I OPERATING DATA REPORT Rj.295 DOCKET NO.

DATE /R-3 *8 ~/

]

COMPLETED BY G hsho TELEPHONE M M9' OPERATING STATUS

1. Unit Name:

/R N

2. Reporting Pu%d:

87No/ cmo 70 87//30 DV00

3. Licensed Thermal Poww (MWt):

3D

/o88

4. Nameplate Rating (Grom MWe):

/dVO

5. Desiga Electrkal Rating (Wt MWe):

/0 6

)

6. Maximum Dependable Capacity (Gross MWe):

/6VO

9. Maximum Dependable Capacity (Wt MWe):

i

8. If Changes occur la Capacity Ratiass (Items Number 3 Through 7) Since !.ast Report, Give Reasons:

A/#

i

9. Power Level To Which Restricted,if Any (Nge):
10. Reasons For Restrictions,If Any:

1 This. Nth Yr. ten Dete Cumuletive NO 80M b

/24

11. Hows la Reporting Period
12. Number Of Hours Rasetor Was C$tkal 7Ad 0 0/S 8 ff.3'//,'S
13. Reactor Reserve Shutdown Hows
d. O O d,,,

I 64/.8

14. Hours Generator On Line 7A O O 57M. '/

P2. 797.<::,

15. Unit Reserve Shutdown Hours O. O CO O.O
16. Grea Thermal Energy Generated (MWH) 2 /#120 R

/0 4 3 9. 3 0 V' 2 3 5 W O 6.2 2

19. Gross Electrks) Energy Genereud (MWH) 7W o3V f698/e07 76 </63 '725'
18. Nt Electrks! Emergy Generstod (MWH) 7//. 33 7 5 33/o R/.9

% DVf 7W l

19. Unit Service Factor

/60 0 7/./-

6Z 9

20. 'Jalt Availability Factor

//YA O 7/. 6

//7. 9

21. Unit Capacky Factor (Using MDC Net)

'75,O 6 9' o

/,0. O

22. Valt Capacity Factor (Using DER Net) 95 O

/o'/. O

/oO, O

23. Unit Fo: cod Outage Rate C. O 0, O

/2, 8

24. Shutdowns Scheduled Over Nxt 6 Months (Type. Dete, and Duration of Eachl:

f68E000'.25 /988 /S & Cum nHv.Sc/wdu/ed SkuldA a'a H.. '

25. If Shut Down At End of Report Period. Estisneted Date of Startup:
26. Units in Test Stotus (P.4or io Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRKTTY g

COMMERCIAL OPERATION 8801250559Ogf95 PDR ADOCK O NW PDR R

0 l

OPERATING DATA REPORT fo-3 09 DOCKET NO.

DATE M-M 7 COMPLETED BY & 4u_<7-d4 TELEPHONE 7*6 - 2 O?'l ERATING STATUS Z IO^l SlT DO

1. Unit Saw:
2. Reporting Pened. %7 /I O / ODM To T7//SO R400
3. Licensed Thennal Power (MWt):

3260

4. Nanwplete Rating (Groes MWe):

/0 M S. Design Electrkal Rating (Net MWe):

/ O #O

/OE6

6. Maximum Dependable Capacity (Gross MWe):

/040

7. Maxhaum Dependable Capacify (St MWe):
8. If Changes occur in Capacity Ratings (lterns Number 3 Through 7) Sines Last Report. Give Reasoas:

