Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review Completed on 970326. Details of Insp Plan for Next 8 Months Encl
ML20148B474
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Horn G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 9705130109
Download: ML20148B474 (6)


Text

.

/* "'%

t UMTED STATES g

f NUCLEAR REGULATORY COMMISSION f

A EGION IV 611 Rv AN PL AZ A DR6VE SUIT E 400 1,.

A4LsNGTON TE XAS 76011 8064

....+

MAY - 5.aiJ G. R. Horn, Senior Vice President of Energy Supply Nebraska Public Power District 141415th Street Columbus, Nebraska 68601

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- COOPER NUCLEAR STATION

Dear Mr. Horn:

On March 26,1997, the NRC staff completed the SPPR of Cooper Nuclear Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Cooper Nuclear Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Cooper Nuclear Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. The regional initiative inspection scheduled is consistent with SALP assessments. Resident inspections are not listed due to their ongoing and continuous nature.

\\

We willinform you of any changes to the inspection plan, if you have any questions, please cor, tact E. Collins of my staff at (817) 860-8291.

Sincerely, homas P. Gwynn, ir tor Division of Reactor Jects

Enclosure:

Inspection Plan Docket No.: 50-298 I

',\\

License No.: DPR-46 l

9705130109 970505 g,

ADOCK 050002 8 gDR L

Nebraska Public Power District )

)

l Docket No. 50-298 License No.. DPR-46 s

cc w/ enclosure:

i John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68602-0499 P. D. Graham, Vice President of Nuclear Energy Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 B. L. Houston, Nuclear Licensing and Safety Manager Nebraska Public Power District j

P.O. Box 98 Brownville, Nebraska 68321 R. J. Singer, Manager-Nuclear Midwest Power 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303 Mr. Ron Stoddard Lincoln Electric System 11th and O Streets Lincoln, Nebraska 68508 Randolph Wood, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street i

Auburn, Nebraska 68305 4

4 k_

'O Nebraska Public Power District,

4 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South 4

P.O. Box 95007 Lincoln, Nebraska 68509-5007 j

l Dr. Mark B. Horton, M.S.P.H.

Director Nebraska Department of Health P.O. Box 950070 Lincoln, Nebraska 68509-5007 R. A. Kucera, Department Director of Intergovernmental Cooperation i

Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Kansas Radiation Control Program Director 1

j s

i i.

i l

1 Nebraska Public Power District !

MAY - 51997 4

i bec to DMB (IE01)

+

bec' distrib. by RIV:

E. W. Merschoff Resident inspector i

j DRP Director DRS-PSB j

Branch Chief (DRP/C)

MIS System i

4 Branch Chief (DRP/TSS)

RI V File 3

Project Engineer (DRP/C) i R. V. Azua, DRP i

i l

i ii

.I l-i DOCUMENT NAME: G:\\DRPDIR\\SPPR\\CNS.LTR

" To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy C:DRP/Cgj D:DRM D:DRP BJ EEQollins;c'ni ATHbWdit TP,Gvyynn GY'y'

'4D / /97 s/9 /97 3/ ( /97 OFFIC;AL RECORD col'Y R

Nebraska Public Power District MAY - 5.ssi bec to DMB (IE01) bec distrib. by RIV:

E. W. Merschoff Resident inspector DRP Director DRS-PSB Branch Chief (DRP/C)

MIS System Branch Chief IDRP/TSS)

RIV File Project Engineer (DRP/C)

R. V. Azua, DRP 4

i i

I l

l i

DOCUMENT NAME: G:\\DRPDIR\\SPPR\\CNS.LTR To receive copy of docurnent, indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy 1

C:DRP/C(j l

D:DRg D:DRP

[J l

EE,Gollins;c'rn ATH6%dil TPGvyynn (JTY 4h / /97

% /97 g/ ( /97 OFFICIAL RECORD COPY A

F ENCLOSURE COOPER NUCLEAR STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE /

NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS TI-132 Malevolent Use of Vehicles 1

7/7-12/97 Safety initiative IP 37550 Focus inspection 3'

tentative Regional Initiative IP 61725 Surveillance 2

7/28 - 8/1/97 Regional Initiative IP 37550 Focus Inspection 3'

tentative Regional Initiative IP 71001 Licensed Operator 1

11/17-21/97 Regional Initiative Requalification Program Evaluation

- Tentative dates and team sizes

-.