ML20148C583

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 99901094/87-01
ML20148C583
Person / Time
Issue date: 01/22/1988
From: Stone J
Office of Nuclear Reactor Regulation
To: Satin J
SATIN AMERICAN CORP.
References
REF-QA-99901094 NUDOCS 8801250218
Download: ML20148C583 (2)


Text

3 Janu.aMt 22, 1988 Docket No. 99901094/87-01 Satin American Corporation ATTN: Mr. Joseph Satin President Post Office Box 619 40 Oliver Terrace Shelton, Connecticut 06484 Gentlemen:

Thank you for your letter of Ser' ember 16, 1987, in response to our letter dated September 8, 1987. We have reviewed your reply and find it responsive to the concerns raised on our Notice of Violation. We will review the implemen-tation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Please feel free to contact us when necessary to help resolve future problems that may develop.

Sincerely, gy b 4 James C. Stone Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation-DISTRIBUTION:

? RIDS Code IE:09 4 VIB Reading DRIS Reading JPartlow BGrimes JStone UPotapovs JJacobson 1 0 0FC :VIB:0RIS

5C/VIB:

IS

AC/VIB:DRf:

...:... 5

....:......g.__:______.....:.........__:......._____.........

NAME :JJacob.

tt :UPota' s

JStone

.....:.__.........:..h.....__:....___..___...................................

\\ D.k88
\\/

88 DATE :/ /h /

s B801250218 880122 PDR OA999 EMVJSAT DCD

,99901094

2 a

Janwvtri 22, 1988 Docket No. 99901094/87-01 Satin American Corporation ATTN: Mr. Joseph Satin President Post Office Box 619 40 Oliver Terrace Shelton, Connecticut 06484 Gentlemen:

Thank you for your letter of September 16, 1987, in response to our letter dated September 8, 1987. We have reviewed your reply and find it responsive to the concerns raised on our Notice of Violation. We will review the implemen.

tation of your corrective actions during a future inspection to detennine that full compliance has been achieved and will be maintained.

Please feel free to contact us when necessary to help resolve future problems that may develop.

i i

Sincerely, y b. A

~

James C. Stone, Acting Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation

.3 DISTRIBUTION:

RIDS Code IE:09 VIB Reading DRIS Reading i

JPartlow BGrimes JStone l

UPotapovs JJacobson a

OFC :VIB:DRI

50/VIB:

IS :AC/VIB:DR W :

....:......gj0..:.........................:............:.........

NAME :JJacob tt :UPot s

JStone

.....:............:....h........:...k.......................................................

\\ /l 88
\\/

88 DATE :1 /4 /

r I