A/A

9. Power Level To Which Restricted. lf Any (St MWe):

M

10. Reasons For Restrictions.lf Any:

A/A

~

This Month

.Yr.to-Dete Cameletive

!!. Noen la Reporths Per6ed 7 dor O 80/b,O

//6 7ds, O

12. Naseber Of Houn Reactor Was CInical 7?O, O

'/S 25i 7 74 OZ7, 7

13. Reactor Reserve Shutdows Houn 0, O O. O 22(,, /

I4, Houn Generator on.Line 740,O 4 M/O,6~

8/ 6/V,2

!$. Unit Reserve Shutdown Hous OO O, O o, D

16. Gross Thenma! Energy Generated (MWH) 23b9036

/3 7V9 364 A37428/6O

17. Gross Electrical Energy Generetad (MWH)

'76 4 6 4K _

4 699 346 73347776

18. Net Electrkal Energy Genersted (MWH)'

73'1 4/4 4'374'603 72' % 3'374 j

19. Unit Serv 6ee Facter

/60,D

' 5 7', 9

' 70,g

20. U4t Availability Factor

/00 > O 6 7, 't 70,6'

21. Unit Cassetry Factor (Using MDC Net) 90/

_54, 6, _

/, o, M

22. Unit Capacity Factor (Using DER Net)

VL/

Sd. 6 60, R

23. Unit Forced Outage Rate 0,O d.E

/ y </

24. Sheldowns Scheduled Over Nxt 6 Months (Type.Dete,and Dwetion of Each):

A/A

25. If Shut Down At End Of Report Period.Estisasted Date of Startup:

M

24. Units in Test 5:stus (Prlor to Commercial Operation):

Foreenet Achieved INITIAL CRITICALITY INITIAL ELECTRICITY A/A COMMERCIAL OPERATION g C,oRR6cJT EL CCP] k)RITTE A) bY b.MACbEEGs0R oN /-/5-37 (4/77)

C:mm::nwealth Edisin Zion G:nerating Station 101 Shiloh Blvd.

1 Zion, Illinois 60099 Telephone 312/746 2084 January 18, 1988 Mr. Wm Lovelace U.S.

Nuclear Regulatory Comm.

Washington, D.C.,

20555 Dcar Sir, Enclosed please find corrected data reports for Zion's November 1987 Operating Status Report.

November's report reflected incorrect figures of both U1 and U2 Gross Thermal Energy generated.

This was a result of a transcription error from a computer printout.

The corrected figures were given by Mr.

L.

Trezise by telephone January 14th, 1988.

Sincerely,

) (f

/, G.

J.

Pliml f

Stati'on Manager Zion' Station GJP/jlc Enclosure cc:

D.

P.

Galle J.

G.

Keppler (NRC)

L.

D.

Butterfield H.

E.

Bliss A.

Gianopoulos L.

J.

Anastasia INPO Division of Eng. Health State of Illinois Tech Staff File Director, Office of Inspection and Enforcement Master File

{

OPERATING DATA REPORT fa-295 DOCKET NO.

DATE /R-3 *87 COMPLETED BY GMh TELEPHONE 'NG 208'/

OPERATING STATUS

/#

N

1. Unit Name:
8. Reporting Per6od:

87"O/ *ZO TO 87//30 8VdO 8N

3. Licensed Thermal Power (MWt):

/o88

4. Nameplate Rating (Grom MWe):

/0VO

8. Design Electrkal Rating (Net MWe):

/06

6. Maximum Dependable Capacity (Gross MWe):

/dVO

7. Maximum Dependabh Capacify (Net MWe):
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

A/#

N

9. Power Level To Which Restricted,if Any (Nge):
10. Reasons For Restrictions.!f Any:

This Month Yr.. ten Dete Cummistive 4

NO 80M*b

/2S kNe

11. Hours la Reporting Per6od
12. Number Of Houn Rasesor Was Chthcal

'720.0 4/ 93. B

/5 3?'/. 2

13. Reactor Reserve Shutdown Hours
d. O d.O I 64/.8
14. Houn Generator on.une 7A O. O 57M V P2. 7'77.(o
18. Unit Reserw Shutdown News O. O O. O C.O
16. Grom Thennal Energy Generated (MWH) 2 /fd 26 2

/6459,30V R35 9VO 622

19. Gross Eketrkal Energy Generated (MWH) 7Wo3V f 6 9 S G G 9' 74 v63'725'
18. Net Ekctrkal Energy Generated (MWH) 7/[ 839

