ML20148C838
| ML20148C838 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/26/1997 |
| From: | Grigg R WISCONSIN ELECTRIC POWER CO. |
| To: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19317C295 | List: |
| References | |
| NUDOCS 9705290172 | |
| Download: ML20148C838 (2) | |
Text
M WISCONSIN VV
'Electnc aics^ao a.caico/eResioent &
POWER COMPANY CHIEF OPERATING OFFICER CHIEF NUCLEAR OFFICER 234 w u.c% pc% 20% %.w 53201 (414) 221-21 @
March 26,1997 PRIORITY Rot TWG first RA RC ORA EfC Mr. John A. Grobe l
f/ N pRP f[")
SGA J
08 Deputy Director, Division of Reactor Projects DWS PO Nuclear Regulatory Commission, Region III 801 Warrenville Road Lisle, IL 60532-4351 RLE--GHS LQ.Q
Dear Mr. Grobe:
Enclosed for your information is Revision 0 of Wisconsin Electric's Plan for Achievement of Operational Excellence. The " Introduction and Overview" Section on pages 3-4 provides a concise summary of our near-term focus.
/
This plan has been discussed with Nuclear Power Business Unit personnel and is intended
(
to be a living document as we work toward operational excellence at Point Beach. Any feedback you might have on this document would, of course, be welcome.
Sincerely, Y
cc: Resident Inspector Enclosure f
000040 S c is l
9705290172 970326 FDR ADOCK 05000266 P
\\
'gv Ul.l!lll.ll!ll.l!ll.llll.ill!I.ll!!.El.li l
LWI27tm l
A m w uha m ar ra e c e w a