i May 7, 1997 i
Mr. Ted C. Feigenbaum Executive Vice President and Chief Nuclear Officer Northeast Utilities Service Company c/o Mr. Terry L. Harpster i
P.O. Box 270 Hartford, CT 06141-0270 i
}
SUBJECT:
PLANT PERFORMANCE REVIEW (PPR) - SEABROOK On March 24,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Seabrook. The staff conducts them reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPH for Seabrook involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period September 1,1996 to March 15,1997.-
PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.
This letter advises you of our planned inspection effort resulting from the Seabrook PPR review. It is provided to minimize the resource impact on your staff and to allow for
. scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 12 months. The rationale or basis for each inspection 'outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspection are not listed due to their ongoing and continuous nature.
We willinform you of assy changes to the inspection plan. If you have any questions, please contact the new Branch 8 Chief, Richard J. Conte, after May 12,1997 at (610) 337-5183.
Sincerely, Original Signed By:
' John F. Rogge, Chief Reactor Projects Branch 8 Division of Reactor Projects Docket Nos. 50-443
Enclosure:
Inspection Plan
/
I 150011 Il!!lll!IOI!IIllI!Ill f.bi 9705150165 970507 PDR ADOCK 050004 C
_ O PDR l_
1 o
k i
Mr. Ted C. Feigenbaum 2
I cc w/ encl:
B. Kenyon, President and CEO - Nuclear Group D. Goebel Vice President - Nuclear Oversight j
J. Thayer, Vice President - Nuclear Engineering & Support Recovery Officer i
F. Rothen, Vice President - Work Services W. DiProfio, Nuclear Unit Director - Seabrook Station L. Cuoco, Senior Nuclear Counsel i
A. Callendrello, Licensing Manager - Seabrook Station H. Haynes, Director - Nuclear Training R. Hickok, Nuclear Training Manager - Seabrook Station W. Meinert, Nuclear Engineer j
D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass.
4 R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire j
S. Chol, Director, Nuclear Safety, Massachusetts Emergency l
Management Agency F. Getman, Jr., Vice President and General Counsel-Great Bay Power Corporation Commonwealth of Massachusetts, SLO Designee R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts Seacoast Anti-Pollution League State of New Hampshire, SLO D. Tofft, Administrator, Bureau of Radiological Health, State of New Hampshire i
S. Comley, Executive Director, We the People of the United States
4 e
e 6
i Mr. Ted C. Feigenbaum 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
PUBLIC NRC Resident inspector DRS Director, Region i DRS Deputy Director, Region 1 DRS Branch Chiefs, Region i 3
DRP Director, Region 1 DRP Deputy Director, Region i DRP Branch Chiefs, Region 1 E. Conner, DRP M. Oprendek, DRP C. O'Daniell, DRP g
s Distribution w/enci (VIA E-MAIL):
1 W. Dean, OEDO P. Milano, PD l-3, NRR A. DeAgazio, PD l-3, NRR R. Correia, NRR j
D. Taylor, NRR M. Callahan, OCA Inspection Prograra Branch, NRR (IPAS)
{
l 4
DOCUMENT NAME: G:\\ BRANCH 8\\PPR\\SBPPRLTR.597 To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP l
1 Rl/DRP l
l q
NAME EConner PJC JRogge (M DATE 5/7/97 5/7/97 OpFICIAL RECORD COPY
t Enclosure SEABROOK SPECIAL INSPECTION PLAN INSPECTION '
iTITLE/ PROGRAM AREA iDATES.
COMMENTS ;
IP 737531 Inservice Inspection 5/19/97 Core inspection.
IP 83750-2 Occupational Radiation Exposure 5/19/97 Core inspection.
1 pera nel a us of Emergemy IP 82701-1 7/14/97 Core inspection.
j Preparedness Program Reg IP 81046-1 Locks, Keys, and Combinations 7/11/97 c tc l nt pet 8
IP 822051 Shift Staffing and Augmentation 7/14/97 rIc ga ao Effectiveness of Licensee Controls in lP 40500-1 identifying, Resolving, and Preventing 8/25/97 Core inspection.
Problems IP 37550 2 Engineering 9/15/97 Core inspection.
IP 37550-3 Engineering 9/29/97 Core inspection.
S lid Radioactive Waste Mana0ement and IP 86750-1 10/6/97 Core inspection.
Transportation of Radioactive Materials 8'I
.Tl 2515/133 49 CFR Parts 100-179 and 10 CFR Part 71 10/6/97 an on ch s.
- "**d Opator Re@aEcadon Rogram Evaluation 11/10/97 Core inspection.
Meal Secudty Prograrn for Power IP 81700 2 Reactors 11/17/97 Core inspection.
at e o wup on IP 64704-1 Fire Protection Program 12/8/97 Notes:
IP Inspection Procedure Tl Temporary instruction Core Minimum NRC Inspection Program (mandatory for all plants)
-