$336 R69 7G. CVf. '7W

19. Unit Serv 6ce Factor

/40 0 7/. 2, 67 9

20. Unit Availability Factor

/M. o 7/. /o G7. 9

21. Unit Capocky Factor (Uelag MDC Net)

'75. O M/. O GO. O

22. Unit Capedty Factor (Uning DER Net)
95. O 6V O

/od. O

23. Unit Forced Outage Rate O. O C, O

/2, F

24. Shutdowns Scheduled Over Next 6 Months (Type.Dete,and Duration of Eacht:

SS6400O'.26 /928 /.S Yke Cueeenh.Schedu/ed Skutd' M do h*-.. '

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prlor to Commercial Operation):

Tmet Achiewd INITIAL CRITICAUTY INITIAL ELECTRICITY g

COMMERCIAL OPERATION (9/77 i

i

OPERATING DATA REPORT DOCKET NO. 89 - 9 N DATE / A - 3 '~ 7

/

COMPLETED BY s. 4usW4 TELEPHONE * - - E ?*/

OPERATING STATUS i

i 1 i O ^l bl V'T TWO N'

1. Unit Name:
2. Repordag Pwtod V7/IC/ ODC 70 Y"5U d'f AO l

3

3. Licensed Thannal Poww (MWt)-

O E

4. Nameplate Rating (Gross WWe)-

/ C "'O S. Design Doctrkal Rating (Net MWe):

/'M

6. Mashnum Dependable Capedty (Gross MWe):

/O'fO

7. Maxhnen Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Iterns Number 3 Through 7) Sines 1.ast Report. Giw Reasses:

4/4

9. Power level To Which Restricted. lf Any (Net WWe):

M

10. Reasons For Restr6ctions.lf Any:

M4 This Month

,Yr..to De te CumujetM

11. Hoers la Reporting Per6ed 720 O EQ/5,O

//6 7M. O

12. Number of Houri Rescser Was Cr6tical 740 = O JM 7 W OR7. 7
13. Reactor Reserve Shutdown Houri O, O C. O l2.M /
14. Houri Gener:4orOs.l.Ame 7JC O 464D,6-

_g,/9 J

15. Unit Resern St adown News O.O O.O OO
16. Grom Thersw Emergy Generated (WWH) 2 h4036

/3 7V9 36V A37 8/ED

17. Gross Electrical Emergy Generstad (MWH)

'76 T649

'l 599 34L-735477 %

18. Net Becerkal Energy Generstod (MWH)~

734 4/J (374 503

- 7T3b3'E

19. Unit Serv 6es Fm

/M D 5 7, '/

' 76, ff

20. Unit Aveliability Factor

/00 0 5 7, '/

70, f

21. Unit Capacity Facur (Using MDC Net)

VE,/

SR 6

/s C, M

22. Unit Capedty Factor (Using DER Net) 97,/

Sd. 6 6.O R

23. Unit Forced Outege Rate 0,O M,Z

/ */. 4/

24. Sheadowns Scheduled Over Next 6 Months (Type. Dete,and Duration of Each):

4/4 2$. If Shut Down At End Of Report Ported.Esthmeted Date of Startup:

M

36. Units in Test Seetus (Pr6er to Cosasnercial Operation):

Forecset Achieved INITIAL CRITICALITY INITIAL ELECTRICITY A/6

)

COMMERCIAL OPERAT10N

) CxRREc TE.L CcP/ MTTE A.) U b.dAC belECE. o Al /-/6-77 (4/77)

C:mm:nwealth Edis:n Zion Generating Station 101 Shiloh Blvd.

Zion, Illinois 60099 Telephone 312/746 2084 January 18, 1988 Mr. Wm Lovelace U.S.

Nuclear Regulatory Comm.

Washington, D.C.,

20555

Dear Sir,

Enclosed please find corrected data reports for Zion's November, 1987 Operating Status Report.

November's report reflected incorrect figures of both Ul and U2 Gross Tharmal Energy generated.

