Advises Util of NRC Planned Insp Effort Resulting from River Bend Semiannual Plant Performance Review Completed on 970325.Details of Insp Plan for Next 8 Months Encl
ML20148B537
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9705130131
Download: ML20148B537 (6)


Text

- . . - - . - . ~ . . - . ~ . ~ .. - - - - - - . . _ - ~ . _ _ - . . - . . . - . . - . - . . - - . ~ ~ . ~ ~ ,

8 "' Cuc , UNITED ST ATES f,, . ]t NUCLEAR REGULATORY COMMISSION 1

l h!

o 1 b $

e REGloN IV 3$' *

  • 5

/ 611 RY AN PL AZA DRIVE, SUITE 400 4

9 # AR LINGToN, T E XAS 76011 8064

.f HAY - 5 mi John R. McGaha, Vice President - Operations i River Bend Station Entergy Operations, Inc.

P.O. Box 220 l

St. Francisville, Louisiana 70775

{

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) - RIVER BEND i

Dear Mr. McGaha:

On March 25,1997, the NRC staff completed the SPPR of River Bend. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding j of safety performance. The results are used by NRC management to facilitate planning and i allocation of inspection resources. The SPPR for River Bend involved the participation of all

! technical divisions in evaluating inspection results and safety performance information for 1

the period October 1996 through March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic i

Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the River Bend SPPR review. It is provided to minimize the resource impact on your staff and to allow for

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival ~ l l onsite. The enclosure details our inspection plan for the next 8 months. The rationale or
basis for each inspection outside the core inspection program is provided such that you are j aware of the reason for emphasis in these program areas. Resident inspections are not

! listed due to their ongoing and continuous nature.

l We willinform you of any changes to the inspection plan. If you have any questions, l

please contact Phil Harrell at (817) 860-8250.

1 I

! Sincerel ,

1

} -

/

Thomas P. Gwynn, ire or

, Division of Reactor ro' cts Docket Nos.: 50-458-j License Nos.: NPF-47 1

Enclosure:

gO3 $

i Inspection Plan I k

(

9705130131 970505 ll 11H llll lll 11 1 I l n PDR ADOCK 05000458 ll* ll1i agig igi ll l l l ll PDR *o < -

G .

i

2 .

Entergy Operations, Inc. )

1 cc w/ enclosure:

Executive Vice President and

Chief Operating Officer Entergy Operations, Inc. '

P.O. Box 31995 l Jackson, Mississippi 39286-1995

Vice President j Operations Support l Entergy Operations, Inc.

3 P.O. Box 31996 Jackson, Mississippi 39286-1995 i  !

3 General Manager Plant Operations l River Bend Station

! Entergy Operations, Inc.

4 . P.O. Box 220 2

St. Francisville, Louisiana 70775 i Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark-J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 l

l l

l l

l l

- .-. . .- . . - - . . - . . - _ _ _ ~ . . . - . . - . . . - - - - - . . . . - . - - - - . . . - . _ . . .

1 -

i

. Entergy Operations, Inc. .

l I

i i

H. Anne Plettinger j

3456 Villa Rose Drive j s

Baton Rouge, Louisiana 70806 '

j j President of West Feliciana Police Jury ,

j P.O. Box 1921 i St. Francisville, Louisiana 70775 4

Larry G. Johnson, Director Systems Engineering Cajun Electric Power Coop. Inc.

10719 Airline Highway P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 I

^4-MAY - 5 1997 bec to DCD (IE01) bec distrib. by RIV:

Regional Administrator Senior Resident inspector (Grand Gulf)

DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) Resident inspector 1

l l

l DOCUMENT NAME: G:\DRPDIR\SPPR\RB.LTR j To receive copy of document, indicate in box: "C" / Copy wthof enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D ,

C:DRP/D ,,

I f D:DRSf Jf) D:DRP p), 1 GAPick;cng PHHarfeg $C ATHodelf TPGwynn [Q O4/13 /97 04/\% 737 O$/' /97 Og/ f /97 ' V a

OFFICIAL RECORD COPY 1

~4-MAY - 5 .997 bec to DCD (IE01) l bec distrib. by RIV:

Regional Administrator Senior Resident Inspector (Grand Gulf) i' DRP Director DRS-PSB j Branch Chief (DRP/D) MIS System i Project Engineer (DRP/D) RIV File i Branch Chief (DRP/TSS) Resident inspector e

=d i

1 1

DOCUMENT NAME: G:\DRPDIR\SPPR\RB.LTR- j To receive copy of document, Indicate in box: "C"/ Copy withof enclosures "E" = Copy we enclosures "N" = No copy PE:DRP/D ,

C:DRP/D ,t/ D:DRSf C D:DRP p),

GAPick;cq C PHHa @ ATHowell' TPGwynn M 04/ 6 /97 04/ \% 7B7 08/ 1 /97 Of/( /97 ' V OFFICIAL RECORD COPY

ENCLOSURE RIVER BEND STATION l

l INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLEI NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS

- muummumummmmumusumummmmmmmmmmmmu Tl FIRE PROTECTION FUNCTIONAL 5 06/16-20/97 PILOT INSPECTION EFFORT BY HEADQUARTERS 2515/xxx INSPECTION 06/30-07/03/97 IP 81700 PHYSICAL SECURITY PROGRAM 2 06/23-27/97 CORE INSPECTION 1 08/04-08/97 IP 86750 SOuD RAD WASTE MANAGEMENT AND 1 07/14-18/97 CORE INSPECTION TRANSPORTATION OF RAD MATERIAL N/A INITIAL OPERATOR EXAMS 2 07/28-08/01/97 INITIAL OPERATOR EXAMS IP 73753 INSERVICE INSPECTION 1 09/15-19/97 CORE INSPECTION IP 92902 FUEL INTEGRITY AND REACTOR 1 09/29-10/03/97 FOLLOWUP OF PREVIOUS FIRS INSPECTION SUBCRITICALITY IP 73756 INSERVICE TESTING 2 12/08-12/97 REGIONAL INITIATIVE IP 71001 LICENSED OPERATOR REQUALIFICATION 3 12/1-5/97 CORE INSPECTION PROGRAM EVALUATION