ML20148B300

From kanterella
Jump to navigation Jump to search
Mod 5,superceding Mods 2,3 & 4 by Increasing Funds,To Assessment of Tornado Risk & Analysis of Near Ground Tornadic Wind Fields
ML20148B300
Person / Time
Issue date: 01/04/1980
From: Jackie Jones, Morton K
NRC OFFICE OF ADMINISTRATION (ADM), TEXAS TECH UNIV., LUBBOCK, TX
To:
Shared Package
ML20148B299 List:
References
CON-NRC-04-76-345, CON-NRC-4-76-345 NUDOCS 8001220091
Download: ML20148B300 (4)


Text

._. _ _ . _ _ _ _ .. ._. - _ _ . _ _

~

l'odi fica tico No. 5

- - ,,,-u-- u . .

SUTPLEMENTAL AGREEi'EllT BETWEEN TEXAS TECH UNIVERSITY AND THE U. S. NUCLEAR REGULATORY COMMISSION .

THIS SUPPLEMENTAL AGREEMENT, effective the 8th day of November ,1979, by and between the UNITED STATES OF AMERICA (hereinafter referred to as the

" Government"), as represented by the UNITED STATES NUCLEAR REGULATORY COMMIS-SION (hereinafter referred to as the " Commission"), and TEXAS TECH UNIVERSITY (hereinafter referred to as the " Contractor"),

WITNESSETH THAT:

WHEREAS, the parties desire to modify Contract No. NRC-04-76-345 as hereinafter provided, and this supplemental agreement is authorized by law, including the Energy Reorganization Act of 1974, as amended, and the Atomic Energy Act of 1954, as amended.

NOW, THEREFORE, said contract is hereby modified as follows:

1. Appendix A, attached to this supplemental agreement and made a part hereof, supersedes in its entirety the Appendix A of flodification Nos. 2, 3, and 4 of this contract, and provides for the research to be performed by the Contractor during the contract period specified therein. -
2. In Article III - Consideration, the sum "$324,393.00" is substituted for the sum "$232,566.00."

e 96024005 W*I JP1101220

l ,

i.

  • ' ..:4 ie..:n;:.i A;r n .x *.,-

Contract tio. tiRC-C '-76-3; CC:CF. ACTC T.: TEXA5 TECH UNIVERSITY AFTEi? DIX A For the Contract period October 1,1977 through September 30, 1980 Article A-I RESEARCH TO SE PERf0 FED SY CONTRACTOR (a) The scope of work under this contract is unclassified and shall be in accordance with Contractor's proposal entitled, " Assessment of Tornado Risks and Analysis of Near Grcund Tornadic Wind Fields" which is hereby incorporated by reference and made a part hereof. In addition, the Contractor shall perform the following special tasks during FY 1979:

1) Assess the tornado and extreme wind hazard probability for the Bethesda, !!aryland area; 2) Evaluate the potential consequences arising from windspeeds in excess of design values for locations containing ADP -

facilities; 3) Prepare a report upon accomplishing the above two tasks.

(b) Tne Principal Investigator expects to devote the following approximate amount (s) of time to the contract work:

Dr. J. R. ficDonald - 100" of his time for 33 man-months Dr. J. E. f4inor - 100% of his time for 12 man-months .

ARTICLE A,II WAYS AND MEANS OF PERFCRMANCE (a) Items for which support will be provided as indicated in A-III, below Salaries and Wages S 140,234.00 (1)

(2) Equipment'to be purchased or fabricated by the Contractor $ 5,995.00 Items under $1,000.00 Items over $1,000.00 Slidecopier SLR Camera Enlarger tiotion Picture Slide Printer Analyzer Optical 14cvie i Printer

~

(3) Travel 7,500.00 (i) Domestic $

l (ii) Foreign 5 I

(4) Other direct costs including fringe benefits Indirect costs based on a predetermined rate of E percent applicable (5) to salaries and wages for the period 10/1/77 - 8/31/ 9 and 49 percent for the period 9/1/79 - 9/30/80.

2

. ~99024006 l

5

. __ sll. ... . . .

Su:plementai Agreeme-: to Cen:rt:- ':. NRC-04 f-335 (b) Ite s, if any, significant to the performance of this contract, but excluded frcm ccmputatico of Support Cost and frca consideraticn in pr: portioning costs:

NONE (c) Time or effort of principal Investigator (s) including indirect cost; and fringe benefits contributed by Contractor but excluded from ccm-putation of Support Cost and frcm consideration in proportioning costs:

NONE Article A-III The total estimated cost of items under A-II(a) above for the contract period stated in this Appendix A is $257,670.00 ; the Commission will pay 100 percent of the actual costs of these items incurred during the contract period stated in this Appendix A, subject to the provisiens of Article III and Article S-XXVIII. The estimated NRC Support Cost for the contract period stated in this Appendix A is 5257,670.00 .

The estimated NRC Support Cost is funded as follows: .

Estimated unexpended balance from prior period (s) $ (a)

New funds for the current period $ 257,670.00 (b)

(c) The new funds being added in A-III(b) constitute the basis for advance payments provided under Article B-X.

. \

M e

., ..e '.t re ; t

..D v-U J , .

C

r. ,;-

2 L',liiD $il .i .

' ;. I C L EY: -

Kellogg V. I!orton, Chief Research Contrac.ti,Br)anch. (title f'uclear Regulatory Commission TEXAS TE LI VI.o bl TY BY. SW.i , )./

7 .

Kriox [or es,f).

1 e Pret1)ent "

%.r Research (title)

I, Freda Pierce

, certify that I am the (attesterT Secret ary, Board of Regents ~ of the Contractor named (title) under this document; that J. Knox Jones, J r.

(signatory) who signed this document on behalf of said Contractor was then Vice President for Research of said Contractor; that this document was duly signed for and on behalf of said Contractor by authority of its governing body and is within the scope of its legal p c.s e rs .

1;' WlINESS WHEREOF, I have hereunto affixed my hand and the seal of l said Cor, tractor.

't  !

a ~. -

If D[.. Y- . - l E'. AAA l (SEAL) -

1 l

90024008 ,

. 1 l