirement. We believe this change could be viewed as not reducing commitments, since the functions, and qualification requirements are maintained and lines of authority, responsibility, and communication continue to be clearly established at appropriate g

9706050089 970528

{

kh k,b

-R%

,e y a.nu

)

PDR ADOCK 05000416 p

PDR

GNRO-97/00044 Page 2 of 3 r

management levels. However, due to the ambiguity that currently exist over the definition of a reduction in commitment and the safety importance of this function, EOl is conservatively requesting prior approval.

Revision 15 of the OQAM continues to satisfy the requirements of 10CFR50 Appendix B and

' the Regulatory Guides and ANSI Standards referenced in Appendix A to the OQAM.

Identification of the specific changes, along with the reason for the change, and the basis for this conclusion as required by 10CFR50.54(a)(3)(ii)is delineated in Attachment 2.

As required by 10CFR50.71, I hereby certify to the best of my knowledge, information, and belief, that the information provided herein accurately reflects changes made since the last

submittal of the OQAM.

Should you have any questions, please contact Mr. Gary W. Ingram at (601) 437-6716.'

i Yours truly, i

,e -

WBAlams attachments:.

1.

perational Quality Assurance Manual (OQAM), Revision 15 2.10CFR50.54(a)(3)(ii) Commitment Verification cc:

(See Next Page) 1 l

i R

09705161 l

l..

l l

1 l

f GNRO-97/00044 Page 3 of 3 cc:

NRC Senior Resident inspector (w/a)

Mr. N. S. Reynolds (w/a)

Mr. L. J. Smith (w/a)

Mr. H. L. Thomas (w/o)

Mr. J. W. Yelverton (w/o)

Mr. E. W. Merschoff (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 G9706161