ML20148F834

From kanterella
Jump to navigation Jump to search
Advises of Planned Insp Effort Resulting from Ppr,Completed on 970314.Detailed Insp Plan for Approx Next 6 Months,Encl
ML20148F834
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 04/28/1997
From: Burgess B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 9706050058
Download: ML20148F834 (3)


Text

- . _ .

April 28,1997 K. P. Powers, Plant General Manager Big Rock Point Nuclear Plant Consumers Power Company 10269 US 31 North Charlevoix, MI 49720

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - BIG ROCK POINT

Dear Mr. Powers:

On March 14,1997, NRC Region til management and staff completed the semiannual Plant Performance Review (PPR) of Big Rock Point. The Region conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by regional management to facilitate planning and allocation of inspection resources. The PPR for Big Rock Point involved the participation of all Region lit technical divisions as well as responsible NRR staff, in evaluating inspection results and safety performance information for the period from October 1996 through March 1997. PPRs provide regional management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

No changes in inspection focus were identified as a result of the PPR.

This letter advises you of our planned inspection effort resulting from the ,

Big Rock Point PPR review. The information is provided to enable appropriate consideration of the resource impact on your staff, and to permit scheduling conflicts and personnel availability issues to be resolved in advance of inspector arrival onsite. The enclosure details our inspection ph n for approximately the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

\

\\

9706050058 970428 kklkkkkkkk

,**, k PDR ADOCK 05000155 .

G PDR

l I

P. M. Donnelly I We will inform you of eny changes to the inspection pian, if you have any questions, please contact me at 630-829 9629. ]

Sincerely, i

/s/ Bruce L. Burgess .

Bruce L. Burgess, Chief Reactor Projects Branch 6 l Docket No. 50-155 l License No. DPR-6

Enclosure:

Inspection Plan cc w/ encl: Robert A. Fenech, Vice President, Nuclear Operations l

James R. Padgett, Michigan Public  !

Service Commission Michigan Department of Public Health Department of Attorney General (MI)

Docket File w/ence OC/LFDCB w/ encl BRP PM, Nr.R w/ encl DRP w/enci SRI BRP, Niisades U/ encl PUBLIC IE-01 w/ encl A. B. Beach, w/enci Deputy RA, w/ encl i

Rill PRR w/ encl Rill Enf. Coordinator, w/enci l

l l

Document: On Disk g ,r, - . ., .< sme. w v . iwi s. i. sm. m -c - c .,is .ss / i -c - cw -ism .ss /-i =-

0FFICE RIII RIII a 4 RIII _

RIII nk '

! NAME kdg'higYt:dp Gardner M N ch/Koza M Burgss h l DATE 4/#/97 4/k/97 4/;4/97 4/h/97 0FFICIAL RECORD COPY

BIG ROCK POINT INSPECTION PLAN .

V IP - Inspection Procedure TI - Temporary Instruction '

Core Inspection - Ninimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUNBER OF PLANNED TYPE OF INSPECTION -

PROGRAN AREA INSPECTORS INSPECTION CONNENTS DATES TI 2515/132 Security Vehicle Barrier 1 4/28-5/1/97 TI Review i

TI 81700 Security 1 4/28-5/1/97 Core Physical Security Inspt IP 83750 Radiation Protection 1 5/12-5/16/97 Routine Radiation Protection IP 73753 Inservice Inspection / Flow 1 During Routine Inservice Inspection; Accelerated Corrosion Refueling and Initiative Followup Review Outage Review of Flow Assisted ,

Corrosion Inspection Program IP 84750 Radioactive Effluents and 1 4/14-18/97 Core Effluent and Chemistry Chemistry Inspections i

i

.