This was a result of a transcription error from a computer printout.

The corrected figures were given by Mr.

L.

Trezise by telephone January 14th, 1988.

Sincerely, 5 (f

/

G.

J.

Pliml f

Station Manager

~

Zion Station GJP/jlc Enclosure cc:

D.

P.

Galle J.

G.

Keppler (NRC)

L.

D.

Butterfield H.

E.

Bliss A.

Gianopoulos L.

J.

Anastasia INFO Division of Eng. Health State of Illinois Tech Staff File Director, Office of Inspection and Enforcement Master File

OPERATING DATA REPORT l

DOCKET NO. fo-295 DATE /R-3 *87 COMPLETED BY G A/Sho TELEPHONE 'NG 208'/

OPERATING STATUS N

N

1. Unit Name:
8. Reporting /eriod:

87"O/ CEC TO 87//30 #VdC 8N

3. Licensed Thermal Power (MWt):

/d88

s. Nanwplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): -

/OVO

6. Maxhnum Dependable Capacity (Gross MWe): /.2 6
7. Maximur. Dependable Capacify (Net MWe):

4Md

8. If Changes Occur in Capacity Ratings (Itema Number 3 Through 7) Since !.ast Report. Give Reasons:

A/#

N

9. Power Level To Which Rastricted. lf Any (Nge):
10. Reasons For Restrictions.lf Any:,

This Month Yr..to.Dste Cumulative 72 O

80 8#. b

/2/

b'7'

11. Hours in RW Period

/

11. Number C'f Mr..s Rasesor Was CI1tical

'7Ad O

/e/ 83. p.

  1. 5. 3V/. S 8
13. Reactor Resern Shutdows Hours dO O.U I 64/.8
14. Hours Generster On.une 7A O. O 57M,V P2 797,d.
15. Unit Resern Shutdown Hours O. O ad OO
16. Grom Thars.a! Emergy Gemerated (MWH) 2/11262

/65393CV 235 WO 522

19. Gross Electrical Energy Generstad (MWH) 7Wo3V f695/GF 76 </63 '/2 5"'
18. Net Electrical Energy Genersted (MWH) 7// 839 5.F 3 /a R 6 9

% DVf WV

19. Unit Sernoe Factor

/d0 0 7/. &

G7 '7

20. Unit Avallability Factor

/M o 7/.lo 07.9

21. Unit Capacky Factor (Uelng MDC Net)

'75,O (W C 60.O

22. Unit Capadty Factor (Using DER. Net) 95 O

/oM C

/oO, O

23. Unit Forced Outage Rate O. O O. O

/2, 8

24. Shutdowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each):

SE8EUORY.25 /928 /S The Curryn/'lY SClar ube$ 5 UN&

WO h. '

25 If Shut Down At End Of Report Peeted.Estimeted Date of 5tartup:

26. Units la Test Status (Prior to Commrecial Operation):

Forecast Achieved i

INITIAL CRITICAUTY INITI4L ELECTRICITY 4,g I

COMMERCIAL OPERATION N/77)

,-r

-,-------------e a

wr

~

-,7-


.---,w---,

OPERATING DATA REPORT IO - 3 N DOCKET NO.

DATE /4-3

  • 7 COMPLETED BY c, 4av p'#

TELEPHONE 7"e - WM OPERATLNG STATUS Z IO Al blll'T TM/O N'

1. Unit Name: _

1, neparung pg 9 7II CI OnorTo7?n$DAnno

3. Llosased Thennal Poww (MWt):

37f0

/Nt 6

4. Nameplate Rating (Gross WWe):

/ O "'D

5. Design Electrien! Rating (Wt MWe):

/C M

6. Maximum Dependable Capacity (Gross MWe):

/040

7. Maximum C.; ": Capacity (Mt MWe):
8. If Changue Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Raport, Give Rassene:

