unnmonwealth 1:di.on Company O
Zion Generating Station M-101 $hilatiIk>ulevard Zion IlldN)992797 Tel 8 67-742081 ZRA97004 May 7,1997 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Commonwealth Edison's reply to Zion Station Units #1 & #2 Operational Safeguards Response Evaluation (TAC Nos. M95849 & M95850)
Reference:
Letter to Thomas Maiman (Comed) from Le Moine J. Cunningham, [USNRC]
dated 01-13-97.
Gentlemen:
The reference 1 letter identified two (2) concerns in the area of Operational Safeguards Response Evaluation. This letter and its attachments constitutes Comed's reply.
Zion undertook prompt and broad corrective actions including numerous drills and exercises to resolve the concerns stated in the referenced letter. The attachment to this letter provides a j
summary of our actions taken.
Additionally, Zion Station.:uccessfully demonstrated its ability to meet the Design Basis Threat in these areas during an O.S.R.E. follow-up inspection conducted on April 28-29,1997.
Sincerely,.
b,).
.H. Mueller Site Vice President Zion Station j
cc:
Regional Administrator, USNRC - Region III Senior Project Manager, USNRC - NRR Project Directorate III-2 Senior Resident Inspector, Zion Nuclear Station
[
(