TXX-3089, Forwards Sys Stability Study,1980-1982, to Assist in Review of Facility FSAR
(Redirected from ML20148B544)
Jump to navigation
Jump to search
| ML20148B544 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/17/1980 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Baer R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20148B550 | List: |
| References | |
| TXX-3089, NUDOCS 8001220408 | |
| Download: ML20148B544 (1) | |
Text
-
Log 0 TXX-3089 Fiie 10010 TENAS UTILITIES GENERATING CO.TIPANY 2001 DHYAN TOWER
- DALL.AM. TEXA8 75201
.... A.i?.*,"....,,,
January 17, 1980 ApeO GENEReg M AN AGER Mr. Robert L. Baer Chief Light Water Reactors Branch No. 2 Division of Project Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 GRID STABILITY STUDY
Dear Mr. Baer:
In response to the request of Spottswood Burwell, the following report is attached to assist in the review of the CPSES FSAR:
1980-1982, Texas Utilities Company System Comanche Peak Stability Study Respectfully yours, AfJ. Gary R.
RJG:skf Attachment 90028301 Mh,,
80 c12 2 0 4 0 E'