WA

9. Poww Level To Which Restricted.lf Any (Net MWe):

M

10. Reasons For Restrictions.lf Any:

V4 This Month

,YrAs Dete cuaneistive 720:O FO/E.O

//6 7dC O

11. Hours la Reperdas Por6ed
12. Number Of Moun Rancier Wes C local 7?O O TE 26i 7 74 OR 77
13. Reactor Reserve shutdown Hows 0,O O, O 2.M, /

I4, Hours Generator On.Lhee 740.O 4640 5 8/ 6./9 2

15. Unit Reserve Shutdown Houri O.O O.O O_ D
16. Grom nanaal Energy Genersted (MWH)
2 hyo86

/3 7V9 364 A37 4M /EO

17. Gross Electrical Energy Generstad (WWH)

'76 4 6 W

'l 699 34L-74347776

18. Et Elecerleal Easrsy Gemeested (MWH) 7 N'4/2

" 3 7'l 6 0 3 773h 3'37'/

19. Unit Service Facter

/dC D

' 67,9

76.8

20. Unit AM"ry Faster

/ O C). O 57,9

76. f
21. Unit Capacky Factor (Using MDC Nt)

VEr/

54 6 6 C. M

22. Lait Capacity Facter (Using DER kt)

Y?,/

54 6 6C. R

23. Unk Forsed Oseage Rate 0,O R.Z

/% v

24. Shendowns Scheduled Over Mxt 6 Months (Type.Dete.and Durstion of Eachl:

&4

25. If Shut Down At End Of Report Per6od. Estimated Date of Startup:

M 2d. Units la Test Santes (Prior to Comunwceal Operation):

Forecnet Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY A/6 COMMERCIAL OPERATION

$ CcRREcTEL CDP 1 h)RITTE V bY b..d4CbEEG>0R oA) /-/6-77 (4/771

C:mm:nw:alth Edis:n Zion gin: rating Station 101 Shiloh Blvd.

Zion, Illinois 60099 Telephone 312/746 2084 January 18, 1988 Mr. Wm Lovelace U.S.

Nuclear Regulatory Comm.

Washington, D.C.,

20555

Dear Sir,

Enclosed please find corrected data reports for Zion's November, 1987 Operating Status Report.

November's report reflected incorrect figures of both U1 and U2 Gross Thermal Energy generated.

This was a result of a transcription error from a computer printout.

The corrected figures were given by Mr.

L.

Trezise by telephone January 14th, 1988.

Sincerely, 5 lf a

/

G.

J.

Pliml f

Station Manager Zion Station GJP/jlc Enclosure cc:

D.

P.

Galle J.

G.

Keppler (NRC)

L.

D.

Butterfield H.

E.

Bliss A.

Gianopoulos L.

J.

Anastasia i

INPO Division of Eng. Health State of Illinois Tech Staff File Director, Office of Inspection and Enforcement Master File

9 OPERATING DATA REPORT DOCKET No. EO-270 DATi /R-3 ~8 '7 COMPLETED 5Y de*Sho TELEPHONE 'N/e20FV OPERATING STA'11.!$

/M N

1. Unit Name:

g, geparung pasag.

87No/ omo 70 87H30 DV00 8N

3. Licensed Thermal Pown (MWt):

/088

4. Nameplate Rating (Gross WWe):

/OFO

5. Design Electrkal Rating (Net MWe):

/0 6

6. Maxhnum Dependable Capacity (Gross MWe)'

/dVd

7. Maalmum Dependable Capacify (Net MWe):

1

8. If Changes occur la Capacity Ratings (Items Number 3 Through 7) Stace Last Report.Give Reasoas:

Al#

N

9. Power level To Which R=tr6cted.1f Any (Nge):
10. Reasons For Restrictions,if Any:

l l

This Month YrAo Dete Cummistive i

NO IOM b

/20

11. Hours in Reporting Per6ed
12. Number of Hours Ranctor was CItkal 7#d 0 0/83,'3
  1. 5.3'7'/,S
13. R=stw Rmerve shutdown Hows dO OO I 6 4 /. 8
14. Houri Gemmuo, on.une 7A O. D 57M.Y n 797.6 1
15. Unit Reser e Shutdown Heure O. O aO OO I
16. Gros nanaal Energy Gensented (MWH) 2/11262

/6 4 3 9,30 V R 35 '7Vd 522

17. Gross Electrical Energy Generstad (MWH) 7W63V f695G47 74 </(,3. 72 5~

~

18. Net Eker6 sal Energy Generstad (MWH) 7// 839 533/aR/9 7G OVE 7W
19. Unit Servios Feetor

/600 7/. 2.

