ML20148E802
| ML20148E802 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 05/29/1997 |
| From: | Ewing E ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20148E807 | List: |
| References | |
| W3F1-97-0093, W3F1-97-93, NUDOCS 9706030271 | |
| Download: ML20148E802 (2) | |
Text
.- __.
}^ gg w h.
l y
Ente gy Operations. Inc.
Killona. LA 70066 Tel 504 739 6242 I
Early C. Ewing, til a afety & Regulatory Affairs W3F1-97-0093 i
A4.05 PR May 29,1997 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Waterford 3 Cycle 9 Core Operating Limits Report Gentlemen:
Waterford 3 Technical Specification 6.9.1.11.3 requires submittal of the Core Operating Limits Report (COLR) for each reload cycle. Please find attached Revision 0 and Revision 1 of the COLR for Waterford 3 Cycle 9.
f Due to extensive revision required by a two-week outage in mid-1996, the reload analysis for Cycle 9 was not received in time to allow the complete COLR to be
[
prepared prior to the refueling outage which began April 11,1997. In order to facilitate initial fuel movement, Revision 0 of the COLR for Cycle 9 was prepared J address Mode 6 operations only. Once the cycle 9 reload analysis was received, Revision 1 of the COLR was prepared to address operation in all modes during Cycle 9.
l 9706030271 970529
^
l PDR ADOCK 05000382 P
PDR 0300W lIlllllllllll!!)!!\\\\\\,\\lilyllll
. --... - _ -. _ ~.
-... ~
.o Waterford 3 Cycle 9 Core Operating Limits Report W3F1-97-0093 Page 2 May 29,1997 Should you have any questions concerning this subject, please contact Paul Caropino at (504) 739-6692.
Very truly yours, he ?
t
/.
E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ ELL /ssf l
Attachments cc:
E.W. Merschoff, NRC Region IV C.P. Patel, NRC-NRR l
J. Smith N.S. Reynolds l
NRC Resident inspectors Office l
Administrator - LRPD American Nuclear insurers I
I l
i I
,