Text
-_ -. -. _. _
," MAY 23-1997 15:00 DRP 5103375354 P.02/02 k
l UNITED STATES L
,a NUCLEAR REGULATORY COMMISSION i
h ME(dom i
\\**e**
475 ALLENDALE RcAD 80NG op PRU$stA. PENNSYLVANIA 1s4061416 4
1 i
i MEMORANDUM TO:
Hubert J. Miller, Regional Administrator, RI l
l Roy P. Zimmerman j
Associate Director for Projects j
Office of Nuclear Reactor Regulation
[
[f_
FROM:
Charles W. Hehl, Director Division of Reactor Projects, Rt U--
p John A. Zwolinski, Deputy Director,
Division of Reactor Projects 1/Il Office of Nuclear Reactor Regulation i
SUBJECT:
MAINE YANKEE RESTART ACTION PLAN i
Attached is the Maine Yankee Restart Action Plan (RAP) for your review and approval in i
accordance with NRC Inspection Manuel Chapter 0350, " Staff Guidelines for Restart Approval.' The plan is based on the MC 0350 process, however in accordance with j
MC 0350-05.01 some issues were determined to be not applicable to the restart of Maine j
Yankee and were accordingly omitted. This action plan will be maintained and updated by the NRC's Msine Yankee Assessment Panel (MYAP). The MYAP intends to make minor revisions wt'.ttout seeking additional approval; however, if a significant revision is made to the plan, you will be notified and requested to approve the revision.
The RAP contains a list of issues that the NRC will inspect to assess the licensee's compliance with applicable regulatory requirements and conformance with the facility design and licensing bases. Inspection of the items listed will provide the NRC with a base of information necessary to judge whether Maine Yankee has made sufficient progress to support retum to operation. Emergent issues arising during the implementation of the plan may result in issues being added. in such cases, the NRC's Maine Yankee Assessment Panel (MYAP) will revise this plan as appropriate.
The MYAP, in its capaolty as the Maine Yankee Restart Panel, is responsible for the iraplementation of the approved Maine Yankee Restert Action Plan. The implementation of this plan will be closely coordinated with the State of Maine. You will be updated periodically on the status of restart readiness.
Approved by:
4 N- - - -
Hut #rt J. Miller pP merman Docket No. 50-309
Attachment:
Meine Yankee Restart Action Plan 9705300106 970523 PDR ADOCK 05000309 P
PDR TOTAL P.02 C0'd 200'ON.10:91 26.23 f1PH 69ES-170S-102 : 131 NOISIAIG SNWI 3hlN
9
~
l i
l May 23, 1997 MEMORANDUM TO:
Hubert J. Miller, Regional Administrator, RI Roy P. Zimmerman Associate Director for Projects Office of Nuclear Reactor Regulation FROM:
Charles W. Hehl, Director Division of Reactor Projects, RI John A. Zwolinski, Deputy Director Division of Reactor Projects I/ll Office of Nuclear Reactor Regulation
SUBJECT:
MAINE YANKEE RESTART ACTION PLAN 1
Attached is the Maine Yankee Restart Action Plan (RAP) for your review and approval in accordance with NRC Inspecthn Manual Chapter 0350, " Staff Guidelines for Restart l
Approval." The plan is based on the MC 0350 process, however in accordance with MC 0350-05.01 some issues were determined to be not applicable to the restart of Maine Yankee and were accordingly omitted. This action plan will be maintained and updated by the NRC's Maine Yankee Assessment Panel (MYAP). The MYAP intends to make minor revisions without seeking additional approval; however, if a significant revision is made to the plan, you will be notified and requested to approve the revision.
The RAP contains a list of issues that the NRC will inspect to assess the licensee's compliance with applicable regulatory requirements and conformance with the facility design and licensing bases, inspection of the items listed will provide the NRC with a base l
of information necessary to judge whether Maine Yankee has made sufficient progress to support return to operation. Emergent issues arising during the implementation of the plan may result in issues being added in such cases, the NRC's Maine Yankee Assessment l
Panel (MYAP) will revise this plan as appropriate.
