Mod 7,revising Delivery & Installation Completion Schedules for Floors 14 & 17 of One White Flint North & to Add 18th Floor to List of Floors to Be Completed on Accelerated Schedule,To Demountable Wall Sys for NRC Consolidation
ML20148C421
Person / Time
Issue date: 03/11/1988
From: Aikens H, Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), TRANSWALL CORP.
To:
Shared Package
ML20148C376 List:
References
CON-NRC-10-87-203 NUDOCS 8803220382
Download: ML20148C421 (2)


Text

    • Dy
1. CON T RAC T 40 COOT.

PAGEMF PAGLs y,

AMENDMENT OF Sol.lCITATION/ MODIFICATION OF CONTRACT-1 l 2{,

2. AMt.NOMENT/MOOaFICAT4ON Peo..
3. EFFECT4VE DATC
4. REQUISITION / PURCHASE REQ. NO.
5. PROJECT NO. (t/ eppidea6le) l' Seven-(7)

"12/21/87 ARM-87-203 dated 11/10/87, 12/9/87 and 1719/88 6.455U00 SY

7. ADMIN 15T E R EO OY (t/ other sh.g diem 6) l U.S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555 Ea1AMC AND ADORE 55 OF CONTRACTOR (No. street. county. St.se end ZIP Code)

(g) 9A. AMENOMENT OF SOLICsT ATION NO.

Transwall Corporation 143 Pennsylvania Avenue so. DAT EO rsss ersu s s, Malvern PA 19355-2491 toA.

OlFICATION OF CON T R ACT/OR DER NRC-10-87-203 loo. DATED (SEE ITsM 23)

COOE l FACILITY CODE 4/15/87-

- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICITATIONS T

v,. s.nd he abow numbered solicitation is amended as set forth in isom 14. The hour hnd date specified for receipt of Offers,

is extended, is not en.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following rnethods:

( ) By compieting Items 8 and 15.and returning copies of tfie amendment: (b) By acknowledging receipt of this e. wnwe6t on nach copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendrnent numbers. FAILURE OF YOUR ACKNOWLEDG.

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FORTHE RECEIPT OF OFFERS PRIOR TO THE HOUR ANO DATE SPECIFIED MAY RESUL IN REJECTION OF YOUR OFFER. If by virtue of this amendtrent you desire to change an offer already submitted.such change may be mMe by telegram or letter, provided each telegram or letter makes reference tn the solicitation and this amertiment, and is received prior to the opening hour and date specified.

12. ACCOUNTING ANO APPROPRIATION DATA (if,veuered)

APPN 31X0200.408 B&R No. 40-20-10-26-0 Obligated :

$5,525.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS.

IT MODIFIES THE CONTRACT / ORDER NO_. AS DESCRIBED IN ITEM 14.

g A. THIS CHANGC ORDER 15 ISSUED PURSUANT Tor (Specify authority) THE CHANGES SET FORTH 4N ITEM 14 ARE MADE IN 1HE CONS ed TR ACT ORDER NO. IN ITEM loa.

8. ThC AB.OVE N.UMBEREO CONTR ACT/ ORDER 45 MO' tFIED TO REFLECT THE ADMINtSTR ATtVE CHANGES (such es ch.ates in p.ying of/sce, O

appropri tfom d fe, etc.J 5ET FORTH QN ITEM 14; PURSUANT TO THE AUTHORITY OF F AR 43.lo3(c).

C. THIS SUPPLEMENT AL AGREEMENT IS ENTERCO INTO PURSUANT TO AUTHORtJ Y OF:

X "Changes" Clause and mutual agreement.

O. O T HeR (spec.ty aype or mod.i.c.<,.

.i.4..asorisys E. IMPO RTANT: Contractor is not. b is required to sign this document and return 3

Cop;es to the issuing Of fice.

Tr6ESCRieTiON 0: AMENOMENT/MVOtf IC AT ION (Ortenhed by Ucf ecerwn headsats, ancl.dmt eohear.fsoccon tracs setweet an.trer whew /emi6kJ SEE PAGE TWO 8503220382 8B0311 PDR CONTR NRC-10-87-CO3 PDR g,.g.,Li e n...

..n i.,,n.. e.

e.no....

e aco....,.oc.. io n.., A o, i o A,..,,,,.i........

,.e...... uoco. e.e.

in ton ton.

IS A. N AME AND TI TLE OF 58GNER (Type or priatt 16 A. N AME AND T O T LE OF CONT R AC TING Of F ICER (TFPe or prtet)

_mS.

-g Elois J. Wiggins b

M i

4 NT6 H

  1. H J

3 K OA T E MG N LU_.4 6 tl. UNI ' STA S OF t.ME HIC A 16C_ OA1E 5tG N L O k-%,W..

, pe,,o

.....~.L.,..%...,

,S.....J.,d4%,.,,

li sr L

UY re vv NSN 754o41152 toFo 30105 S TANDARf) FORM 30 (REV. lo-8 3)

PLEVIOUS EDITION UNUSAOLE 59.sc,ebee by G5 A

.. rf i' 4

NRC-10-87-203 Modification No. 7 Page 2 The purpose of this modification is to revise the delivery and installation completion schedules-for floors 14 and 17 of " One White Flint North", and to add the 18th floor to the list of floors to be completed on the accelerated installation schedule.

The following changes are applicable.

A.LParagraph'.B.2.B.5 - Acceleration Effort Price Listi the total estimated-price for the accelerated effort is-increased by $5,525.OO.from $55,960.50 to $61,485.50, as the result of the addition of the 18th floor.

B.

The total estimated prices for the Aggglgcatgd_Efigtt and the contract ceiling, are changed to the following amounks:

Estimated Accelerated Effort

$61,485.50 Estimated Contract Ceiling.........~.... $1,532',385.10 C.

Paragraph C.1.2 Sqggg_gi_Wgth_ _Agggletatgd_Efigtt, the Statement of Work is modif.ied to add the 18th floor and to change the delivery and completion dates for the 14th and 17th floor, as follows:

Floor No.

Revised Delivery Date Revised Completion Date Et9m 19 Et9s 19 14 10/19/87 12/21/87 11/2/87 1/6/88 17 12/16/87 2/3/88 1/11/88 2/24/88 18 1/4/88 1/18/88 1/22/88 2/17/88 E.

All other terms and conditions of the contract remain unchanged.