ML20148E978

From kanterella
Jump to navigation Jump to search
Forwards 780929 Memo Re Recent Fire Protection Tests Performed by Ul for NRC
ML20148E978
Person / Time
Site: 05000471
Issue date: 10/25/1978
From: Beverly Smith
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Callihan A, Cole R, Luton E
Atomic Safety and Licensing Board Panel, UNION CARBIDE CORP.
Shared Package
ML20148E980 List:
References
NUDOCS 7811070209
Download: ML20148E978 (1)


Text

  1. " '% UNITED STAi ES yN.s T NUCLEAR REGULATORY COMMISSION WASHINGT ON, D. C. 20555 g

%,.... / October 25, 1978 Edward Luton, Esq., Chairman Dr. A. Dixon Callihan Atomic Safety and Licensing Board Union Carbide Corporation U.S. Nuclear Regulatory Commission P.O. Box Y Washington, D. C. 20555 Oak Ridge, Tennessee 37830 Dr. Richard F. Cole g ap, ,

Atomic Safety and Licensing Board e U.S. Nuclear Regulctory Commission 3 Washington, D. C. 20555 $7c ,

In the Matter of 9 0C126 WA > 31 BOSTON EDISON COMPANY, ET AL. -

p*e %**

vg#,,8 (Pilgrim Nuclear Generating Statiiiri, Unit 2) y Docket No. 50-471 4 y li #

Gentlemen:

Enclosed is a memorandum from the Director of the Office of Nuclear Reactor Regulation to the Commissioners dated September 29; 1978 discussing the results of a recently conducted fire protect;on research-test by the Underwriters Laboratory for the Commission as part of the NRC's fire protection research program.

Our preliminary analysis of the test results described in the enclosed memorandum does not alter the Staff's conclusion in the Pilgrim Unit No. 2 SER, Supplement No. 3, Section 9.5.1, that sufficient flexibility exists in the Pilgrim Unit No. 2 design to allow implementation of any design changes that may be necessary to assure compliance with Appendix A to Branch Technical Position 9.5.1.

Sincerely, wMyjl' k 1

Barry H. Smith Counsel for NRC Staff

Enclosure:

As stated cc w/

Enclosure:

Pilgrim Service List 781107 o a_oq F