..m m
_m.
e
. f "' %,4 OV
- STATES
)'
[,,
,k NUCLEAR REGULATORY COMMISSION R EGION IV 3
[
611 RY AN PL AZA DRIVE. SUITE 400 I
'h
,.3 AR LING ton, TE X AS 76011 8064 MAY - 5 E7 1
S. K. Gambhir, Division Manager i
Production Engineering Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun l
Fort Calhoun, Nebraska 68023-0399 SU8 JECT: SEMIANNUAL PLANT PERFORMANCE REVIEW - FORT CALHOUN STATION i
i
Dear Mr. Gambhir:
l On March 26,1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Fort Calhoun Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Fort Calhoun Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period i
October 1996 through March 1997. SPPRs provide NRC management with a current j
summary of licensee performance and serve as inputs to the NRC Systematic Assessment I
of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.
1 This letter advises you of our planned inspection effort resulting from the Fort Calhoun Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of i
inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.
l The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.
We willinform you of any changes to the inspection plan. If you have any questions, 1
please contact W. D Johnson at (817) 860-8148.
j Sincerely, i
A 9705130056 970505 Thomas P. Gwynn Dir ctor DR ADOCK 050002 5 Division of Reacto P jects Docket Nos.: 50 285 l
License Nos.. DPR-40 l
f fh
\\
~
l
- 6 Omaha Public Power District.
1
Enclosure:
inspection Plan cc w/ enclosure:
James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399 Hwy. 75 - North of Fort Calhoun i
Fort Calhoun, Nebraska 68023-0399 j
James W. Chase, Manager Fort Calhoun Station P.O. Box 399 I
Fort Calhoun, Nebraska 68023 Perry D. Robinson, Esq.
Winston & Strawn 1400 L. Street, N.W.
Washington, D.C. 20005-3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Cheryl Rogers, LLRW Program Manager Environmental Protection Section Nebraska Department of Health 301 Centennial Mall, South.
P.O. Box 95007 Lincoln, Nebraska 68509-5007
i Omaha Public Power District MAY - 5 1997 bec to DCD (IE01) bec distrib. by RIV:
Re0 onal Administrator DRS-PSB i
i DRP Director MIS System i
Branch Chief (DRP/B)
RIV File Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector l
4 l
l I
i l
i To receive copy at document, indicate in exyy "c" = copy wit enclosures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B (f D:DRyh D:DRP M,
l DNGraves;df p WDJohnpipn.
ATH6 4tl TPGwynn [7 l
- V l
4/l(/97 4/ )l /97 "
Jy {/97 f/ { /97 OFFIC' AL RECORD COPY i
O
f JV)
Omaha Public Power District MAY - 5 Wi bcc to DCD (IE01) bec distrib. by RIV:
i Regional Administrator DRS-PSB DRP Director MIS System Branch Chief (DRP/B)
RIV File Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector i
1 l
i i
e 2
l
)
To receive copy of document, indicate in boz: "C" = Copy w enck>sures "E" = Copy with enclosures "N" = No copy
~
RIV:PE:DRP/B C:DRP/B (f D:DR$h D:DRP M,
j DNGraves;df p WDJohnyph
/)TH6%611 TPGwynn [7 4/ l\\ /97 4/ il /97 "
A/ - { /97 f/ ( /97 "V
j OFFIClAL RECORD COl2Y l
s i
i L;-
i
ENCLOSURE FORT CALHOUN STATION INSPECTION PLAN IP - Inspection Procedure Ti - Temporary Instruction Core inspection - Minimum NRC inspection Program (mandatory all plants)
INSPECTION TITLE /
NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS mumumuseuumummuus-IP 37550 Engineering 3
04/14-18/97 Core inspection 04/28-05/2/97 IP 64704 Fire Protection 1
04/14-18/97 Core Inspection 04/28-05/2/97 IP 37001 10 CFR 50.59 Evaluation Program 1
04/14-18/97 Regional Initiative IP 82701 Operational Status of the EP Program 2
05/05-09/97 Core Inspection IP 81700 Physical Security Program 2
05/12-16/97 Core inspection IP 82301 Emergency Preparedness Exercise 2
06/02-06/97 Core Inspection Tl 2515/132 Malevolent Use of Vehic'es at Nuclear 1
06/23-27/97 Temporary Instruction Power Plants IP 84750 Environmental Monitoring 1
07/14-18/97 Core inspection IP 40500 Effectiveness of Licensee Controls in 3
06/30-7/3/97 Core Inspection identifying, Resolving, and Preventing 07/14-18/97 Problems IP 83750 Occupational Radiation Exposure 1
07/14-18/97 Core Inspection
-