67'7

20. Unit Availability Facter

/dO. O 7 /. (,

67.9

21. Unit Capacity Factor (Using MDC Net)

'75. O (d. O GO. O

22. Valt Capacity Factor (Uning DER Net) 95 O GV O

/oO, O

23. Unit Forced Outage Rate O. O O, O

/2, 8

24. Sheldowns Scheduled Over Next 6 Months (Type.Dete.and Duration of Eacht:

560f000 AS /928 /S 7ke CurrenNY. Sche $ukh Skuf$cWX.

do k. '

25. If Shut Down At End Of Report Ported. Estimated Date of Startup:
24. Units la Test Status (Pr6or to Commercial Operation):

Forecast Achieved INITIAL CRmCALITY INITIAL ELECTRIC!TY g

COMMERCIAL OPERATION (9/77)

OPERATING DATA REPORT D-EN DOCKET NO.

DATE /A-3 " 7 COMPLETED 8Y & 4uwM TELEPHONE M-WM O*ERATING STATUS

1. Unit haw:

1iW U W T DO

1. neparung Pem. 9 7 n o ! ooorTo?7nAORnoo 3MC
3. Lkensed Therusal Power (MWt):

/O M

4. Nameplate Rating (Gross WWe):

/ O dD

5. Design Electrical Rating (Wt MWe):

/0 M

6. Maximan Dependable Capadty (Gross MWe):

/O'/O

7. Maxhaum Dependable Capacity (Net MWe):
8. If Changes occur la Capacity Ratiass (Itema Nanber 3 Throuth 7)Einae Last Report.Gew Reasone:

WA

9. Power Level To Which Restricted. lf Any (Net WWe):

M

10. Reneoas For Restrictions,if Any:

V4 This Meath

,Yr..to Dete Cusamiettu

!!. News la Repercas Pated 720:O FO/s, O

//E 7df, O

12. Nessber of Houri Reactor Was Critical 7 20 O

'/F 26, 7 W O R 7. 7

13. Reacter Rassen shutdown Hows OO C,o 2A/

I4. Houri Generator 0 4.he 74C.C 4640,6~

9/ 6/9 J

!$. Unit Reserve Shutdows Nasi OO O, O O_ D

16. Gross Thorneal Emergy Genersted (WWM) 2Ab403G B 7V9 364 A37 4A? /EO i
17. Gross Electrien! Energy Generated (MWH)

'7EM649

'I 699 34E 733477 %

18. Net Electrkal EmerEr Generated (MWH) 7D1'4/2
  1. 374'603 72'3 W 374
19. Unit Serv 6ee Facser

/M D

' S '7, [/

76,I

20. Unit Ar'MSy Fester

/00 O 6 7, '/

70, f

21. Unit Capacity Factor (Uelag MDC Net) 9Ei/

51 6 A O. M

22. Unit Capadty Factor (Uning DER Net) 97,/

52 6 60 R

23. Unit Forsed Outage Rate 0,O R.Z

/ y. 4/

24. Sheldowns Schedened Over Next 6 Months (Type.Dete,and Durstles of Eachl:

4/4

25. If Shut Down At End Of Report Period.Esthmeted Date of Startup:

AM

26. Units la Test Seetus (Prior eo Cosamercial cp _h):

Ferocaat Achieved INITIAL CRmCALITY INITIAL ELECTRICITY A%

COMMERCIAL OPERAT10N

%s

-