1 The MYAP, in its capacity as the Maine Yankee Restart Panel, is responsible for the
~
implementation of the approved Maine Yankee Restart Action Plan. The implementation of l
this plan will be closely coordinated with the State of Maine. You will be updated periodically on the status of restart readiness.
Original Signed By:
Approved by:
Original Signed By:
Curtis J. Cowgil, III for:
[
Hubert J. Miller Roy P. Zimmerman
?
Docket No. 50-309
Attachment:
Maine Yankee Restart Action Plan
_ _ _ _. _ _ _ = _ _.
__.......__.m.-.__.._.
l Memorandum to Hubert J. Miller 2
l and Roy P. Zimmerman Distribution w/att:
Region i Docket Room (with concurrence) l Nuclear Safety Information Center (NSIC)
PUBLIC NRC Resident Inspector H. Miller, RA l
W. Axelson, DRA l~
D. Screnci, PAO C. Cowgill, DRP D. Bearde, DRP Distribution w/att (VIA E-MAIL):
W. Dean, OEDO J. Zwolinski, NRR D. Dorman, PM, NRR l
M. Callahan, OCA R. Correia, NRR F. Talbot, NRR D. Screnci, PAO l
N. Sheehan, PAO inspection Program Branch, NRR (IPAS)
DOCDESK I
I I
l 1
. _ _ -. ~,
~ W Rc 10!*V [ ]N p y r 61 M N TET#01-904J-5359 May 23'97
~13T3d'No.~662 E.0 I
~
Niemorandum to Hubert J. Miller 2
and Roy P. Zimmerman Distribution w/att:
[
Region i Docket Room (with concurrence)
Nucisar Safety information Center (NSIC)
PUBLIC NRC Resident inspector H. Miller, RA W. Axelson, DRA D. Scronci, PAO C. Cowgill, DRP l
D. Bearde, DRP l
l l
Distrbution w/stt (VIA E-MAIL):
(
W. Dean, OEDO J. Zwolinski, NRR l
O. Dormen, PM, NMR j
M. Callahen, OCA l
R. Correia, NRR F. Talbot, NRR D. Serenci, PAO l
N. Sheehan, PA0 Inspection Program Branch, NRR (IPAS)
DOCDESK I
n a
DOCUMENT NAME: G:\\ BRANCH 5\\MYRAP.RV1 e.
c.
. co m.-= u --
OFFICE Rl/QA A
/NRR @
/NRR f@
/NRR_f]
[_
NAME
,RHg)A5Udb
- JZWOUNSG, RZIMMERMAN SCOLI,WS DATE 0 5/ # 7 054,'997 05D397 05f//97 l
OFFICIAL RECORD COPY l
l TOTAL P.02
[
m i
Memorandum to Hubert J. Miller 2
l and Roy P. Zimmerman 1
i Distribution w/att:
l Region i Docket Room (with concurrence)
Nuclear Safety Information Center (NSIC) l PUBLIC NRC Resident inspector H. Miller, RA W. Axelson, DRA D. Screnci, PAO C. Cowgill, DRP D. Bearde, DRP Distribution w/att (VIA E-MAIL):
W. Dean, OEDO J. Zwolinski, NRR D. Dorman, PM, NRR M. Callahan, OCA l
R. Correia, NRR l
F. Talbot, NRR D. Screnci, PAO I
N. Sheehan, PAO Inspection Program Branch, NRR (IPAS) l DOCDESK l
t I
I r
l DOCUMENT NAME: G:\\ BRANCH 5\\MYRAP.RV1 Ta receive e copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/QA f
/NRR
/NRR
/NRR l
NAME HJ%IJ.JEff/db JZWOLINSKI RZIMMERMAN SCOLLINS DATE OS/g7 05/ /97 05/ /97
. 05/ /97 OFFICIAL RECORD COPY l
l