Advises of Planned Inspection Effort Resulting from 970325 Grand Gulf Semiannual Plant Performance Review.Details of Inspection Plan for Next 8 Months Encl
ML20148B411
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9705130077
Download: ML20148B411 (6)


Text

. .-. . . . - , . ~ . - - . . . - - - . - . - - - _ . . - . . .-_ - . _ - _ . .

I e ppREGO UNITED ST ATES O ft NUCLEAR REGULATORY COMMISSION 4

REGloN IV 7'( t S$ 4 611 RY AN PLAZA DRIVE, SUITE 400 f %b*"** E AR LINGToN, TE X AS 76011 8064 MAY - 5 1997 i

Joseph J. Hagan, Vice President Operations - Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756

)

l

Port Gibson, Mississippi 39150 l

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) - GRAND GULF l

Dear Mr. Hagan:

I On March 25,1997, the NRC staff completed the SPPR of Grand Gulf. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding l of safety performance. The results are used by NRC management to facilitate planning and  !

allocation of inspection resources. The SPPR for Grand Gulf involved the participation of all technical divisions in evaluating inspection results and safety performance information j for the period October 1996 through March 1997. SPPRs provide NRC management with l a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Grand Gulf SPPR j review. It is provided to minimize the resource impact on your staff and to allow for scheculing conflicts and personnel availability to be resolved in advance of inspector arrival ,

onsite. The enclosure details our inspection plan for the next 8 months. The rationale or l basis for each inspection outside the core inspection program is provided such that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan, if you have any questions, .

please contact Phil Harrell at (817) 860-8250. l Sincerel ,

/ I -

/} .

Thomas P. Gwyn , Di et l Division of Reacto P jecs Docket Nos.: 50-416 License Nos.: NPF-29 1

Enclosure:

Inspection Plan {

n 9705130077 970505 PDR ADOCK 05000416 G PDR

,i J

Entergy Operations, Inc. cc w/ enclosure:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, D.C. 20005-3502 Sam Mabry, Director Division of Solid Waste Management Mississippi Department of Natural Resources P.O. Box 10385 Jackson, Mississippi 39209 President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Manager of Operations Bechtel Power Corporation P.O. Box 2166 Houston, Texas 77252-2166 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 The Honorable William J. Guste, Jr.

Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 u

Entergy Operations, Inc. 1 Office of the Governor State of Mississippi Jackson, Mississippi 39201 l

Mike Moore, Attorney General Frank Spencer, Asst. Attorney General l State of Mississippi P.O. Box 22947 Jackson, Mississippi 39225 Dr. F. E. Thompson, Jr.

State Health Officer l State Board of Health  ;

P.O. Box 1700 l Jackson, Mississippi 39205 l l

Eddie S. Fuente, Director l State Liaison Officer l Division of Radiation Health Mississippi Department of Health P.O. Box 1700 Jackson, Mississippi 39215-1700 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 Vice President, Operations Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 m

l

  • l

~#~

MAY - 51997 I l

l bec to DCD (IE01) bec distrib. by RIV:  !

l Regional Administrator Senior Resident inspector (River Bend)  ;

DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) Genior Resident inspector (Grand Gulf) l I

l l

1 l

J l

l DOCUMENT NAME: G:\DRPDIR\SPPR\GG.LTR To receive copy of document, Indicate in box: *Cf = Copy withe enclosures "E" = Copy we enclosures "N" = No copy PE:DRP/D , C:DRP/D , ,gD:DRS(p) D:DRP j),

GAPick;cmW PHHarhR ATHowe'Tl TPGwynn (/ [ l 04/ \b7 W 04/ Q /97 04/ )/97 Of/ f /97 OFFICIA'L RECORD COPY i i

L

f l

MAY - 5 1997 l

bec to DCD (IE01) i bec distrib. by RIV:

Regional Administrator Senior Resident Inspector (River Bend)

DRP Director DRS-PSB Branch Chief (DRP/D) MIS System Project Engineer (DRP/D) RIV File Branch Chief (DRP/TSS) Senior Resident inspector (Grand Gulf)

DOCUMENT NAME: G:\DRPDIR\SPPR\GG.LTR /

To receive copy of document, indicate in box: "C] = Copy wthpt enclosures "E" = Copy with enclosures "N" = No copy PE:DRP/D ,l C:DRP/D l, gj,D:DRS((J) D:DRP l_ p, l GAPick;cmW PHHargg ATHope71 TPG,wynn (/ [

04/ Q /97 04/ \h7JT 0$/ )/97 Of/ f /97 OFFICIA1 RECORD COPY k s

r ,

ENCLOSURE GRAND GULF INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBFR OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 40500 EFFECTIVNESS OF LICENSEE CONTROLS 3 05/19-23/97 CORE INSPECT!ON FOR lDENTIFYING, RESOLVING, AND 06/02-06/97 PREVENTING PROBLEMS T12515-132 RADIOLOGICAL TRANSPORTATION 1 05/19-23/97 HEADQUARTERS INITIATIVE IP 86750 SOuD RADWASTE MANAGEMENT AND 1 06/02-06/97 CORE INSPECTION TRANSPORTATION OF RAD MATERIAL IP 84750 RADIOACTIVE WASTE TREATMENT, 1 06/02-06/97 CORE INSPECTION AND EFFLUENT AND ENV. MONITORING IP 81700 PHYSICAL SECURITY PROGRAM FOR 1 06/02-06/97 CORE INSPECTION POWER REACTORS 07/14-18/97 IP 82701 OPERATIONAL STATUS OF EMERGENCY 2 06/23-27/97 CORE INSPECTION PREPAREDNESS PROGRAM IP 83750 OCCUPATIONAL RADIATION EXPOSURE 1 07/14-18/97 CORE INSPECTION IP 62700 MAINTENANCE lMPLEMENTATION 1 07/28-08/01/97 REGIONAL INITIATIVE - SALP BOARD

. RECOMMENDATION IP 82301 EXERCISES EVALUATION 5 09/15-19/97 CORE INSPECTION lP 71001 OPERATOR REQUALIFICATION PROGRAM 3 09/29-10/03/97 CORE INSPECTION EVALUATION

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . ._