e PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHI A, PA 19101 (zis) sai soot V CE RE I NT NUCLEAR S E R VIC E S February 26, 1988 Docket Nos. 50-277 50-278 Mr. Thomas T. Martin, Director Division of Radiation Safety and Safeguards Region I U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTN:
Document Control Desk
Subject:
Response to Peach Bottom Inspection Report No. 50-277/87-37 and 50-278/87-37
Dear Mr. Martin:
l Your letter dated January 22, 1988 forwarded the subject Inspection Report for Peach Bottom Units 2 and 3 and required a i
l response by February 22, 1988.
On February 22, 1988, W. C.
Birely of Philadelphia Electric Company discussed with Mr. J.
Linville of Region I, NRC the need for an additional four days to complate this response.
Appendix A of your letter l
identified two activities which did not appear to comply with l
the Commission's regulations.
These apparent violations are restated below, followed by Philadelphia Electric Company's response.
In accordance with Section 2.790 and Section 73.21 of the Commission's regulations, it is hereby requested that this response be withheld from public disclosure.
An affidavit to support this request is attached.
t THE REMAINDER OF PAGE #1, HAS INTENTIONALLY BEEN LEFT BLANK IN THIS COPY, BECAUSE IT CONTAINS SAFEGUARDS INFORMATION.
?
l
/ 8803220318 880311 N'
l
/
PDA ADOCK 05000277 y
c.m
Mr. Th: mas T. Martin, Dircctor Fcbruary 26, 1988 Page 2 of 5 a
THIS PAGE #2 HAS INTENTIONALLY BEEN LEFT BLANK IN THIS i
COPY, BECAUSE IT CONTAINS SAFEGUARDS INFORMATION.
I l
i a
6 L
i l
l b
i er---------
~
'Mr. Th mas T. Martin, Director; Fobruary 26, 1988 Page 3 of 5 s
THIS PAGE #3 HAS INTENTIONALLY BEEN LEFT BLANK IN THIS COPY, BECAUSE IT CONTAINS SAFEGUARDS INFORMATION.
,c,----
,7--
, -,.,,., ~ -,,.-,__,,....,,. _.,,
- Mr. Thomas T. Martin, Director February 26, 1988
'~
Page 4 of 5 i
s l
l THIS PAGE #4 HAS INTENTIONALLY BEEN LEFT BLANK IN THIS
~
COPY, BECAUSE IT CONTAINS SAFEGUARDS INFORMATION.
'Mr. Thomas T. Martin, Dircctor February 26, 1988 Page 5 of 5 A PORTION OF THIS PAGE HAS INTENTIONALLY BEEN LEFT BLANK IN THIS COPY, BECAUSE IT CONTAINS SAFEGUARDS INFORMATION.
If you have any questions or require additional information, do not hesitate to contact us.
Very truly yours, cc:
Addressee W.
T.
Russell, Administrator, Region I, NRC T.
P.
Johnson, NRC Resident Inspector i
l l
l l
4 C0hMONWEALTH OF PENNSYLVANIA ss.
COUNIY OF PHILADELPHIA J. W. Gallagher, being first duly sworn, deposes and states that:
1.
He is Vice President of Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2 6 3 and is authorized to execute this affidavit; 2.
He has reviewed Licensee's Response to Inspection Report Nos.
50-277/87-37 and 50-278/87-37 filed herewith (hereinaf ter the "Response") and knows the contents thereof.
3.
The Response which is sought to be withheld from public disclosure contains details relating to the physical security plans for Peach Bottcm Atomic Power Station; 4.
The infomation set forth in the Response has been treated as confidential and proprietary infomation and has been withheld fom public disclosure by Licensee in accordance with Licensee's practice of treating all infomation dealing with the detaila of security plans as -nnfidential and proprietary ir.fomation, and; l-
m 5.
The Response should be considered by the NRC as confidential and proprietary infomation and be withheld from public disclosure on the grounds that it contains Safeguards Infomation, it contains details relating to the h
physical security plans of a licensed facility, it contains detailed infomation which could be used to compromise the safety and security of the
- facility, such disclosure is not required in public interest and such disclosure would adversely affect the interests of Philadelphia Electric Company.
NWA UVice Presfdent Subscribed and sworn to before me this M day of February,1988, do Y4 /SMd4'
- g. NotarfPuT)1ic ANNTN Y.FRANKUN Neenry PuMic. Phits., Ptnis. Co.
asy conne mien s,va,My 28, t est
. _ _ -.