ML20148C619

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900403/87-06 on 871109-12.Insp Conducted as Followup to NRC Insp Rept 99900403/86-01,in Response to Gap 851005 Ltr to NRC Re Alleged Deficiencies in Design Control Activities within QA at Ref GE Facility
Date released: 06/10/2020 Download: ML20148C619


Insp Rept 99900403/87-06 on 871109-12.No Violations/ Nonconformances or Unresolved Items Noted.Major Areas Inspected:Allegations Involving Potential Deficiencies in Design Control Activities within QA Program
ML20148C653
Person / Time
Issue date: 03/26/1988
From: Robert Pettis, Potopovs U
Office of Nuclear Reactor Regulation
To:
References
REF-QA-99900403
Download: ML20148C653 (39)
Forwards Insp Rept 99900403/87-06 on 871109-12.Insp Conducted as Followup to NRC Insp Rept 99900403/86-01,in Response to Gap 851005 Ltr to NRC Re Alleged Deficiencies in Design Control Activities within QA at Ref GE Facility
ML20148C614
Person / Time
Site: Perry 
Issue date: 03/02/1988
From: Stone J
Office of Nuclear Reactor Regulation
To: WOLFE B
GENERAL ELECTRIC CO.
References
CON-#189-8129, REF-QA-99900403
Download: ML20148C614 (4)