Advises Util of NRC Planned Insp Effort Resulting from Waterford 3 Semiannual Plant Performance Review Completed on 970325.Details of Insp Plan for Next 8 Months Encl
ML20148B562
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9705130139
Download: ML20148B562 (6)


Text

. . - . ~ _ - .-._ _ _ . ..~.- . ~ . . _ .m . - _ _ _ _ , _ . _ . _ _ _ . . _ . _ . . . _ . . __ . - _ _ . . _

i. ,
  1. 8"%q UNtTED STATES t.; I*, NUCLEAR REGULATORY COMMISSION l
  • , I* REGloN IV

\

.o - g 5, f* f 611 RY AN PLAZA DRIVE, SUITE 400

  1. 'l 9 8 AR LINGTON, T E XAS 76011-8064 MAY - 51997 i

! Charles M. Dugger, Vice President Operations - Waterford 3

.} Entergy Operations, Inc.

P.O. Box B

Killona
  • uisiana 70066

^

4 SUtsJECT: SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- WATERFORD 3 i-

Dear Mr. Dugger:

1

! On March 25,1997, the NRC staff completed the SPPR of Waterford 3. The staff l conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to

! facilitate planning and allocation of inspection resources, The SPPR for Waterford 3

! involved the participation of all technical divisions in evaluating inspection results and safety performance information for the peried October 1993 through March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior j Management Meeting reviews.

i i

This letter advises you of our planned inspection effort resulting from the Waterford 3 SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

! onsite.. The enclosure details our inspection plan for the next 8 months. The rationale or 4 basis for each inspection outside the core inspection program is provided such that you are l l aware of the reason for emphasis in these program areas. Resident inspections are not  ;

listed due to their ongoing and continuous nature.  ;

i  :

! We willinform you of any changes to the inspection plan, if you have any questions, i please contact Phil Harrell at (817) 860-8250, i

j Sincerel ,

s s Thomas P. Gwyn , Dir ctor l '

Division of React P jects Docket Nos.: 50-382 License Nos.: NPF-38 1

Enclosure:

Inspection Plan l {}  !

9705130139 970505 PDR .ADOCK 05000382 lll[~lk h * *,

-- . . - . .- - ... - ~ .- - - - . =. -..

l l

4 1 Entergy Operations, Inc. 2-i i

j cc w/ enclosure:

Executive Vice President and i Chief Operating Officer

Entergy Operations, Inc.

l P.O. Box 31995 i

. Jackson, Mississippi 39286-1995 4

!' Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995

. Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc. 1 P.O. Box B {

Killona, Louisiana 70066 '

Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Chairman Louisiana Public Service Commission  ;

One American Place, Suite 1630 '

Baton Rouge, Louis.ana 70825-1697 Director, Nuclear Safety &

Regulatory Affaira Waterford 3 SFS Entergy Operations, Inc.

P.O. Box B Killona, Louisiaria 70066 William H. Spell, Administrator Louisiana P,diation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l

1

Entergy Operations, Inc. i l

Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 70057 Mr. William A. Cross Bethesda Licensing Office 3 Metro Center Suite 610 Bethesda, Maryland 20814 Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502 l

i e

i

~4-MAY - 51997 I bec to DCD (l001) l bec distrib, by RIV:

Regional Administrator Resident inspector l DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) l DOCUMENT NAME: G:\DRPDIR\SPPR\WAT.LTR To receive copy of document, Indicate in box: "C" = Copy withoty' enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D ,l C:DRP/D ,llfD:DRSj l D:DRP J ,

GAPick;cmM PHHaff AT,Hol// ell TPG,wynn V/ ,/

04/g4 ;/97 04/9)797 0% /97 04/ { /97 l OFFICIAL RECORD COPY l

l

MAY - 5 1997

~

bec to DCD (IEQ) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) l l

I i

I I

l DOCUMENT NAME: G:\DRPDIR\SPPR\WAT.LTR To receive copy of document. Indicate in box: "C" = Copy withotf enclosures "E" = Copy with enclosures "N" = No copy PE:DRP!D , C:DRP/D ,[Q/D:DRSj( D:DRP g , l GAPick;cm%' PHHa g AT_Hof#cti TPG,wynn V/ ,/

04/6 /97 04/917%7 Of*f /97 04/{/97 OFFICIAL R ECOT3D COPY

ENCLOSURE WATERFORD 3 INSPECTION PLAN 1

IP - Inspection Procedure Ti - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS INSPECTION PROGRAM AREA INSPECTORS IP 73753 lNSERVICE INSPECTION 1 04/21-25/97 CORE INSPECTION IP 92903 ENGINEERING FOLLOWUP 1 04/21-25/97 REGIONAL INITIATIVE - APP. R, RCP OIL FILL SYSTEM IP 92903 SSFl FOLLOWUP 1 04/28-05/02/97 REGIONAL INITIATIVE - SSFI FOLLOWUP OR UNRESOLVED ITEMS IP 92902 MAINTENANCE FOLLOWUP 1 08/25-29/97 REGIONAL lNITIATIVE IST FOLLOWUP IP 83750 OCCUPATIONAL RAD;ATION EXPOSURE 2 09/15-19/97 CORE INSPECTION IP 37550 ENGINEERING 4 09/15-19/97 CORE INSPECTION 09/29-10/03/97 Tl MALEVOLENT USE OF VEHICLES AT 1 09/22-26/97 HEADQUARTERS INITIATIVE 2515/132 NUCLEAR POWER PLANTS IP 71001 OPERATOR REQUAUFICATION PROGRAM 2 09/29-10/03/97 CORE INSPECTION EVALUATION IP 82301 EVALUATION OF EXERCISES FOR POWER 5 11/03-07/97 CORE INSPECTION j

REACTORS

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _