ML20148B239

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Request for Addl Info Re Util 791004 Request for Tech Spec Change for Reload 3.Revisions to Tech Specs Encl
ML20148B239
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/15/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML20148B243 List:
References
NUDOCS 8001210265
Download: ML20148B239 (4)


Text

.. _..-

~~I Ti}il

~

400 Chestnut Street Tower II January 15, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. Thomas A. Ippolito, Chi..r Branch No. 3 Division of Operating Res U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Ippolito:

In the Matter of the

)

Docket No. 50-259 Tennessee Valley Authority

)

Enclosed is a partial response to an informal request for additional information from your staff regarding the requested technical specification change for Browns Ferry unit 1 reload 3 submitted by my letter to H. R. Denton dated October 4, 1979 (TVA BFNP TS 131).

provides answers to those questions which require an answer. As appropriate, the answers provided in Enclosure 1 for Browns Ferry unit 1 are equally applicable to unit 2. provides revisions to the unit 1 technical specifications originally submitted by request TVA BFNP TS 131.

We have requested assistance from General Electric on the remainder of the questions and expect their response very soon.

Their response will be forwarded to you as soon as possible.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosures Aooi s

/

//

9 @ 25029 g.6 f

n. n,..,, -,

9,,,o f-

ENCLOSURE 1 RESPONSE TO NRC REQUEST FOR INFORMATION REGARDING BROWNS FERRY UNIT 1 RELOAD 3 Question - Page 97 - Discuss the elimination of reactor low pressure instrumentation surveillance requirements.

Provide safety functions of instrumentation.

Response: The subject instrumentation was used only in the loop select logic and was removed as part of the modification that eliminated the loop select logic of the LPCI mode of the RER system. The surveillance requirement for these instru-ments on page 97 should have been deleted earlier.

Question - Pages 111 and 182 - Discuss the reason for these changes.

Is LPCI loop selection logic eliminated?

Response: The proposed changes on pages 111 and 182 are a result of the elimination of the RHR LPCI loop select logic which has been completed for all units at Browns Ferry.

Question - Page 157 - Recommend require daily HPCI surveillance when RCIC inoperable.

Response: The proposed change was intended only to make the surveillance requirement agree with the Limiting Conditions for operation.

The stated surveillance test requirements are fully adequate, end therefore, no further changes are proposed.

Question - Page 160 - It has been our understanding that the power spiking penalty is inherent in the 8x8 fuel LHGR limit.

Is this a double accounting of the penalty?

Response: GE to provide answer.

Question - Page 160 - Because of REDY code inaccuracies te prediction of RPT response, we have previously required a 3 increase in operating MCPR limits.

Provide additional jus, ation for proposed limits or appropriate additional margi Response: Until NRC's review of ODYN is complete, TVA's tr6 lent analyses will be based on the accepted REDY code.

TVA ackr, ' ledges that some uncertainty may exist in the ability of REDY t accurately predict pressurization rate in all cases.

However, overall, we believe that REDY provides a conservative calculation for the current licensing basis transients. Nevertheless, in order to account for any possible nonconservatisms of REDY, TVA commits to implement a ACPR penalty of.03 for the pressurization events for EOC-2000 mwd /t.

l 96025030

The unit 1 cycle 4 operating limit MCPR's should be revised as follows:

7x7 fuel; BOC 4 through EOC 4 :1.23 8x8 fuel; BOC 4 through EOC 4-2000 mwd /t :1.24 EOC 4-2000 mwd /t through EOC 4 :1.27 8x8R fuel; BOC 4 through EOC 4-2000 mwd /t :1.25 EOC 4-2000 mwd /t through EOC 4 :1.28 P 8x8R fuel; BOC 4 through EOC 4-2000 mwd /t :1,25 EOC 4-2000 mwd /t through EOC 4 :1.28 GZ to answer questions concerning NEDO-24209.

l t

9 J

l 90025031 i

ENCLOSURE 2 REVISIONS TO TECHNICAL SPECIFICATION REQUEST TVA BFNP TS 131 BROWNS FERRY NUCLEAR PLANT UNIT 1 l

l 90025032 u