Advises Util of NRC Planned Insp Effort Resulting from Waterford 3 Semiannual Plant Performance Review Completed on 970325.Details of Insp Plan for Next 8 Months Encl
ML20148B562
Person / Time
Site: Waterford 
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9705130139
Download: ML20148B562 (6)


Text

.. -.

~ _ -.-._ _ _...~.-. ~.. _.m i.

  1. "%q UNtTED STATES 8

I*

t.;

NUCLEAR REGULATORY COMMISSION l

I*

REGloN IV

\\

- g

.o 5,

f*

f 611 RY AN PLAZA DRIVE, SUITE 400

  1. 'l 8

AR LINGTON, T E XAS 76011-8064 9 " * *

  • MAY - 51997 i

Charles M. Dugger, Vice President Operations - Waterford 3

.}

Entergy Operations, Inc.

P.O. Box B Killona

  • uisiana 70066

^

SUtsJECT: SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- WATERFORD 3 4

i-

Dear Mr. Dugger:

1 On March 25,1997, the NRC staff completed the SPPR of Waterford 3. The staff l

conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources, The SPPR for Waterford 3 involved the participation of all technical divisions in evaluating inspection results and safety performance information for the peried October 1993 through March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior j

Management Meeting reviews.

i i

This letter advises you of our planned inspection effort resulting from the Waterford 3 SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite.. The enclosure details our inspection plan for the next 8 months. The rationale or 4

basis for each inspection outside the core inspection program is provided such that you are l

aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

i We willinform you of any changes to the inspection plan, if you have any questions, i

please contact Phil Harrell at (817) 860-8250, i

j Sincerel,

s s

Thomas P. Gwyn, Dir ctor l

Division of React P jects Docket Nos.: 50-382 License Nos.: NPF-38 1

Enclosure:

{}

Inspection Plan l

lll[~lk h 9705130139 970505 PDR.ADOCK 05000382 G

PDR

~.-

=.

1 4

Entergy Operations, Inc.

2-i i

j cc w/ enclosure:

Executive Vice President and i

Chief Operating Officer Entergy Operations, Inc.

l P.O. Box 31995 i

Jackson, Mississippi 39286-1995 4

Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

1 P.O. Box B

{

Killona, Louisiana 70066 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louis.ana 70825-1697 Director, Nuclear Safety &

Regulatory Affaira Waterford 3 SFS Entergy Operations, Inc.

P.O. Box B Killona, Louisiaria 70066 William H. Spell, Administrator Louisiana P,diation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135

Entergy Operations, Inc. i Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 i

e

~4-MAY - 51997 bec to DCD (l001) l bec distrib, by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D)

MIS System Project Engineer (DRP/D)

RIV File Branch Chief (DRP/TSS)

DOCUMENT NAME: G:\\DRPDIR\\SPPR\\WAT.LTR To receive copy of document, Indicate in box: "C" = Copy withoty' enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D

,l C:DRP/D

,llfD:DRSj l D:DRP J

GAPick;cmM PHHaff AT,Hol// ell TPG,wynn V/,/

04/g ;/97 04/9)797 0%

/97 04/ { /97 4

l OFFICIAL RECORD COPY l

l

. MAY - 5 1997

~

bec to DCD (IEQ) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D)

MIS System Project Engineer (DRP/D)

RIV File Branch Chief (DRP/TSS) l i

DOCUMENT NAME: G:\\DRPDIR\\SPPR\\WAT.LTR To receive copy of document. Indicate in box: "C" = Copy withotf enclosures "E" = Copy with enclosures "N" = No copy PE:DRP!D C:DRP/D

,[Q/D:DRSj(

D:DRP g

l GAPick;cm%'

PHHa g AT_Hof#cti TPG,wynn V/,/

04/6 /97 04/917%7 Of*f

/97 04/{/97 OFFICIAL R ECOT3D COPY

ENCLOSURE WATERFORD 3 INSPECTION PLAN 1

IP - Inspection Procedure Ti - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

TITLE /

NUMBER OF DATES TYPE OF INSPECTION / COMMENTS INSPECTION PROGRAM AREA INSPECTORS IP 73753 lNSERVICE INSPECTION 1

04/21-25/97 CORE INSPECTION IP 92903 ENGINEERING FOLLOWUP 1

04/21-25/97 REGIONAL INITIATIVE - APP. R, RCP OIL FILL SYSTEM IP 92903 SSFl FOLLOWUP 1

04/28-05/02/97 REGIONAL INITIATIVE - SSFI FOLLOWUP OR UNRESOLVED ITEMS IP 92902 MAINTENANCE FOLLOWUP 1

08/25-29/97 REGIONAL lNITIATIVE IST FOLLOWUP IP 83750 OCCUPATIONAL RAD;ATION EXPOSURE 2

09/15-19/97 CORE INSPECTION IP 37550 ENGINEERING 4

09/15-19/97 CORE INSPECTION 09/29-10/03/97 Tl MALEVOLENT USE OF VEHICLES AT 1

09/22-26/97 HEADQUARTERS INITIATIVE 2515/132 NUCLEAR POWER PLANTS IP 71001 OPERATOR REQUAUFICATION PROGRAM 2

09/29-10/03/97 CORE INSPECTION EVALUATION IP 82301 EVALUATION OF EXERCISES FOR POWER 5

11/03-07/97 CORE INSPECTION REACTORS j

-