ML20148D892
| ML20148D892 | |
| Person / Time | |
|---|---|
| Issue date: | 05/28/1997 |
| From: | Paperiello C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20148D897 | List: |
| References | |
| NUDOCS 9706020186 | |
| Download: ML20148D892 (2) | |
Text
._
MEMORANDUM TO: A. B. Brach j
R:gional Administrator, Rlli FROM:
Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards
SUBJECT:
DRAFT 1997 REGION 111 INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM (IMPEP) REPORT in April, a team from the Offices of Nuclear Material Safety and Safeguards, State Programs, Regions I and II, and the State of Colorado, reviewed the Region lli nuclear materials program as part of the IMPEP, as described in the Nuclear Regulatory Commission's Management Directive 5.6. Regional materials programs are evaluated every two years, under IMPEP, using five performance indicators common to regional and Agreement State Programs, and additional l
non-common indicators specific to NRC's four regions.
l Attached for your comment is the draft IMPEP report, which documents the results of the i
review held in your offices on April 21-25,1997. Cathy Haney, of this office, was the team leader for the Region ill IMPEP review. The review team's recommendations were discussed
+
with Cynthia Pederson, Roy Caniano, and other regional managers on April 25,1997. The final determination of Rlli program adequacy, based on the review team's report, will be made by a Management Review Board (MRB) composed of NRC managers and an Agreement State Program manager, who serves as a liaison to the MRB.
In accordance with procedures for implementation of IMPEP, we are providing you the draft report before submitting it to the MRB. Your review of this draft, should focus on its factual correctness. I am asking that you provide your response Ms. Haney, within two weeks of receipt of this letter.
The team will review the response, make any necessary changes to the report, and issue it to the MRB as a proposed final report. We will coordinate with Rill in scheduling the date for the ensuing MRB meeting.
Concurrent with your review of the draft report, we are also providing it to our technical editor for review. This is to inform you that the proposed final report may have subsequent editorial, non-substantive changes in the text.
Attachment:
As stated
\\
g
'0 cc:
R. Caniano, Rlli g qpp[M Cd CONTACT: Cathy Haney, NMSS/IMNS b
(301)415-6825 CP/ PROOFED /MAY a t,1997 p(j V' 0 4 A GgQ
- See previous concurrence DOCUMENT NAME: O RillCOV.cxh
/
X9%#3 OFC IMAB*
IMNS Niled='
NAME CHaney/tsk DCool/PCC fr b
DATE 5/16/e7 s/ a1/e7 5Fle7 OFFICIAL RECORD COPY c2n m p
9706020186 970528 PDR ORG NOMA PDR j
v
.. - = - _
' MEMORANDUM TO: A. B. Be:ch p
Rrgional Administr: tor, Rill
SUBJECT:
DRAFT 1997 REGION lll INTEGRATED MATERIALS PERFORMANCE EVALUATION PROGRAM (IMPEP) REPORT DISTRIBUTION:
NRC Central File IMOB r/f IMNS r/f -
NMSS r/f PDR CHaney KScheider, OSP GDeegan MFederline, DWM i
BBrach, FCSS ETenEyck, FCSS JGreeves, DWM LLessler, FCSS LPerson, DWM EUllrich, RI 5
LBolling, OSP CMattson, Colorado DCollins, Ril DWhite, RI RBangart, OSP JPiccone FCombs TO'Brien, OSP IMOB IMPEP FILE NUDOCS 4
o 3
1 i
I l
i i
a t
u 4
1 i
T h
f g-
---n
--