TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 SN 1578 Lookout Place MAR 171988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

P.0555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - UNITS 1 AND 2 - NRC INSPECTION REPORT NOS. 50-327/87-52 AND 50-328/87-52, SQN ESSENTIAL RAW COOLING WATER (ERCW)

SYSTEM AS-BUILT VERIFICATION INSPECTION - REVISED VIOLATION RESPONSE Stewart D. Ebneter's letter to S. A. White dated September 25, 1987, transmitted Inspection Report 87-52. 'TVA responded to this inspection report with a letter from R. L. Gridley to NRC dated November 10, 1987.

In TVA's response to violation 87-52-01, we committed to the following:

... an instrument engineering requirements specification will be issued requiring valves be tagged and identified on engineering output drawings.

Implementation of this specification is expected by March 15'~1988."

The preparation and approval of an engineering specification have required significant coordination among the Division of Nuclear Engineering, Division of Nuclear Construction, and the operators to resolve conflicts and produce a procedure that can be effectively and efficiently implemented by all affected organizations.

The instrument engineering requirements specification was approved and issued on March 2, 1988.

Site procedures are being revised to fully implement the specification, and t

full implementation of the above commitment will be in effect by May 29, 1988.

The commitment made in this submittal is stated on the enclosure.

i l

Very truly yours, TENNESSEE VALLEY AUTHORITY AN

/

R.

ridley, Direc r et Nuclear Licensing and 0g Regulatory Affairs I \\

Enclosure cc: See page 2 8803220195 880317 PDH ADOCK 0500 7

An Equal Opportunity Employer

s-.

U.S. Nuclear Ragulatory Commission hillR 17-1988 cc (Enclosure):

Mr. K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. G. G. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379

ENCLOSURE Revised Commitments for SON 1.

The instrument engineering requirements specification was approved and issued on March 2, 1988. Because of this delay in issuing the instrument engineering requirements specification and the large number of site procedures still requiring revision to fully implement the specification, full implementation of the above cosmitment is not expected until May 29, 1988.