Advises of NRC Planned Insp Effort for Next 8 Months at Facility.Semiannual Plant Performance Review Involves Participation of Technical Div in Evaluation Insp Results & Safety Performance for Period Oct 1996-Mar 1997
ML20148B568
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
References
NUDOCS 9705130144
Download: ML20148B568 (5)


Text

.. _ _ ~ _._.

3

, p t**"'G'>i, UNITED STATES j

t. . NUCLEAR REGULATORY COMM10 TON l
- .,;  ; 1

{yi REGION IV l D, f 611 RYAN PLAZA DRIVE SUITE 400 h'**/

AR LINGTON. T E X AS 76011 8064 MAY - 5 1997 Otto L. Maynard, President and l Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 j

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW -

WOLF CREEK GENERATING STATION

Dear Mr. Maynard:

On March 26,1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Wolf Creek Generating Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Wolf Creek Generating Station involved the participation of all technical divisions in evaluating inspection results and safety 1 performance information for the period October 1996 through March 1997. SPPRs provide I NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

Although no additional inspections were planned as a result of this SPPR, the level of required inspection at Wolf Creek Generating Station will be further evaluated based on the SALP which ended April 5,1997. This letter advises you of our current planned inspection effort for the next 8 months at the Wolf Creek Generating Station. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan, if you have any questions, please contact W. D Johnson at (817) 860-8148.

Sincerely, f

/

u )

)

Thomas P. Gwynn, Di ect r l Division of Reactor Pr ts 9705130144 970505 PDR ADOCK 05000482 G PDR ir$ p ll.. ll I.lli Illllll. I.Ill 1

Wolf Creek Nuclear Operating Corporation Docket Nos.: 50-482 License Nos.: NPF-42

Enclosure:

Inspection Plan .

cc w/ enclosure:

Chief Operating Officer Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, Kansas 66839 Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge I 2300 N Street, NW

Washington, D.C. 20037 l

Supervisor Licensmg Wolf Creek Nuclear Operating Corp. l P.O. Box 411 l Burlington, Kansas 66839 l Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Rd.

Topeka, Kansas 66604-40T.7 Office of the Governor State of Kansas Topeka, Kansas 66612 Attorney General Judicial Center 301 S.W.10th 2nd Floor Topeka, Kansas 66612-1597 County Clerk Coffey County Courthouse Burlington, Kansas 66839-1798

. - - - ~ _. - _ _ _ -

?

^

Wolf Creek Nuclear Operating . Corporation a

Vick L. Cooper, Chief

Radiation Control Program i

Kansas Department of Health and Environment Bureau of Air and Radiation Forbes Field Building 283 Topeka, Kansas 66620 Mr. Frank Moussa Division of Emergency Preparedness 2800 SW Topeka Blvd Topeka, Kansas 66611-1287 l

l j

l l

l l

1 l

l A .J

.. _ . _ _ ~ . - . _ . _ . . - . . - _-. - . . .. . . - . . -

5 4

1

  • \

9 Wolf Creek Nuclear Operating '

Corporation MAY - 51997

\

i j bec to DCD (IE01) l-

! bec distrib, by RIV:

l Regional Administrator Resident inspector )

t DRP Director SRI (Callaway, RIV)

!- Branch Chief (DRP/B) DRS-PSB

Project Engineer (DRP/B) MIS System l
Branch Chief (DRP/TSS) RIV File

)

i 4

i l

l i

.i To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy wdh enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B D:DRS/ D:DRP p ,

DNGraves;df

  • WDJohnson
  • ATH64()ll TPGvyynn ( // y V

4/11/97 4/11/97 A/ ( /97 f/f /97 V

  • previously concurred OFFICIAL RECORD COPY s j

-.- . . - . . . - . . ~ . .- .. .

o _

Wolf Creek Nuclear Operating Corporation MAY - 51997 l bec to DCD (IE01) J bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director SRI (Callaway, RIV) 1 Branch Chief (DRP/B) DRS-PSB Project Engineer (DRP/8) MIS System Branch Chief (DRP/TSS) RIV File 1

l 1

To receive copy of document, indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B D:DRS/ D:DRP p ,

DNGraves;df' WDJohnson* ATH4Q)li TPGvyynn ( //f 4/11/97 4/11/97 Af ( /97 f/f /97

'previously concurred OFFICIAL RECORD COPY

(

ENCLOSURE WOLF CREEK GENERATING STATION INSPECTION PLAN IP - Inspection Procedure TI - Tw.purary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 71001 Licensed Operator 3 08/11-14/97 Core inspection Requalification Program Evaluation IP 73753 Inservice Inspection 3 09/22-26/97 Core Inspection IP 81700 Physical Security Program 1 09/22-26/97 Core inspection IP 84750 Radioactive Waste Treatment 1 09/22-26/97 Core inspection and Effluent and Environmental Mon!toring IP 62706 Maintenance Rule Baseline 7 10/27-31/97 Required by NRR Program Office (Regional Team) i