' "' S AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT l
1 3
NRC-04 96 041
- 2. AMENDMENT / MODIFICATION NO.
- 3. EFFECTIVE DATE
- 4. REQUISITION / PURCHASE REQ. No.
- 5. PROJECT NO.
[,Q3f Five (5) i W 2 7 1997.
RrPA eated 3/27/97
- 6. ISSUED BY CODE l
- 7. ADMINIS1ERED BY CODE I (if other than item 6)
U.S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555
- 8. NAME AND ADDRESS OF CONTRACTOR (No., s:reet, county, State and ZIP code) 9A. AMENDMENT OF SOLICITAllON NO.
Scientech, Inc.
910 Clopper Road Gaithersburg, MD 20878 VB. DATED (SEE ITEM 11)
Principal Investigator / Technical 10A. MODiflCATION OF CONT 9ACT/ ORDER NO.
Contact:
Daniel Prelewicz x
N E- 0M6-0M Phone: (301) 468 6426 i
108. DATED (SEE ITEM 13)
CODE l FACILITY CODE
- 11. THIS 11EM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in item 14 The hour and date specified for receipt of l
Offers O is extended. O is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods: (a) By completing items 8 and 15, tr:d returning copies of the amendmenti (bhByacknowledgingreceiptofthisamendmentoneachcopyofthe offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amenoment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO ThE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change en offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
- 12. ACCOUNilNG AND APPROPRIATION DATA (If required)
C&R 76015122010 JCN W6460 APPN: 31x0200.760 BOC 252A Obligate: $200,000.00
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14 A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT / ORC U IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
I C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INio PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
X Bilateral within-scope change FAR 52.243-2 and mutual agreement of the parties.
E. IMPORTANT: Contractor O is not, @ is required to sign thi= document and return 2
copies to the issuing offlee.
- 14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)
See pages 2-3 for description of modification.
lllllllllllllllllflll'\\\\llflll'l\\\\\\\\ll\\
300047 l
I Except as provided herein, all terms and conditions of the document ref erenced in item 9A or 10A, as heretof ore changed [.remainsunchangedandinfullforceandeffect.
1'5A. NA g$3ggLHFhute or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) l l
Contracts Manager L a sary n. m ee, contracting officer 1$8. CCNTR CTOR/ offer R 15C. DATE SIGNED 168. UNIT [D STATES OF AMERICA g
16C. DATE SIGNED hMignature of contract mg Of ficer)kO M ).h w ML) i AA
_vh
k Sg
[
(signature e'
erson autthrtred to sign) f NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10 83)
O PREVIOUS EDITION UNUSABLE Prescribed by GSA g
FAR (48 CFR) 53.243
. g) i 9706020046 970527
-~
l PDR CONTR l
NRC-04-96-041 PDR
\\ v1 v
b
]
1 Contract No. NRC-04-96-041 Modification No. 5 Page 2 of 3 The purpose of this modification is to (1) increase the ceiling of the contract by $199,998 from 5862,988 to $1,062,986 to accommodate a within-scope change for inclusion of Subtasks 2A and 28 in accordance with the attached statement of work and the Contractor's technical proposal dated April 18,1997, hereby incorporated, (2) provide incremental funding in the amount of $200,000, and (3) incorporate the changed indirect rate structure which is consistent with the rate ceiling establisited at contract award and with the DOE rate agreement (attached).
Accordingly, the contract is modified as follows:
Under Section B.3, " Consideration and Obhgation - Cost Plus Fixed Fee," paragraphs a, e, and f are deleted in their entirety and replaced with the following in lieu thereof:
"a.
The total estimated cost to the Government for full performance of this contract is $1,062,986.00 of which the sum of $1,003,039.00 represents the estimated reimbursable costs and of which $59,947.00 represents the fixed fee.
e.
The amount presently obligated by the Government with respect to this contract is $1,030,000.00.
f.
It is estimated that the amount currently allotted will cover performance through February 12,1998."
Section C, " Statement of Work"is revised to add the effort identified as Subtasks 2A and 2B, as set fodh in the attachment to this modification.
Section G.3, "NRCAR 2052.216-73 Indirect Cost Rates - Alternate 2 (JAN 1993)" is revised to i
read as follows.
"(a) For this contract, the amount reimbursable for indirect costs is as follows:
Cateaorv Rate Base i
Fringe Benefits 35%
Direct labor Fringe Benefits - reduced 12%
Direct " reduced benefits" labor East Overhead - common 27.30 %
Direct and B&P labor plus fringe East Overhead - facilities 18.42%
Direct and B&P labor plus fringe East Region G&A 11.65 %
Total cost input North Overhead - common 29.23 %
Direct and B&P labor plus fringe North Overhead - facilities 12.47 %
Direct and B&P labor plus fringe Nodh G&A 11.51 %
Total cost input FCCM by Fiscal year 1992 193H 1993 200.Q FCCM East
.0047.0036.0025.0014 FCCM Corporate
.0021.0022.0021.0020 i
. 7..,..
.. _. ~
Contract No. NRC-04-96-041 Modification No. 5 Page 3 of 3 (b)
In the event that indirect rates developed by the cognizant audit activity on the basis of actual allowable costs are less than the ceiling rates, the rates d
established by the cognizant audits must apply. The Government may not be obligated to pay any additional amounts for indirect costs above the ceiling rates set forth above for the applicable period."
i A summary of obligations for this contract, from award date through the date of this action, is
}
given below:
4 Total FY96 Obligations:
$780,000.00 l
l Total FY97 Obligations:
250,000.00 Cumulative total of NRC obligations:
51,030,000.00
}
This modification obligates FY97 funds in the amount of $200,000.00 All other terms and conditions of this contract remain unchanged.
1 i
Attachment:
j
- 1. Statement of work i